Job Recruitment Website - Recruitment portal - Member enterprises of China Hydropower Construction Group Gansu Energy Investment Co., Ltd.

Member enterprises of China Hydropower Construction Group Gansu Energy Investment Co., Ltd.

Huating Company was established in September 2003 with a registered capital of 300 million yuan, which was jointly invested by China Hydropower Group, Gansu Huating Coal and Electricity Co., Ltd., Gansu Thermal Power Engineering Company and Gansu Electric Power Pearl Group Company. The planned installed capacity of Huating Power Plant built by the company is 2× 145MW+2×660MW, which is located in Huating County, Pingliang City, Gansu Province. The total investment of 2× 145MW circulating fluidized bed units in the first phase of Huating Power Plant is 65438+380 million yuan. # 1 unit generated electricity in February 2006, and #2 unit generated electricity in May 2007. Huating Power Plant is the first generator set in Gansu Province that adopts air cooling technology and circulating fluidized bed boiler, which has obvious energy saving and environmental protection effects. In 20 10, it was awarded the energy saving and emission reduction incentive fund of the Ministry of Finance 100000 yuan.

Huating Company owns and operates Huating Huadian Water Supply Co., Ltd. and Huating Huadian Maintenance and Operation Co., Ltd. The 2×660MW project of Huating Power Plant Phase II, as a key development project in the Twelfth Five-Year Plan of Gansu Province, was signed by China Hydropower Group and Gansu Provincial Government on March 20 1 1. Chongxin Company was established in June 2006 with a registered capital of 800 million yuan, which was jointly invested by China Hydropower Group and Huating Coal Industry Group. Chongxin Power Plant built by the company is the first batch of 600MW units in Gansu Province and the largest pithead power plant in Gansu Province.

Chongxin Power Plant is located in Chongxin County, Pingliang City, Gansu Province, with a planned installed capacity of 2×660MW+4× 1000MW. The total investment of the 2×660MW supercritical air cooling unit in the first phase of the project is about 4.65 billion yuan. The # 1 unit was connected to the grid in June 20 10, and the #2 unit was connected to the grid in February 20 10. Chongxin Power Plant is an important power support for the 750 kV transmission line from Gansu to Shaanxi, which is convenient to send out and close to the 750 kV transmission channel built by the State Grid.

Chongxin Company invested in Chongxin Chongdian Water Supply Co., Ltd. and Pingliang Huadian Real Estate Development Co., Ltd., and the 2× 1000MW project of the second phase expansion of Chongxin Power Plant passed the preliminary feasibility study review on July 20 10, and was signed at the 16th Lanzhou Fair. As a key development project in the 12th Five-Year Plan of Gansu Province, it was signed by China Hydropower Group and Gansu Provincial Government on March 20 1 1. 20 10 In April, in order to further support the development of China Hydropower Group in Gansu, Gansu Province allocated the coal resources of Lingtainan Coalfield with a reserve of12.98 million tons to China Hydropower Group. In order to speed up the development of coal resources in Lingtainan, China Hydropower Co., Ltd. established the leading group for the early development of Lingtainan coalfield in Gansu Province and the leading group for the early development of Lingtainan coalfield in Gansu Province on July 20 10.

Lingtainan coalfield is one of the six major mining areas in the overall planning of energy development and utilization in Ordos Basin, Gansu Province. Located in Lingtai County, Pingliang City, Gansu Province, the administrative division is under the jurisdiction of Lingtai County, Pingliang City, Gansu Province. Lingtainan Coalfield plans to build two pairs of mines, Tangjiahe Coal Mine and Nanchuanhe Coal Mine, with a short-term planned production capacity of 7 million tons and a long-term planned production capacity of 6.5438+million tons. Two pairs of mines are planned to start construction at the end of 20 1 1, and the mines will be completed and put into operation at the end of the 12th Five-Year Plan, and the production capacity will reach100000 tons in 2020. As the main body of Lingtainan coalfield development, Gansu Energy Investment Company has signed the Agreement on Assignment and Payment of Mining Rights with Gansu Provincial Department of Land and Resources. The overall planning of Lingtainan coalfield mining area was reported to the National Energy Administration in May, 20 1 1. At present, the exploration (fine investigation) of coal resources in Tangjiahe and Nanchuanhe minefields in Lingtainan coalfield has been fully carried out.