Job Recruitment Website - Property management company - Slag cleaning charge standard

Slag cleaning charge standard

Construction waste clearing fees can be charged by area or apartment type, with specific standards as follows: charged by area, generally not exceeding 3 yuan per square meter. ? According to huxing, the income of small huxing within 100 square meters generally does not exceed that of 200 yuan; 10 1- 150 square meters of medium-sized units, each household generally does not exceed 300 yuan; 150 square meter large apartment, generally not exceeding 500 yuan.

What is the charge standard of Shanghai construction waste clearing freight?

The charging price information of decoration garbage removal industry covers all the expenses needed in the process of removal service, including the sum of main business cost, period cost, fees, taxes and profits. In terms of pricing methods and standards, according to the first decoration and non-first decoration, it consists of two parts: basic area (55 square meters and below) and ultra-basic area. If the house renovated for the first time is within the fundamental product, each set will be collected in 400 yuan. If it exceeds the basic area, the corresponding clearing fee beyond the basic area will be charged according to the area, specifically, 6 yuan will be charged for every square meter of 55- 140 (including square meters), and 5 yuan will be charged for the part above 140 square meters. The calculation of moving expenses for non-first renovation is similar. Within the scope of basic products, 550 yuan is charged for each set, 8 yuan is charged for the part beyond the basic area, and 6 yuan is charged for the part above 140 (including square meters) per square meter.

To sum up, I suggest that you protect the environment and don't litter. It can also be understood that the cleaning fee for construction waste is calculated according to the area or apartment type.

Legal basis: Regulations on the Management of Urban Construction Waste

Article 20? Any unit or individual in any of the following circumstances shall be ordered by the competent department of city appearance and environmental sanitation of the city people's government to make corrections within a time limit, given a warning and fined:

(1) Mixing construction waste and domestic waste;

(2) mixing hazardous waste with construction waste;

(three) to set up a dumping site for receiving construction waste without authorization;