Job Recruitment Website - Property management company - For example, the high score is the declaration form of Beijing construction site fire control audit, thank you!
For example, the high score is the declaration form of Beijing construction site fire control audit, thank you!
(a) the fire supervision department is responsible for the following architectural design fire audit:
1. Public buildings with a building area of over 20,000 square meters (including 20,000 square meters);
2. Residential quarters with a construction area of 654.38+10,000 square meters (including 654.38+10,000 square meters);
3. Construction of industrial buildings (including Class A and Class B fire danger storage tanks, technical renovation projects and chemical devices) with an investment of more than 654.38 billion yuan (including 654.38 billion yuan);
4. National and municipal key projects;
5. Overall fire protection planning and design of urban areas, satellite cities and economic and technological development zones;
6. For projects that meet the above five standards in the Economic and Technological Development Zone, the audit department of the fire supervision department shall conduct a technical review of the audit of local fire control institutions before issuing a document.
7 other important projects that need to be audited by the fire supervision department.
(two) the fire audit of architectural design outside the above situation, in accordance with the supervision division of labor, respectively, by the county (District) fire department (large) team, fire supervision department (branch) is responsible for.
Handling institutions: Beijing Municipal Public Security Bureau Fire Department, Beijing District and County Fire Brigade (Team), Fire Supervision Department (Branch) Fire Audit Acceptance Room.
Address and telephone number:
Fire Audit Office of Beijing Public Security Bureau,No. 190, Xinei Street, Xicheng District, Beijing, 6224 1 188 ext. 2103,2133,2136.
8408 1 199, No.45 Daxing Hutong, Jiaodaokou, Dongcheng District, Beijing.
No.660523 133, Fu You Street, Xicheng District, Beijing.
No.0/9, Zuo 'an Neijie, Chongwen District, Beijing, China +025343
63034 185, No.27 Liangjiayuan Hutong, Xuanwu District, Beijing.
87649559, shibalidian South Bridge, Lvjiaying, Chaoyang District, Beijing, China.
Room 825 19790, Building 3, Cuiwei Road, Haidian District, Beijing.
No.74, South Fourth Ring Road, Fengtai District, China 8824637 1
68886208, No.2A Gucheng North Road, Shijingshan, Beijing, China
No. Tibei Road 18, Mentougou District, Beijing Public Security Fire Brigade, 69842697
Liangxiang town Zhengzhen Road Tong 8 13895 16, Fangshan District, Beijing, China.
Room 69704800, Sanxia Village, Fire Audit Division, Public Security Fire Brigade, Changping District, Beijing
No.24 Yuhua Road, Zone B, Airport Industrial Development Zone, Shunyi District, Beijing, 69962952
6964 1 122, No.5 Yingbin Middle Road, Huairou District, Beijing.
Room 89098802, Shuangjing Village West, Shilipu, Miyun County, Beijing, China.
Yanqing County Public Security Fire Brigade Fire Audit Acceptance Room/No.8 Hunan West Road 18 8 1 198 125.
No.3 Yongchang Middle Road, Economic Development Zone +0 16 1.
No.693420 1 9, Xinghua East Road, Yanshan District, Fire Audit Office, Yanshan Fire Supervision Office, Beijing Public Security Bureau
No.37 Xiangmin, Dongjiao District, Dongcheng District, Beijing Public Security Bureau, 85223695
Fire Audit Office of Beijing West Railway Station Fire Supervision Office of Beijing Public Security Bureau10 63976839, Lianhuachi East Road, Haidian District
Beijing Public Security Bureau Fire Department Qinghe Fire Supervision Department Fire Audit Department Qinghe Farm Section 5 8522504-5075
Processing time: Monday to Friday from 9: 00 am to 1 1: 30 pm 13: 30 pm to 17: 30 pm.
Time limit for processing: the general project will be completed within 8 working days; /kloc-Complete national and provincial key construction projects and construction projects with automatic fire fighting facilities within 0/6 working days; /kloc-8 working days for decoration projects below 0/000 square meters, and 16 working days for decoration projects above 0/000 square meters; Projects that need to be demonstrated by fire protection design experts shall be completed within 30 working days.
Handler:
I. Application
1. When applying for fire prevention audit of architectural design, the applicant shall submit the following materials:
(1) Construction project planning opinions or construction project land use permits approved by the Planning Bureau;
(2) Application Form for Fire Prevention Audit of Building Fire Protection Design filled out by the construction unit (in duplicate);
(3) A full set of official drawings shall be bound into volumes and put into the standard drawing frame of urban and rural construction archives. The formal blueprint submitted for review shall have the special seal for the drawings submitted for review by the design unit this year;
(4) Special articles on fire protection design (expressed in words).
2. When applying for fire control audit of building interior decoration, the applicant shall submit the following materials:
(1) Application Form for Fire Prevention Audit of Building Interior Decoration Design in duplicate, with official seal as required;
(2) Reconstruction plan (the main contents should include the general situation of the project and the materials used in the construction, etc. ) original plan of decoration level (marked with decoration parts); Changes or new fire protection design schemes and drawings (drawings belonging to foreign countries or entrusted with foreign design should have corresponding Chinese descriptions), and the submitted drawings must be designed by units with design qualifications and stamped with the special seal for this year's submission;
(three) the fire safety agreement signed by the construction unit, the property right unit or the property management unit and the decoration construction unit, the construction organization design plan of the construction unit, the fire safety measures and the system of using fire and electricity.
Two. accept
1. standard: the application materials submitted by the applicant are complete, standardized and effective.
2. Person in charge of this position: accepting personnel.
3. Job responsibilities and authority: review the application materials according to the acceptance criteria.
If the application materials meet the standards, they must be accepted in time, issue an acceptance receipt to the applicant, and forward the application materials to the reviewer;
If the application materials do not meet the standards, they will not be accepted, but the applicant must be informed of all the contents, requirements, related rights and complaint channels that need to be corrected in time.
Third, auditing.
(1) Preliminary examination
1. standard:
(1) The application materials are complete, standardized and effective;
(2) The application materials and drawings and the actual situation on site must conform to the requirements of relevant laws, regulations, rules and technical specifications.
2. Person in charge of this position: the first-instance personnel.
3. Job responsibilities and authority: audit according to audit standards.
In line with the standards, to put forward the examination and approval opinions, fill in the examination and approval form, and transfer the application materials and audit opinions to the reviewers;
To basically meet the standards, to put forward the basic consent of the audit opinion, fill in the examination and approval form, and transfer the application materials and audit opinions to the auditors;
For those who do not meet the standards, the examination and approval shall be terminated, and the opinions and reasons for not approving this application shall be signed on the examination and approval form, and then forwarded to the examiner.
(2) Review
1. standard: the application materials and drawings must meet the requirements of relevant laws, regulations, rules and technical specifications.
2. Person in charge of this post: the director of the competent business department, the leader of the fire department, or the deputy director (deputy section chief) and deputy team leader of the district and county fire department (branch) brigade.
3. Job responsibilities and authority: review the audit opinions according to the audit standards.
Agree with the auditor's opinion, fill in the audit opinion on the approval form and transfer it to the auditor;
If you disagree with the auditor's opinions, you should communicate with the auditor, exchange opinions, put forward audit opinions and reasons, and submit them to the auditor together with the auditor's opinions, and fill in the approval form.
(3) Examination and approval
1. standard: same as the evaluation standard.
2. Person-in-charge of this post: the director or director (section chief) of the brigade of district and county fire stations (sub-bureaus).
3. Job responsibilities and authority: review the review opinions according to the review standards.
Agree to the examination opinions, fill in the examination opinions on the examination and approval form, and return the acceptance personnel according to the original channels;
Do not agree with the review opinions, should communicate with the reviewers, exchange opinions, put forward the review opinions and reasons, fill in the approval form, and return the acceptance personnel according to the original channels.
(4) inform
1. Person in charge of this position: accepting personnel.
2. Work standard: timely and accurately inform the applicant of the results;
3. Job responsibilities and authority: Inform according to work standards and submit them to the business department for filing.
If it is approved, notify the applicant to collect it.
For the returned deferred parts, the applicant must be informed of all the contents, requirements, relevant rights and complaint channels that need to be corrected in the form of "Opinions on Temporary Return of Submitted Items", and the application materials shall be returned to the applicant;
If it is not approved, it must inform the applicant in writing of the reasons and inform the applicant that he has the right to apply for administrative reconsideration or bring an administrative lawsuit according to law.
Charge standard and basis: no charge.
- Related articles
- How many years is the property right of Xi An Sunshine World's shops?
- What is the floor area ratio of Deyang Tongsen Jin Yue 1 Phase II?
- What is the telephone number of the marketing center of Xuzhou Jiamu Guanyin Square?
- What is the address of Fuzhou Fengying Yunqi Metropolitan Center?
- When will Haikou Greenland New Coast be delivered?
- What about Xi Anji Li Real Estate Development Co., Ltd.?
- What if the elevator lights hit their heads?
- Is Linfen Star River Bay complete with five certificates?
- What is the telephone number of Xiangyang Shimao Guofeng Dajing Sales Department?