Job Recruitment Website - Recruitment portal - 12m iron shed need to be pasted?
12m iron shed need to be pasted?
Need a position.
Generally, an iron scaffold is built by digging a hole 40 cm square, putting a steel pipe column in it, and then pouring cement. The spacing of iron shed columns is about 3.5 meters, which is the most suitable, strong and beautiful.
The concrete methods of iron frame shed column are as follows:
1. First weld the column foot with the rear steel plate and pull up the explosion-proof screw.
2. Secondly, the side length of the steel plate is 8cm longer than that of the constant column, with a thickness of 8mm and four holes.
3. Just pull the explosion screw and fix it.
4. Because the color steel shed requires high construction technology, it must be operated by professionals.
- Previous article:China CRRC recruitment conditions
- Next article:Salary of Baotou Jingao slicer
- Related articles
- Where are several KFC in Handan, Hebei? How many McDonald's are there? Where are they?
- Is there a company called Sinopharm Ingenuity?
- What institutions are there in gusu district?
- Wannian county Minfeng trading firm recruitment information, how about Wannian county Minfeng trading firm?
- How long will you give notice after the interview of Zhongli International Leasing?
- Which supermarket in Foshan has sleeves?
- When does Yuncheng electronic driver's license open?
- How much is the monthly salary for the administrative class at the Third People's Hospital of Henan Province?
- How many times did Wenjiang Pinsheng interview?
- Will the reality be crazier than the movie after watching "Big Shot" in 18 years?