Job Recruitment Website - Recruitment portal - Operator's personal work summary

Operator's personal work summary

The efforts of operators day after day have made China a manufacturing kingdom. They have contributed their sweat and youth to the economic development of our country and the world. The following is a summary of the personal work of the operators that I have compiled for you. If you like, you can share it with your friends around you!

Operator's personal work summary 1

In the busy work, unconsciously ushered in a new year. Looking back on this year's work process, as an operator of Shanghai Hongte Electromechanical Technology Co., Ltd. Hebei Branch, I have also made a little contribution to our company's goal of "being the world's number one in the field of deep-hole drilling". However, as I have just arrived in the company for less than one year, I still have some shortcomings, even some problems. In order to better do the work of grass-roots operators; For the rapid development of Beijing factory; In order to achieve our common goal of "becoming the first in the world in the field of deep hole drilling", this paper summarizes the phased work of operators.

When I first arrived in Shanghai Hongte Hebei Branch, I knew nothing about deep-hole drilling and was not familiar with the new environment. New things; I am not familiar with the new cutting field at all. Fortunately, the company's team spirit of mutual assistance and cooperation is still good. With the help of my colleagues, I gradually became familiar with these new things. I want to thank all the leaders and employees of the Beijing factory. As an operator, my job is to ensure safety and quality, complete all the work arranged by the leader, and improve my skills in my work. As the most basic operator of the company, all the external processed workpieces come from our hands, so safety and quality are the most important. On the basis of improving your skills, keep in mind: do not accept defective products; Do not manufacture defective products; The "three noes" principle of non-outflow of defective products. Strive to become a qualified employee of the company.

Make a year-end summary of the following four aspects:

First, the quality problems in my work throughout the year:

I joined Shanghai Hongte Hebei Branch on April 9, 2000. There were four quality accidents in the whole year, which were Yaneng's nonmagnetic stainless steel workpieces; Aluminum plate in Li Jingwei; Chi Yuan hydraulic shaft; Accurate mold.

Let's talk about the causes of these quality accidents:

1, the shaft of Chi Yuan Hydraulic. During batch processing, the inlet direction deviated from 1 due to the deviation of the fourth workpiece. 5 mm caused the scrap of the workpiece, which was caused by carelessness. If you are more careful, you will be fine.

2. Aluminum plates in Li Jingwei. There are many holes in the aluminum plate, because the y term of a hole has been entered as 0. 2mm leads to scrapping. An aluminum plate is worth more than my monthly salary. I was also afraid that something would go wrong, so I asked two people to check each other, but I still didn't find it. Self-inspection is not in place, resulting from carelessness.

3, the mold is accurate. When machining, an extra 6 mm was set, which caused problems in the workpiece and was later supplemented. The main reason, carelessness, is that night criminals are sleepy.

4. Yaneng nonmagnetic stainless steel workpiece. Because the hole radius is wrong, it is scrapped due to direct processing. To tell the truth, I did it according to the process, and I didn't find any problems in the process. For this quality accident, it was the third person who found the problem and corrected the process. If I had found that there was something wrong with the process at the beginning, the workpiece would not have been scrapped. Still not careful enough. So I wrote a scrap list and deducted my salary, from the initial anger to understanding.

Most of these quality accidents are caused by carelessness. We should be serious and practical in our future work. My leaders often say that I am not careful enough, and Mao Mao is impetuous. He's right. I am also silently correcting it. Try not to scrap in the next year's work, and process the workpiece with guaranteed quality. Do not seek innovation, only quality.

Second, the feeling of broken knife:

Speaking of broken knives, I just want to say that they are all caused by human factors. I broke three knives for faster processing, and the others were caused by mistakes in operating the machine tool. If you can press the correct cutting data, the correct operation will not be a problem. Next year, we will strive to keep cutting all year round. Now that the problem has been found, there is a direction for correction.

Three. Comments and suggestions on your bank:

What our company is doing now is still very good, but I find that the company's corporate civilization lacks publicity columns. Nothing else. Generally speaking, it's not bad.

Fourth, personal growth:

Speaking of growing up, I have learned a lot that I didn't know before, and a person who rents a house outside will understand a lot of truth. Of course, for rural people who go out to work, we only come out for one purpose, and that is to make more money. A little salary increase is still appropriate. Renting a house now, water, electricity and heating all cost a lot of money. Although the salary is high, after paying these expenses, there is not much left. I plan to save 40 thousand yuan for next year. I think it should be possible to work hard for a year.

The above is a simple and rough summary of this year. I hope the leader will point out what I did badly, and I will try my best to correct it. I made many mistakes in the past year. I want to thank our manager Zhou and Zhuge for their tolerance. Finally, I wish you a happy New Year's Day in 20-2008.

Operator's Personal Work Summary II

I. Equipment management:

Summarize the equipment account at 7: 30 and the production meeting at 9: 00 every day, timely and comprehensively grasp the equipment operation status from the production coordination meeting and account, and formulate or arrange corresponding technical transformation, maintenance and maintenance plans;

From 20 to 2000, mechanical and electrical personnel were a relatively stable team in the workshop. As a middle-level leader, we should act impartially, be fair and upright, and not make things difficult for our subordinates. The assessment of employees should be realistic, fair, open and just, and communicate with subordinates more. Opinions or rationalization suggestions put forward by employees should be accepted and corrected with an open mind. For employees with good performance, we should encourage them to make progress and correctly guide and improve their enthusiasm.

Timely and correctly handle equipment emergencies (major equipment failures), coordinate departments, dispatch personnel, organize emergency repair, supervise the progress of emergency repair on site, and provide necessary logistics support services (required spare parts and tools, etc.). ); At the same time, it is necessary to analyze the reasons and sum up experience in order to improve their maintenance skills and quality.

According to the index issued by the company at the beginning of the year, organize the new and old employees of the whole factory to carry out training and study. At the same time, some employees (such as copper up-lead operators) have really achieved the operation of circulating water pump and emergency treatment of cooling water, so that every employee can operate and reduce the failure rate of equipment. Ensure that the copper sleeve on the copper sleeve is not burned out. We often organize mechanical and electrical staff training and learning, from theory to reason, from practice to experience, electrical principles and mechanical drawing, from easy to difficult, from point to surface, bit by bit analysis; At the same time, let the mechanical and electrical employees communicate with each other and improve each other.

Second, the equipment maintenance:

(1) can quickly respond to the equipment failure, carefully analyze the failure, and quickly eliminate the failure without maintenance delay; Negotiate with the workshop about hidden troubles of major equipment, and arrange spare time for production to organize maintenance; For example, in February, the cable car room 1250 cable machine stopped for a week for maintenance, and the twisted part was sent out for treatment; June 65438+10/October Crosslinking Workshop 1250 Cable Forming Machine was sent to the manufacturer for maintenance; In the old factory, the chemically crosslinked single screw was hung down, the foundation was dug, the horizontal position was calibrated, and the worn parts of the gearbox were replaced; Two analyzers are cross-linked, one of which is a X-ray scanning fault and the other is a high-voltage fault, which needs to be repaired by replacing accessories; In addition, 47 old and persistent problems put forward by the production department were rectified one by one to meet the requirements of process production and improve the efficiency of equipment use. Wait, I won't elaborate on my daily work here.

(2) For some parts without drawings that are urgently needed for maintenance equipment, measure drawings or samples, cooperate with metalworkers to finish them on time according to quality, and reserve some common spare parts warehouses;

(3) Put forward suggestions on equipment management, unite colleagues and work together with Qi Xin to * * * complete every task assigned by the leaders.

Third, maintenance

(1) On the premise of ensuring maintenance safety, improve maintenance quality, attitude and efficiency, and strive to make the work satisfy every customer. According to the maintenance plan made at the beginning of the year, the pipeline valves on the copper riser were comprehensively inspected and overhauled in March; June 1 1, DC motor maintenance in the whole plant, replacing non-woven fabrics, carbon brushes and carbon brush holders, and filling bearings with butter; On September 3 150, the oil cylinder of the winder lifting platform leaked, and the rotating traction airbag leaked, so it was overhauled. June 5438+10, the equipment protective cover of the whole plant was completely renovated and manufactured; 65438+ 10 month, 120 machine, 84/630 frame winder, high-speed copper-aluminum wire drawing machine, 3 150 disc winder, 150 electromechanical cabinet renovation and maintenance; In addition, the "running, running, dripping and leaking" and "binding, binding and binding" of the whole plant were rectified, maintained by districts and supervised by listing. The effect has been greatly improved.

(2) Do a good job in the relocation of 65 extruder equipment safely, with high quality and quickly, so as to ensure that the equipment can be moved to the rubber cable car room safely and without incident. Bare wire workshop: No.2 high-speed copper wire drawing, 12 high-speed tube stranding, two high-speed aluminum wire drawing, installation and debugging; Rubber cable car room: 90+65 machine installation and debugging;

(3) Abide by various rules and regulations, work hard, put the interests of the company first, study professional skills hard, do not seek personal gain, and earnestly perform post responsibilities. At work, this sometimes happens. When encountering a problem that is difficult to solve for a while, it is passive and perfunctory not to actively analyze the problem and not to study and study professional skills hard. In fact, such work attitude directly leads to the reduction of work efficiency. If a problem is not solved, it will be blocked forever, and there can be no progress. Moreover, the equipment has been running with illness, which brings hidden dangers to product quality; On the contrary, if you take the initiative and work together with Qi Xin, you will inevitably accumulate a lot of experience in your work, become more and more familiar with the working environment and objects, and improve your experience and skills accordingly, and everything is under control. I firmly believe that only the latter way of working will bring vitality and wealth to enterprises. "Honesty without interest, wealth without interest" is the core of Sheng 'an corporate culture. As employees of Sheng 'an, we should always remember our loyalty to the enterprise and share weal and woe! Only when the body and mind are fully integrated into the company, do their duty, abide by various rules and regulations, and work hard can we realize ourselves and love our cause.

Operator's personal work summary 3

The tense 20 years have passed, and the past year can be said to be an extraordinary year. As a technician in the workshop, with the care and support of workshop leaders and comrades, I have made due contributions to the enterprise through hard work. In the past year, I set high standards for myself in my work and life and did a lot of work. The work of the past year is summarized as follows:

First, strengthen the study of political theory and technical knowledge, and comprehensively improve their political and cultural quality and professional level.

In 20 years' work, I followed the pace of the times, strengthened the study of theoretical knowledge, strived to achieve new improvement in understanding and new gains in application, and achieved the purpose of guiding practice, promoting work, improving work level and service ability. I acted according to the requirements of eight honors and eight disgraces, wrote in my regular thoughts in time, and actively approached the party organization, striving to become a * * * party member at an early date. In the work, I constantly learn new technologies and processes, constantly enrich myself, and constantly improve my technical level to guide my work.

Second, carry forward the spirit of teamwork in the work and strive to complete the production tasks of the workshop.

1, in my usual work, I should first do my daily work well. I have both division of labor and cooperation with other technicians in the workshop, insist on regular work exchanges with other technicians, fully carry forward democracy, put an end to arbitrariness, unify my thoughts and steps, and successfully complete various production tasks in the workshop. In 2000, in cooperation with other technicians, minor repairs and mouth changing machines were reasonably arranged according to the spinnability of the workshop, and the spinning was changed to 465,438+03 sets with more than a dozen varieties.

2. According to the spirit of trade association, the company requested that the North Zone of No.5 filament workshop be shut down in July 2000. I cooperate with other technicians to deal with the process of alkali string during shutdown and peacetime, report the problems encountered in the work to the workshop leaders in time and arrange relevant personnel to solve them. Start the car in North District in September, make good preparations for start-up, do a good job in process treatment, and adjust all process parameters in place in advance to ensure the success of start-up and product quality.

3. Due to the long-term spinning of wood paddles, there are many waste wires in the godet wheel in the Wusi workshop, and the spinnability is poor. I often communicate with the technicians in the stock solution workshop to reflect the spinnability of the workshop and with the technicians in the functional office, hoping to improve the spinnability by changing the paddle ratio. This year, the company adopted a variety of paddle and paddle mixing methods, which greatly improved the spinnability. The full cylinder rate has increased from less than 80% to about 85% now.

4. Summarize the production situation of the workshop once a month and submit it to the technical department in time; Summarize the consumption of main materials in the workshop and submit them to the planning department in time. Do a good job in statistics and technical analysis, analyze the abnormal situation in workshop production, take corrective measures, and write a corrective action report.

The third is to complete the compilation and printing of the work instruction of the fifth silk workshop.

From 20 to 2000, according to the arrangement of the enterprise management office, all workshops were required to complete the revision of work instructions and write new work requirements according to the requirements of the three-in-one system. I have a clear division of labor with other technicians, so that the new work instruction contains the contents of environment and occupational health, which is more suitable for practical operation. In March, the work instructions were distributed to employees in time, and the work of changing the edition of the work instructions was successfully completed.

Fourth, carefully arrange employee training to improve the theoretical level and professional level of employees.

Doing a good job in employee training is the long-term unremitting work of our workshop. For this reason, our workshop has specially formulated a training system, requiring each team to organize employee training at least twice a month and carry out various forms of employee training. For new workers who change jobs, a master-apprentice contract is required, and they can work independently only after passing the examination of technicians. In May this year, employees were organized to make a knowledge answer sheet of the three-in-one system, which strengthened their understanding of the knowledge of the three-in-one system. We also use our spare time to organize employees to learn the knowledge of the three-in-one system, so that employees can better understand the company's policies and objectives and lay a good foundation for the company's internal and external audit. Cooperate with the teams in each section to do a good job in the technical competition of young workers and improve the practical operation skills of employees. Strengthen the study of new work instructions, and organize all employees in our workshop to have a theoretical knowledge test on June 5438+ 10 this year. Improve the theoretical knowledge of employees. Class four workers insist on the second morning shift, because class four spinners are the key positions to control product quality in the workshop. At ordinary times, we attach great importance to the study of spinning workers' technological knowledge, so that employees can understand the main processes that affect product quality and tell them repeatedly, especially the bobbin with brittle broken wires brought back by the general manager after visiting customers in June, so that employees can personally feel the losses caused by brittle broken wires to users, how to avoid brittle broken wires at work, and always sound an alarm to employees to enhance their sense of responsibility at work.

Operator's Personal Work Summary 4

In a blink of an eye, 200-2000 passed quickly. Over the past year, with the care of my leaders and the help of my colleagues, I have grown from a new employee to a skilled operator. Now let me sum up my work and study in the past year.

I entered the filling department of milk line on April 25th, 2004 and became the filling machine operator. After more than half a year's work, I have become more and more proficient in my work, although I have not made a blockbuster. But there are no mistakes. Do your job well with a high sense of responsibility. On the basis of doing my job well, I strictly demand myself to learn the operation technology of filling machine with high standards, improve my operation level and complete the production tasks assigned by the company's workshop with good quality and quantity.

During work and life. -A positive atmosphere inspires me to keep learning and making progress. -The warm family culture makes me feel warm. Now-it can provide you with an excellent starting point and platform for career development. Although I am just an ordinary front-line operator, I will still take my work seriously. -They are also very concerned about our employees' spare time life. Corporate culture is divided into letting me fully experience the warmth of home.

In a year's work, I have made

1, strictly abide by the company workshop management.

2. Operation and maintenance of equipment.

3. Quality control.

4. Control the scene.

5. Consumption control.

6. Obey the work arrangement of the directly affiliated section chief and workshop director, and live in harmony with colleagues.

In-,I will continue to study related business and become a skilled worker.

Operator's Personal Work Summary 5

The hectic 20 years are about to pass, and the hopeful 20 years have quietly arrived. In the past year, I still carried out all the work with an extremely serious and responsible attitude. I am serious and diligent, with gains and losses, achievements and shortcomings.

As a water system operator, in this year's daily work, I am loyal to my duties and earnestly complete the tasks assigned by my superiors; Seriously implement the six strict rules for operators, adhere to the six prohibitions for hot work, resolutely implement the eight requirements for entering containers, abide by the fourteen prohibitions for entering chemical plants, abide by the company's labor discipline and relevant laws and regulations, and abide by safety operation procedures; Patrol inspection on time, and take the initiative to put forward potential safety hazards in post production in time; Don't be late, don't be a miner, don't leave early; Seriously study the relevant documents issued by the company, consciously participate in the relevant training organized by the company, and actively participate in the company's safety knowledge competition, singing competition, and actively write articles for the company and other amateur activities.

Looking back on the work log for one year, it was found that the mechanical seal of No.2 water intake pump of riverside water intake system was burnt out. The reason is that the vacuum pump pipeline is blocked by hard objects, resulting in the cooling water can not be sent to the seal. After long-term operation, the seal temperature rises and is burnt out. Now it has been replaced by a mechanic, but the seal still leaks, and the pump has poor operation effect and low flow rate. 1# water intake pump runs relatively well. * * * encountered two vacuum tube jams during operation, and assisted the maintenance man to deal with them. Once this happens, the vacuum pump does not produce water or a small amount of water, the current is low when the pump is running, there is no pressure at the pump outlet, there is air idling in the pump, and there is no flow in the pipeline. Recently, the motor end of this pump has abnormal sound. I listened carefully at the scene and found that the lubricating oil in the motor bearing hardened after maintenance. 3# water intake pump is used as standby pump, which is not used for a long time, so the water intake head is easy to be blocked, the backwashing force is large, and the thread is stuck. While taking water, I also cleaned the ground sanitation along the river and checked the fire-fighting equipment to prevent problems before they happen.

During the operation of water purification station, pipeline booster pumps 1# and 2# are noisy. Upon inspection, it was found that the key of 1# coupling fell off and the water seal ring of 2# was worn. Complete regular blowdown of the water purifier, configure PAC, adjust dosing pump trip, switch lighting, switch production pumps, refuel each pump, assist in the maintenance and treatment of 2# and 3# production pumps, start and stop electric fire pumps, clean the ground of water purification station, 3# production pump and vegetable oil fire pump group, and conduct routine inspection; Some time ago, the main problem solved by the water purification station was that the electric fire pump started automatically for no reason. Later, after inspection, it was found that the following conditions would lead to the start-up: false alarm signal after recovery, a large number of water leaks from fire pipes and accessories, water consumption not reported from outside, PLC program failure, and abnormal closing after the one-way valve was pushed open.

In the daily work of desalting station, water preparation, desalting, mixed bed regeneration, pretreatment backwashing, system lighting switch, system water pump start, water pump refueling, sewage discharge to wastewater neutralization tank and acid-base discharge are completed. In the operation of the system, there have been cases of resin leakage from the mixed bed, resin leakage from the positive bed, loud noise from centrifugal coupling of the pump house, often insufficient waste water pump, false alarm of pneumatic valve and solenoid valve, etc., which led to system shutdown. In the operation of the system, the process requirements should be carefully controlled, especially in the regeneration process, each step should be supervised by a special person on site, and the backwashing flow and reclaimed water flow should not be too large or too small to prevent the resin from rushing out or causing the resin surface to be uneven; The concentration of regenerated liquid should meet the process index.

In the daily work of the circulating water station, it is necessary to clean the chlorination room, chlorinate the circulating water, configure corrosion and scale inhibitors, add corrosion and scale inhibitors to the circulating water, start and stop the system lighting, switch the fan, sign the inspection record, manually and forcibly backwash the gravity filter, switch the circulating water pump, refuel the circulating water pump, replenish water in the circulating water pool, and discharge pollutants. During the operation of circulating water, the pipe wall of Nanchi 1# circulating water pump cracked and leaked, which caused a serious accident of shutdown of the whole plant. The temperature of the bearing at the rear end of the 3# circulating water pump rises instantly, and the emergency switch is stopped; When cleaning the circulating water prefilming, accidents such as shutdown caused by leakage occurred. Seriously study new equipment. At present, frequency conversion devices are added to the system to convert the frequency of 3#, 4# and 5# circulating pumps, but now only the 4# pump is converted, and the frequency conversion operation steps are mastered skillfully. Daily patrol, check whether the inverter room is running normally, and do personal safety work seriously.

Based on the above daily work, I think I have learned a lot in this year. I always think that as the most basic operator, especially the daily work involves safety, inspection, process quality, civilized production, equipment management, cleaning and many other aspects. We must do everything by ourselves to understand the importance, and we still have a long way to go. With the development of things and the passage of time, many new problems and contradictions will be exposed in our daily operation, which requires us to keep pace with the times and keep exploring.

Related articles on personal work summary of operators:

★ Operator's personal work summary

★ Model essay on personal work summary of operator post

★ Summary report of personal work of workshop operators

★ Operator's Personal Work Summary Report (2)

★ Summary of personal work of the operator during probation period.

★ Summary of personal work of workshop workers

★ The latest model essay on work summary of workshop operators.

★ Model essay on personal work summary of operators during probation period

★ Personal summary model essay of probation operator

★ Model essay on personal work summary of workshop workers (2)