Job Recruitment Website - Recruitment portal - The following bridge erecting machine construction risk control measures are wrong ().
The following bridge erecting machine construction risk control measures are wrong ().
202 1 new textbook P257
1. When using bridge erecting machine to erect beams, a reasonable erection scheme and corresponding safety technical measures shall be formulated. Make safety technical disclosure to all operators (including mechanical operators). 4. When erecting a beam, its power supply must be controlled by designated personnel, and a qualified full-time electrician should be set up; The mechanic should follow the shift to prevent all kinds of accidents caused by sudden power interruption or electrical and mechanical failure of the bridge erecting machine. 7. All preparations should be made for the longitudinal movement of the bridge erecting machine, and it is required to be in place twice, and it is not allowed to stop halfway. 9. When the installed bridge has a vertical slope, the longitudinal displacement and sliding of the bridge erecting machine should be prevented. 15. The bridge erecting machine shall be equipped with lightning protection devices.
- Related articles
- Where can I repair Harman Kardon stereo in Shenzhen?
- Is Changchun Ji Cheng Ming Tai legal?
- Where is the school district of Guo Qian No.1 Middle School?
- Is there a reputable overseas labor service company in Zhangdian, Zibo?
- What is the telephone number of the human resources department of the Great Wall Development of Digital Park?
- Is CreditEase a regular loan company?
- Is it difficult to interview Shanghai Chengtou Water Affairs?
- How to register for online recruitment of talents in Hebei?
- Which book does The Adventures of Tintin come from?
- What about Yantai Gujintang Massage Co., Ltd.?