Job Recruitment Website - Recruitment portal - Nantong subway time

Nantong subway time

Nantong subway time is from 6: 00 to 22: 00.

On the opening day of the first phase project of Nantong Metro 1 Line, the operation time is 165438+ 10 at 8: 00 am. After the opening, the whole day operation time is 6: 00-22: 00 (the specific time is subject to the station information), and the whole day is divided into peak, flat peak and flat peak.

The peak train interval is 6 minutes and 50 seconds, the weekend peak train interval is 6 minutes and 30 seconds, the maximum interval of low peak at night is 14 minutes and 50 seconds, and the single stop time of the train is about 45 seconds.

Brief introduction of Nantong subway

Nantong subway generally refers to Nantong rail transit. Nantong Rail Transit (NTRT) is an urban rail transit system serving Nantong City, Jiangsu Province, China. Its first line was put into operation at the beginning of 1 10 in 2022, making it the sixth city in Jiangsu province to open a subway.

By June, 2022, there were 1 1 lines in Nantong rail transit, which was the first phase of Nantong rail transit 1 line, with a total length of 39. 1 8km. As of June 2022, 1 1, Nantong rail transit line under construction 1 is the first phase of Nantong rail transit line 2, with a mileage of 2 1.04 km under construction.

The prospective line network of Nantong rail transit is composed of four urban lines and four regional lines, with a total length of about 324 kilometers, of which the total length of urban lines is 170.8 kilometers and the total length of regional lines is 153.2 kilometers.