The second phase of Longtan Temple Metro Line 8 has been built for a long time.

By the end of 2024.

According to official website and Chengdu Know Encyclopedia, the second phase of Chengdu Longtan Temple Metro Line 8 was completed and opened to traffic at the end of 2024. The second phase of Chengdu Metro Line 8 started on May 18, 2020. As an extension of the first stage, the second stage is divided into two parts. The total length is 8 1 km, with 7 stations and 3 transfer stations.