Handover preparation includes gfd inspection.

Pre-shift meeting is an important part of shift change. At the same time, gfd inspection, dress, post posture practice, cross-civilization language practice and duty precautions are implemented.

After the pre-shift meeting, the team leader leads the team to carry out post handover to ensure that the post handover meets the company standards. Handover is an important part of property security work, and whether handover is carried out according to specifications directly affects the quality of order maintenance.

Content of property transfer

1, the successor should arrive at the post ten minutes in advance and do a good job of succession.

2, check the work record, listen to the operation of the personnel on duty at work, and account for the unfinished work.

3. Count the number of instruments, tools, computer room keys and related fixed assets of this department, and sign the handover record.

4, check the equipment operation.

5. Check whether the valuables are complete.

6. Check whether the duty room is clean, whether the items are placed neatly and whether the keys are complete.

7, one of the following circumstances shall not be handed over, if necessary, immediately notify the engineering supervision to be present.

8. When the equipment records are inconsistent with the actual operation.

9. The number of successors is uneven or absent.

10, the mental state of the successor is not good, including fatigue, drunkenness, injury, etc.

1 1. When the equipment breaks down and is being repaired, both parties must hand it over and accept the same treatment.

12. When the equipment runs abnormally, the reason cannot be found out or the operation situation is unknown.

13. During the handover, it was found that the number of instruments, tools, computer room keys and related fixed assets of this department did not match the records on the list.