Job Recruitment Website - Recruitment portal - Introduction of Zhangzhou War Preparation Bridge?

Introduction of Zhangzhou War Preparation Bridge?

Zhangzhou War Preparation Bridge was built in the early 1970s. The bridge deck is 27 meters wide and has four lanes in both directions, with a total length of 438 meters and a design speed of 50 kilometers per hour. It is the main project on the original 324 national highway. As 10 was still in the middle of the Cultural Revolution, under the slogan of "preparing for war, preparing for famine and serving the people" at that time, according to the special geographical position of Zhangzhou City and the situation of Taiwan Province, the relevant departments named this bridge "War Preparation Bridge".

Scenic spot

The war preparation bridge is located on the beautiful Xixi of Jiulong River, adjacent to many scenic spots. It mainly includes Youwei Pavilion, Bagua Building and Jiang Bin Park. This is the main tourist attraction in Zhangzhou and a large number of tourists come here every year.

Technical indicators

Prestressed concrete partial cable-stayed bridge is a new bridge type abroad, which started late in China. Zhangzhou War Preparation Bridge is the first time that this system has been used in domestic highway bridges. The total length of the bridge is1.297m, the deck width is 27m, the main span is1.32m, and the two secondary spans are 80m and1.32m respectively. Tower and beam are integrated, tower and pier are separated, and the structure is novel.

The main span132m, the two side spans are 80m each, and the bridge deck is 27m wide. It adopts the structural system of tower beam consolidation and tower pier separation, which is the first case in China. Zhangzhou War Preparation Bridge is a three-span (low-pylon) cable-stayed bridge with a main span of132m and a side span of 80.8m.. The north approach bridge and the south approach bridge are 6× 32m and 5× 32m continuous beams respectively. The bridge is provided with a longitudinal slope, and the main bridge is provided with a herringbone slope of 1%. The radius of vertical curve is 8000m, the longitudinal slopes of the approach bridge are 0.55% and 3.5% respectively, and the radius of vertical curve is 4000m and 16000m respectively. The northern end of the north approach bridge is about18m on the transition curve. The main bridge is a prestressed concrete partial cable-stayed bridge with single cable plane and three spans (80.8+ 132+80.8), with a length of 296.3 meters.

Zhangzhou War Preparation Bridge at Night

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.