Which departments need to approve the installation of elevators?

It needs to be approved by the local housing and construction bureau, the Bureau of Soil Regulation and the Market Supervision Bureau before the elevator can be installed.

However, local policies are inconsistent (taking Hebei as an example), and the following departments are needed:

1, entrusting the safety appraisal of the building structure. Entrusted by the construction unit to carry out safety inspection and appraisal of the original structure of residential buildings, the inspection and appraisal report shall be issued by the construction engineering quality inspection institution and the housing safety appraisal unit, or the seismic appraisal report shall be issued by the engineering design unit undertaking the additional design of elevators. If it is found that there is no hidden danger of structural safety in the inspection appraisal report or seismic appraisal report, elevators can be added.

2, planning review of construction projects. If an elevator is added to the existing building, and the elevator shaft is reserved when the original building is completed and accepted, there is no need to apply for the examination and approval of the construction project planning. If the elevator shaft is not reserved, the qualified architectural design unit shall first report the design scheme of elevator addition to the planning department for review, and issue a review opinion. In line with the planning and standards, enter the construction drawing design document procedure, and conduct the construction drawing design review in accordance with the regulations. According to laws and regulations, if fire control needs approval, it shall be handled in accordance with relevant regulations.

3, the construction review formalities. After the construction unit determines the elevator installation and construction unit with certain technical strength and management ability, it shall go through the supervision procedures of project quality and safety at the local administrative department of housing and urban and rural construction, and apply for construction record.

4, elevator construction notice and completion acceptance, elevator use registration.

Legal basis:

According to the "Property Management Regulations"

Forty-ninth public buildings and facilities built according to the plan in the property management area shall not be changed.

Owners need to change the use of public buildings and facilities according to law, and shall inform the realty service enterprise after handling the relevant formalities according to law; If the realty service enterprise really needs to change the use of public buildings and facilities, it shall be submitted to the owners' meeting for discussion and approval, and the owners shall go through the relevant formalities according to law.