Job Recruitment Website - Recruitment portal - Shandong Gong Lin loader 953n was sold several years ago.

Shandong Gong Lin loader 953n was sold several years ago.

20 12 betrayal.

Gong Lin 953N was put into production in 20 12 and stopped production in 15.

For Komatsu, "PC" stands for excavator, "WA" stands for loader and "D" stands for bulldozer. Similarly, ZX of Hitachi, DH of Doosan and SK of Kobelco are all excavator codes.

Extended data:

Operating procedures and precautions of loaders

1. Before driving, check the amount of oil and diesel, put the vehicle in a safe and stable position, check and understand the surrounding working environment, and then start work; Braking, horn and steering gear should be complete and sensitive, and strictly abide by traffic rules. During the operation.

2. When the loader and forklift work together, the loading and unloading vehicle shall not pass under the bucket when loading.

3. When the loader moves with a full bucket, the bucket should not rise, and it is generally advisable to leave the ground 0.5 meters.

4. When the loader is driving, high speed and sharp turn are not allowed.

5. When the load opportunity gradually increases to the resistance, the tire (or crawler) slips and the engine speed gradually decreases by one level. The forklift should stop immediately, and remember that there is no need to force the operation.