Decoration technology of fine decoration new house
(1) Pre-design
In the early stage of design, you must do it, that is, go to your room A for detailed measurement. The measurement contents mainly include:
1, the area involved in the decoration process. Especially in tile area, wall coating area, wallpaper area and building area;
2. Clear the size of the main wall. Especially it is necessary to design the wall size of furniture in the future. By the way, I would like to remind you that before starting work, don't forget to go to the property to complete the construction procedures and pay the decoration deposit.
(2) Demolition of main body
When entering the construction stage, the main body demolition is the first project, which mainly includes demolition, wall construction, wall peeling, plastic steel windows and so on. The main body of demolition is white, that is, the framework of the construction site is put together first.
(3) Hydropower transformation
Before the waterway reconstruction, the main structure was basically demolished. The first cabinet test should be carried out between hydropower transformation and main body demolition. In fact, the so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and the cabinet designer can't give specific design dimensions, just the location of the water inlet and the socket of the range hood reserved by the developer, and put forward some relevant suggestions.
(4) Woodworking
Woodworking, bricklayer and oiler are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic principle of appearance is-whoever is dirty comes first. "Dirty people first" is also one of the basic principles that determine the order of home improvement.
(5) Tiling
If the workers are too busy, the foreman will usually let the carpenter enter the tile before the "carpenter boss" has finished. This is normal, because the two do not conflict. In the process of "watt worker", the following three links are also involved:
1, door stone, marble windowsill installation. The installation of stone can be completed with paving bricks. After paving, marble thresholds are usually installed after the window sill is completed. Marble workers prepare glass glue and seal marble and curtains with glass glue. It is.
2. Install the floor drain. Floor drain is the first hardware in home decoration, because it will be installed with floor tiles. So when students start building materials, they should buy floor drains as soon as possible.
(6) Paint the wall
The "oil worker" comes into the market, mainly to do wall treatment, paint finish and brush furniture for the "carpenter boss". Students who are ready to paste wallpaper only need to let the "oil pan Lao San" carry out primary treatment on the wallpaper wall.
(7) Installation of water heater
Wall and floor decoration can inform the water heater of delivery and installation. Water heaters are generally installed in front of the ceiling, and gas water heaters have become a trend, generally installed in the kitchen or closed balcony. If it is an electric water heater, install it in the bathroom.
(8) Ceiling of kitchen and bathroom
Install the water heater, and then the ceiling. The kitchen and bathroom ceiling dominates the installation process, and they continue to "clear the package" at home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) in the kitchen should also be bought. Usually, the kitchen and bathroom are equipped with ceiling lamps and exhaust fans (toilets) at the same time.
(9) Cabinet installation
After the ceiling is finished, you can install the cupboard door. At the same time, there are sinks (which may not include the upper and lower water parts) and gas stoves. It is best to coordinate the gas supply to the property before the cabinet is installed, because the gas stove needs to be tested after installation.
(10) cookware for installing smoking machine
The installation of the range hood is best arranged on the day when the cabinet is installed, so as to facilitate the coordination between the two owners.
(1 1) wooden door installation
The second day after the cabinet was installed, after the wooden door was measured a month ago, it can be installed now. Hinge, door lock and floor suction head are installed at the same time as the door is installed. The production cycle of solid wood doors is generally one month. Therefore, in order to make the construction period close, it is necessary for wooden door manufacturers to go to the door to measure the size of the door as soon as possible after removing the main body. Everyone needs to pay attention to the handling of doorways. If the height of the doorway of the house is not consistent, workers need to process it into an outline-beautiful.
(12) Floor installation
The floor can be installed the day after the wooden door is installed. When installing the floor, please pay attention to the following questions:
1, before the floor installation, it is best to let the manufacturers visit. No matter whether the ground needs leveling or partial leveling, some decoration companies or teams will advise students to level or partially level according to the actual investigation of floor manufacturers;
2. Before the floor is installed, the floor laid at home should be clean, the ground should be dry, and no water should be used during the cleaning process.
(13) Paving wallpaper
The second day after the floor was installed, the house was cleaned and wallpaper could be pasted. If it goes well, it will be the same day. If possible, protect the floor on the day of sticking to the wall; It doesn't matter if there are no conditions. It is no problem to give the wallpaper glue left on the floor to Pioneer for cleaning.
(14) switch socket installation
In the bathroom, all sockets and switches must be waterproof and covered with sockets. At the entrance of the switch of the lamp, it is recommended to use induction or fluorescence to go home in the dark and keep it dark. There can be no more switch sockets, and at least one socket should be reserved where the sockets are placed.
(15) Lighting installation
Light up, nothing to say. After the lamps were installed, the house lit up, saying goodbye to the glare of 100 watt incandescent bulbs during the decoration process-it felt good.
(16) Hardware installation
Before buying pipes, bathroom accessories, toilets, clothes hangers, etc. , all installed. After installing "big things", the house is still very cold. When the lamps and hardware were installed, the family was "alive", really "alive".
(17) Installation of curtain rod
The installation of curtain rod marks the basic end of family decoration. You can breathe a sigh of relief, and the dark decoration that has been busy for a few days has finally ushered in the dawn.
(18) Pioneer Cleaning
Clean up before development, and don't install curtains. When starting a business, don't have furniture and unnecessary appliances at home, and try to keep it "flat" so that the business can be thoroughly cleaned.
(19) Furniture Introduction
As for the purchase time of furniture, my suggestion is that the water circuit should be reformed as soon as possible, so that you can choose furniture with basic size range.
The most detailed house decoration process in history.
(20) Household appliances
At this time, the introduction of home appliances, installation and installation, ready to stand by!
(2 1) Home Accessories
Home improvement, the last step of home improvement, has changed from decoration to decoration, including the installation of curtains, which are all part of home improvement. As for buying curtains, you'd better order furniture to avoid style conflict. Home accessories also include the possibility of buying some green plants, murals and displaying handicrafts. In short, you can play freely after you check in.
Decoration style quotation
Modern minimalist style:
Every family decoration should have a decoration design style. Different decoration styles give people different feelings. Modern minimalist style is relatively conservative. Generally speaking, this style is simple, lively and practical according to the traditional design style. Now more people will choose this style of decoration. This kind of decoration is to save money and be practical, not too fancy. All-inclusive: 650-680/m2 Half-inclusive: 350-380/m2.
Modern fashion style:
There are two styles of modern decoration, one is modern fashion style design, which is mainly based on the changes of new materials or new technologies and lighting, so that your home space has a sense of hierarchy, and a large number of different colors are used to create color difference, which will lead to exaggeration or a strange style. This kind is generally suitable for avant-garde young people to decorate. All-inclusive: 730-760/ m2 and half-inclusive: 380-4 10/ m2.
Nordic style:
For European and American design styles, many young people in China now like this simple and atmospheric decorative design. Strong lines, distinct layers, simple colors, the most obvious comfort experience. Simple, direct, practical and close to nature. All-inclusive: 820-860/ m2 and half-inclusive: 400-440/ m2.
Chinese style:
For the new Chinese style, China traditional culture is used for decoration. In this way, generally speaking, the elderly with old families at home will choose this decoration style, which looks healthy, cultured and nourishing. All-inclusive: 890-930/ m2 and half-inclusive: 450-500/ m2.
Mediterranean style:
For this style, generally speaking, it is suggested to match the space to make your house look more natural and harmonious, blend in with the nearby natural scenery, and give priority to blue, white and yellow to create a romantic atmosphere. Of course, the decoration in the house is the same. All-inclusive:1060-1100/m2 Half-inclusive: 500-550/ m2.
Southeast Asian style:
For the Southeast Asian style, the natural beauty of tropical rain forest is combined with strong national characteristics, giving people a sense of natural simplicity. Color matching is closer to nature. All-inclusive: 1200- 1300/ m2 Half-inclusive: 600-680/ m2
Note: The above decoration styles are only quotations, excluding indoor demolition, window sealing, furniture, TV background wall, scenic spots, architectural decoration and wooden ceiling decoration of guest rooms. If necessary, they can be based on site or design drawings.
Fine decoration new house decoration technology decoration style quotation
Bian Xiao Tuba Rabbit is here to introduce you to the above knowledge about the decoration technology and decoration style quotation of finely decorated new houses. If there is anything you need to know or don't know, if you want to know more about the decoration budget, please pay more attention to Tuba Rabbit, and Tuba Rabbit will provide you with more comprehensive, detailed and updated information.
Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~
- Related articles
- Hotels in Wuhan
- Why do you want to recruit new employees with work experience? Not necessarily related positions.
- What's the number of Luoyang jianxi district Tong Yuan Express?
- How about Xianyang Mediterranean Garden Community?
- Where is the central area of Nanping?
- Zhengzhou Xinhui property
- When will the TEDA style and blue sky in Chengdu be delivered?
- Some work of Longhu property manpower
- Can I refuse to pay the property fee if the property pipeline leaks without compensation?
- How about Xuchang Ke Rui Electric Appliance Co., Ltd.?