Job Recruitment Website - Property management company - Instructions for use of Toyota Sequoia four-wheel drive

Instructions for use of Toyota Sequoia four-wheel drive

Sequoia instruction manual

Instructions for use of Toyota Sequoia lte emergency command vehicle

I. Overview of the Application of lte Emergency Command Vehicle

Toyota Sequoia on-site emergency command communication vehicle, which completes the on-site 4g wireless network coverage, can conduct audio and video command and dispatch for on-site personnel and vehicles, and at the same time, it can conduct audio and video command and dispatch connection with the local command and dispatch center through ultrashort wave radio (or through 3g, satellite, optical cable and other communication means).

In order to meet the needs of users, improve the use efficiency of command and dispatch vehicles, and realize that special command and dispatch vehicles can be used when performing tasks and work at ordinary times, a detachable communication vehicle set is specially designed to realize:

1. As a command and dispatch vehicle, it can realize ultrashort wave, command and dispatch, and individual image acquisition.

And an image return function;

2. After use, all communication equipment can be removed, and the equipment can be installed in a rain-proof and shockproof chassis and laid flat.

Often put in the warehouse;

3. It can be used as an office car normally at work, and the modification of this car will not affect the vehicle.

Any performance of the vehicle;

4. In case of emergency, all the equipment can be installed in a short time.

Second, the vehicle can be used for office after all the equipment is removed.

1, the status of Toyota Sequoia in daily office.

In daily office, all command and dispatch equipment, including lte equipment, dispatch equipment, outdoor RF unit rru, ups, generators and other accessories, are boxed and placed in the warehouse, and antenna lifting poles and ground anchor brackets are also placed in the warehouse.

The appearance of the modified Toyota Sequoia car has hardly changed. A load-bearing frame is installed on the roof rack, a mounting beam is fixed under the rear of the car for installing the lifting rod under the world, and a permanently fixed inner panel is installed in the trunk of the car (the second row of rear seats of the car can not be installed after modification).

Page 1 *** 7

Photo of daily state (lifting rod and roof cpe and rru are not installed)

2. Some command and dispatch equipment and structures are also fixed on the Sequoia car. In the daily office work of vehicles,

Can't take it off, including three display screens (a 15-inch folding screen and two 7-inch headrest screens), an audio-visual interface panel fixed at the back of the car, and a cable threading hole under the car. Photos and descriptions of the screen

Interface panel photos and descriptions

Cable hole photo

3. Storage of 3.lte and other devices

Page 2 * * * Page 7

1)lte equipment box

Photos and descriptions

2) Dispatching equipment box

Photos and descriptions

3) Photos and descriptions of on-board uninterruptible power supply

4) Gasoline generator

Photos and descriptions

5)lte antenna box

Photos and descriptions

6) Cable and accessory box

Photos and descriptions

7) Mobile phone box

Three, after the emergency, the bus equipment, transportation status.

1. Climb up the equipment box and fix it.

Take the lte equipment box and dispatching equipment box to the car and fix them with straps; The vehicle-mounted ups gets on the bus and is fixed with a strap; Vehicle-mounted power generation

The machine (including the power cord roller) gets on the bus and is fixed with a belt; Lte cylindrical antenna shall be fixed with straps, and cables and accessory boxes shall be tied with straps.

Belt fixing; Put on the mobile phone box.

Take more photos according to the installation steps, and then fill in the instructions.

2. Installation of antenna lifting rod

Stick photos (photos) according to the installation steps and make up the instructions.

3. Install rru and cpe or shortwave antenna on the roof.

Photos and descriptions

4. Vehicle transportation status (problems that should be paid attention to)

Page 3 * * * Page 7

1) Photo of transportation status

2) Matters needing attention during transportation

Four, the vehicle arrived at the scene, the establishment of communication system.

1. Move the antenna lifting rod to the rear of the motor vehicle, open the back door, and take out the lte antenna box and feeder.

And accessory boxes, generators, etc.

draw

2. Connect the cable between the lte equipment box and the dispatching equipment box.

Photos and wiring diagrams

3. The equipment box is connected with the cable of the fixed signal panel on the vehicle, and the equipment box is connected with the cable of ups.

receive

Photos and wiring diagrams

Page 4 * * * Page 7

4. Connect the generator by passing the cable through the cable hole under the vehicle.

draw

5. Pass the cable through the cable hole under the car and connect the rru on the roof with the short-wave antenna.

draw

6. Install the lte cylindrical antenna on the lifting rod and tighten the six feeders.

Photos and wiring diagrams

7. Close the back door, straighten the antenna mast, erect the anchor bracket under the car, and start lifting the antenna.

To the highest point. Pull up the cable and fix it.

draw

8. Connect the six feeders of the antenna to the rru on the roof.

Photos and wiring diagrams

9. Vertical short-wave antenna (Yagi antenna or whip antenna)

draw

10, the devices are powered on one by one, and the lte command and dispatch system starts to work normally.

Page 5 * * * Page 7 Part 2: Description of redwood video conference

Instructions for using redwood conference software

I. Participation in meetings

① Open the browser.

② Enter the ip address of the server in the browser address bar (ip address is192.168.0.198).

④ Find the corresponding meeting in the meeting list.

⑤ Click the corresponding Join button in the action bar.

⑥ Confirm the meeting in a new page, enter the name and meeting password, and then click OK to join the meeting.

⑦ Confirm to download the file, and click Run after downloading.

⑧ Meeting interface.

Second, the meeting ① The main interface of the meeting

② Functional application

2. 1 File Open * * *

Click the Open Document button.

In the open window, choose to open file 3: House Decoration Management Manual (Sequoia) 13040 1 directory.

I. Preface-1

Two. Guide to house decoration management-II.

Three. Provisions on the Administration of House Decoration -4

Four. Regulations on Decoration Safety Management-13

Verb (abbreviation of verb) Measures for the Administration of Residential Interior Decoration (Abstract)-14

Six, several provisions on strengthening the management of new commercial residential family room decoration (Trial)

- 17

Seven, on strengthening the supervision and law enforcement of unauthorized changes to the main building and load-bearing structure in residential decoration activities.

Yes-18.

Eight. Provisions on the Management of Decoration Garbage Removal -22

order

Dear master:

Hello!

In order to safeguard the interests of you and neighboring owners and reduce unnecessary losses or disputes after house decoration, please decorate the house.

Please read the Residential Quality Guarantee, Residential Instruction Manual and Temporary Owner Management of Sequoia Valley carefully before renovation.

Statute, preliminary property service contract, house decoration management regulations and other relevant management regulations to facilitate your decoration.

House decoration, property management company has compiled this manual, please follow this guide for decoration.

Beijing Zhong Jian Property Management Co., Ltd.

Hongshan Xi gu property service center

Redwood Valley House Decoration Management Guide

I. Flowchart of House Decoration

Qualified hydropower and waterproof

Second, the decoration process description

(1) The owner determines the decoration scheme and selects the decoration construction unit.

(two) the owner or his client to the property service center to receive the "decoration application form", to decorate.

The Owner shall sign the Self-renovation Commitment Letter.

(three) the owners and construction units to provide the following materials to the property service center for declaration, audit, construction procedures.

1. Show the expense receipt after check-in;

2. Decoration application form;

3. Decoration scheme;

4. Copy of the relevant qualification certificate of the business license of the decoration enterprise (with official seal);

5. Where the original planning and design, special pipelines and facilities are changed, the written confirmation information of the original planning and design unit shall be submitted and sealed.

Seal (according to the order of the Ministry of Construction110);

6. Non-property owners need to submit the written certificate and identity certificate of the property owner's consent to the scheme for decoration and decoration;

7. Self-decoration must sign a self-decoration commitment letter;

8. Architectural decoration construction scheme (including construction scheme and water and electricity lines construction scheme) and related.

Decoration drawings;

9. Copy of the ID card of the owner and the person in charge of decoration;

10. Copy of ID card of decoration personnel, and 3 photos of 1 inch.

(four) the property service center shall review the scheme within three working days after the decoration application materials are complete.

(5) After the decoration scheme is examined and approved, the owner and the decoration unit shall sign a house decoration management agreement.

(six) pay the decoration management service fee to the financial office of the property service center with the Notice of Payment for House Decoration.

Service charge and decoration mortgage.

(seven) the owner and the decorator hold the receipt of the "Notice of Payment for House Decoration" and

Financial receipt to the property service center for the "Decoration Personnel Pass".

(eight) after the decoration application procedures are complete, the owner, the decoration unit and the property service center will carry out the acceptance.

Carry out closed water test and relevant acceptance before decoration, and sign the acceptance confirmation form before house decoration, and then issue the installation.

Decoration construction permit ",inform the neighborhood committee, can enter the construction.

(nine) after the completion of the renovation, the owner or his authorized client shall notify the property service center to arrange the tripartite acceptance.

After completion, the owner and the person in charge of the decoration construction unit confirm the acceptance results.

(ten) within 30 days after the acceptance, the owner or the person in charge of the decoration shall return the deposit receipt to the property company.

Refund the deposit Chapter 4: The format of expected business plan of Sequoia Capital (official readme).

Requirements of Sequoia Capital for Entrepreneurial Projects

Entrepreneurs have these characteristics, which means that they can achieve commercial success and build an immortal career. We hope and embrace.

Partner with these companies:

1. The purpose is clear: the back of the business card can describe the company's business.

2. Broad market: Focus on the existing fast-growing and changing market. A market with a potential capacity of 654.38+0 billion.

allow

Entrepreneurs are encouraged to keep trying until they make real profits.

3.4. Focus: Users are only willing to pay for a single simple value proposition.

5.6.

7. Team dna: A team's dna is top in the top 90. The best founders attract the best people.

Team.

8.

9. Thrift: Strictly control costs and spend money on the cutting edge.

10. Be careful: start a business with little money and develop products with little cost.

The expected business plan format of Sequoia Capital

We need a slide of 15 to 20 pages with the following information:

1.

2. Summarize how customers deal with this problem at present.

Yes

3.4.

5.tam, sam and som (note 1)

6.

7.; Research and development route

8. Business model: profit model; Pricing; Average income and total value; Distribution channels; target customer

9. Team: founder and management team; Consultant team

10. Finance: income statement; Balance sheet; Cash flow statement; Other financial forms; Orders currently owned

Note 1:

Tam: total available market total market capacity

Sam: available market target market capacity of the service

Som: market share

115: Sequoia Intelligent English "Run, boy!" . docx

Hongshanshu intelligent English

"Run, boy!"

plan

row

book

Organizer: xinzheng city Sequoia Intelligent English Training Base.

Activity time: July 20 15 17.

1

catalogue

I. Background of activities (3)

Two. The significance of the purpose of the activity (3)

Three. Activity theme (3)

Four. The purpose of the activity (3)

Verb (abbreviation of verb) Organizational structure ......................................... 3~4 6. The object, time and place of the activity ... (4)

Seven. Activity Form (4)

Eight. Activity flow (4)

Nine. Specific arrangement of the person in charge of the activity .................................. 4 ~ 5 X. Specific arrangement and rules of the activity ................................ 4~8 Project 1: Trust depends on ................................... 5~6 Project 2: We are the best. Group ........................... 7 Item 3: Tear the famous brand ................................. 7 ~ 8. Activity list. (9)

2

I. Background of the event

Running Man is a big family introduced by Zhejiang Satellite TV to South Korea's sbs TV variety show "Running Man".

Foreign sports reality shows have attracted the attention of the whole world because of their strong entertainment and competitiveness, which can be said to be popular.

The whole world, however, sitting in front of the computer, we can't be there, we can only enjoy the visual effect, and we are lost. However, today

Today, redwood Smart English will provide you with the opportunity to express yourself freely. "run! Teenager! " -Red exclusive

The youth version of Cunninghamia lanceolata Smart English "Running Man" hit hard! There are no dazzling stars here, but there is an ocean of youth.

Overflow us; There are no gorgeous scenes here, but there are healthy trails in the green; There are no professional directors here,

But there are teachers who serve seriously. A series of wonderful performances will be presented by you, which will be your exclusive performance time!

Second, the purpose and significance of the activity

This time, "Run! Teenager! " It is to let children grow up in self-confidence, responsibility, adaptation, innovation and teamwork.

At work, the spirit of mutual assistance has been enhanced. Improve children's "combat effectiveness" and cohesion, and cultivate outstanding students.

children