Matters needing attention in office lobby decoration

There are many problems to be considered before office decoration, including fire fighting engineering, installation of central air conditioning, strong and weak current system engineering, and selection of office furniture. This paper will introduce in detail the matters needing attention in the decoration of office foyer.

fire engineering

Before office decoration, we need to consider the fire protection project. Office decoration needs to make some changes or cut it. If these projects are handed over to the owners or decoration companies, the examination and approval will take some time.

Install central air conditioning

Central air conditioning is installed in front of office decoration. Office decoration needs partitions to divide the space, so it is necessary to keep a certain number of central air conditioning outlets and air return outlets in each space, and to find a professional air conditioning installation company. Before the renovation, the air conditioning renovation plan should be submitted to the property company for review, and the as-built drawing should be provided after the completion.

Strong and weak current system engineering

Strong and weak current system engineering considered before office decoration. This is the most important point, which is related to the normal work of the company in the future. Wiring, actual measurement, reserved switch, socket and line direction are all planned in detail on the drawings, and the construction is carried out in strict accordance with the audited standards.

Selection of office furniture

Consider the choice of office furniture before decoration. Find a good furniture company before decorating office furniture, because most offices need high office partitions, and many lines and sockets must be connected with the partitions, so the furniture company must have close contact with electrical engineers, and the drawings must be confirmed by both parties first, then approved by the property management company, and can be safely started after the approval.