What should I do after I get the house key? I'm ready to decorate. I haven't checked the house yet. Please place an order for me. Thank you.

Go to the property management department to check the information, and you can check the following documents: A. The House Quality Guarantee of the house-you can take it away.

B, "residential instructions"-can take away.

C, the completion acceptance record

D, area measuring table

E as-built drawings of pipeline distribution (water, strong electricity, weak electricity, structure)-can be taken away.

If the real estate agent is fully prepared, it will take 10 minutes to check the information.

2) Check the area, contract and price.

Confirm whether the attached drawings of the sales contract are consistent with the actual situation, whether the structure is the same as the original design, whether the house area has been measured by the real estate department and whether there is any difference with the area agreed in the contract. (check the house sales contract first to see what the error is, usually 3%. If the error is less than 3%, it will be ignored and the excess will be treated. It is suggested that the contract has an error of 2%, but it is best not to exceed 5%. ) The contract signed by both parties shall prevail. Generally, this time varies from person to person and lasts 30-40 minutes.

Acceptance of houses

After reading those materials, you can basically check and accept the house. Consultant Kevin suggested: don't pay some property fees and related expenses for the time being. At this time, the property will urge you to pay, and you can communicate with them. Payment can be made after acceptance. To get the key from the property management office, you should have several keys, such as floor key, access control key, email key, water meter and electricity meter (if there is a remote meter reading). Then you can go to see the house with the property manager. Remember to bring those tools. )

1) Check the house quality in detail, including whether there are cracks in doors, windows and balconies; (cracks in the balcony are dangerous)

Tip: because the new house is closed for a long time, there will be some dust and construction waste on the door and window tracks. Don't be impulsive. Pull doors and windows with brute force. When you feel blocked, take a closer look and sweep it with a broom.

2) Check the flatness of the wall surface for water seepage and cracks: especially check some walls, especially some gables, kitchen sanitary roofs, external walls and other places for water marks. If so, be sure to find out the reason as soon as possible.

3) Check the ground carefully, and check whether there is shell cracking on the ground.

Tip: If there is an empty drum, you must instruct the accompanying property personnel to repair it as soon as possible, otherwise it will easily wear out the floor in the decoration and hinder the neighborhood relationship. The above 2-3 items can be used as tools: small hammer and feeler gauge.

4) Water, electricity and coal are unblocked and can be used normally. Turn on the tap to check for leaks and blockages, so as to make the water flow as big and urgent as possible. First look at the water pressure. Second, try the drainage speed. Generally, a new house will be equipped with a simple faucet for the owner. Use a multimeter to measure whether each strong and weak current is unblocked.

Tip: Close the brakes and check whether each brake completely controls each branch line.

5) Acceptance and production. First, fill the basin with water, and then pour the water into all the sewage places, that is, basin water, bathtub water, bathroom water, kitchen sanitation and balcony floor drain. Basically, each drain should contain about two pots of water, with gurgling sound, and there should be no water on the surface.

Tip: after these things are done, make sure there are no problems. Cover these protruding drains (such as washbasin drain, bathtub drain and toilet drain) with plastic bags as soon as possible, and then tie them firmly. Drains such as floor drains need to be plugged firmly (remember to leave a place where they can be pulled off).

6) Acceptance of ground launch. Toilet drainage, just shallow (about 2cm high). Then make an appointment for the owner downstairs to check the smallpox in his toilet 24 hours later.

Tip: after all the water is used up, turn on the water meter again, see the number of the water meter clearly and record it. At the same time, you should record the number of the water meter.

7) Check the facilities and equipment specified in the sales contract, and check whether the facilities and equipment specified in the sales contract are omitted and whether the brand and quantity are consistent;

Tip: Usually, there should be no major problems in this area, but it really needs careful inspection.

8) Measure the height of the building, and sample the data source, location and specific data with a 5m tape measure. It is best to write down the water meter, meter number, building height, toilet pit distance, bathtub length and width, shower room size and ceiling height in your notebook, and also write down some data and problems of house acceptance on the paper provided by the property management company.

Finally, after checking these jobs, if there is no problem, then pay the money; If there is a problem, it is necessary to determine the solution and date with the property management personnel to see if the solution will affect the house collection. If there is, it is necessary to negotiate.

The process of house inspection is complicated, and there are many acceptance specifications involved. In addition to the above acceptance process, we should also pay attention to whether the profile material and building requirements meet the specifications and standards. If it exceeds the standard or fails to meet the design requirements, many hidden dangers will be buried in the later period, which will have a lot of influence on decoration and occupancy. It is suggested to invite a makeup inspector to conduct on-site inspection and issue a detailed report.

-provided by the new home inspection and house inspection departments.

* Efficient service team, engineers all hold the certificate of authorization for house inspection, and have been trained and tested for their posts, with high practical theoretical ability.

* Develop a professional housing inspection toolbox, equipped with multiple pieces of inspection equipment and tools, with more comprehensive inspection capabilities.

* Perfect acceptance basis. The inspection is based on the Shanghai local standard "one room and one inspection" and the national acceptance standard for construction projects.

* Strive to build the first brand of Shanghai third-party engineering inspection technical consulting service, and independently provide one-stop service before, after and after the house is closed.