Job Recruitment Website - Property management company - Where to pick up the water and electricity after the new house is sealed?
Where to pick up the water and electricity after the new house is sealed?
1, water: bring the identity information of the account holder, contact list and other materials to the water unit to open an account; Finally, wait for the call within 7 days.
2. Electricity: bring the purchase invoice and appraisal materials to the power supply bureau for opening; Finally, wait for the SMS notification within 3 days.
How to check and accept the water and electricity of the new house
1, water acceptance process
(1) pressure test
1) Open the water inlet valve and slowly inject water from the lowest outlet of the pipeline. After all the gas in the pipeline is discharged, tighten the switch of the pressure test pump.
2) Close the main water inlet valve, slowly boost the pipeline to the specified test pressure, and then observe whether the joint and plug are leaking.
3) Welded pipes such as ppr, aluminum-plastic PPR and steel-plastic PPR shall be kept for more than 30 minutes, and non-welded pipes such as aluminum-plastic pipes and galvanized pipes shall be kept for 4 hours. At the end of the test time, the pressure drop is less than 0.05mpa.
(2) Water pressure release
After confirming that the pressure test is qualified, connect the pipe end to the water distribution parts, supply water at working pressure, open the water distribution parts in batches, and check whether the water outlet is unblocked.
2, electrical acceptance process
(1) check
Check whether the intercom and emergency call buttons of the house are normal, whether the doorbell is normal, the safety of safety sockets, and the number and safety of TV broadband sockets, including bathroom, kitchen, living room and bedroom.
(2) Safety inspection of electrical circuit switch box
Electrical wiring is safe and convenient. According to the regulations, the cycle times of each house should not be less than 5 times. The switch in the switch box is firmly installed, so it can be replaced and checked for looseness. Each branch switch in the switch box shall be clearly marked. If there is no or unclear, correct it immediately when decorating.
(3) The electric pen tests the socket panel
Use an electric pen to test whether there is any problem with the socket panel, all switches, sockets and main electric valves in the house. Pull down the socket switch in the main switch box and the indicator light will go out. Always test the switch several times, the wiring is good and the socket is safe.
(4) Power-off test of valve pulling.
When switches and meters are outdoors, check whether they can control indoor lamps and sockets. The method is whether the indoor power supply is completely cut off after the switch is turned on; If there are switches in the room, you should also check whether each switch completely controls each branch line.
(5) See if the electricity meter is electrified.
At present, most electric meters are installed with 10(40)a single-phase electric meters. Are they operating normally? Either it's fast or it's slow. The number of meters used for copying, because during the construction process, workers may use your energy, and the money should not be paid by the owner.
- Related articles
- How much does it cost to register a property company?
- Where is Hefei Wei Xing Vanke Star Club Light Year?
- What is the sales service hotline of Huangdao Jindi Lvmei?
- How about the decoration of Tangshan Fortune Exchange?
- Is the northern property a state-owned enterprise?
- Where is Laiwu Longzeyuan?
- Poverty and wealth can be inherited.
- How to write the poster for paying property fees and giving gifts?
- Full text of detailed rules for the implementation of Tianjin property management regulations
- How much is the price of Sunshine Coast in Boao, Hainan?