Job Recruitment Website - Recruitment portal - Yanggong Bridge in Tianjin Tianjie subway station has been repaired for a long time.
Yanggong Bridge in Tianjin Tianjie subway station has been repaired for a long time.
Yanggongqiao Line of Jinnan Tianjie Subway Station: Phase II of Metro 17, with the commencement date of 20 19, which is expected to open in 2024. In June 2022, the main structure of Yanggongqiao Station of Chengdu Metro 17 Line Phase II was successfully capped, becoming the first semi-covered and capped station in the whole line.
Yang Gong Bridge is located at the intersection of Jinyang Road and Jinji North Road. The station is laid along Jinyang Road in the east-west direction, with island platform and three floors underground, 14m. The total length of the station is 228m, the standard section width is 23.3m, and the effective platform length is 186m. Jinyang Road is connected to the Caojin Interchange of the Third Ring Road in the west and to the viaduct of Zhonghuan Road in the east, which is one of the main roads in and out of the city. The traffic is busy, and the station is constructed by semi-covered excavation method.
- Previous article:Where do I get off the bus from Chifeng 66 to 99?
- Next article:Which area does Fangqiao Industrial Zone belong to?
- Related articles
- How much is the salary of chemical plant in Changshu Binjiang Development Zone?
- What law-related jobs can law students do if they fail the judicial examination?
- What about Nanyang Hailin Optical Instrument Processing Co., Ltd.?
- Wanda Plaza brand (creating a new international commercial landmark)
- How about Chongqing New Vision Express Printing Co., Ltd.?
- What are the employment prospects for film and television animation majors?
- What about Shandong Jining Xinya Property Management Co., Ltd.?
- How about Hangzhou Fuyang Yiming Fabric Soft Decoration Design Co., Ltd.?
- How about Jinlong Radio and Television Redwood Furniture City?
- Who is Feng Jingsan?