How many lines are there in Ningbo subway? When did it start operation?

As of July, 20 19, there are three * * * lines in operation in Ningbo Metro, namely 1 line, Line 2 Phase I and Line 3 Phase I, all of which are subway systems. There are two starting lines, Line 4 and Line 5, which have not yet been put into operation.

Lines 1 and 1 (Phase I and Phase II)

On June 26th, 2009, the first phase of Ningbo Rail Transit 1 Line officially started construction. On May 30th, 2065438 10, the first phase of Ningbo Rail Transit 1 Line was put into trial operation.

20 12 In July, the National Development and Reform Commission approved the feasibility study report of the second phase of Ningbo Rail Transit 1 Line and agreed to build the second phase of Ningbo Rail Transit 1 Line. 20 1 6 At 06:00 19 on March 9, Ningbo Rail Transit Phase II1Line was officially put into trial operation.

2. The second line

On February 23rd, 20 10, 10, the first phase of Ningbo Rail Transit Line 2 officially started construction. On September 26th, 20 15, the first phase of Ningbo Rail Transit Line 2 was put into trial operation.

Line 3 and Line 3

20 14,14 On February 24th, the first phase of Ningbo Rail Transit Line 3 officially started construction. On June 30th, 20 19, the first phase of Ningbo Rail Transit Line 3 was put into trial operation.

4. Line 4 (started but not running)

2015165438+1October 30th, Ningbo Rail Transit Line 4 officially started construction.

Line 5, Line 5 (started, not running)

2065438+On September 28th, 2006, the first phase of Ningbo Rail Transit Line 5 officially started construction.

Extended data:

According to Ningbo Urban Rapid Rail Transit Construction Plan (20 13-2020), it is predicted that by 2020, Ningbo will form a basic rail transit network with a total mileage of 172km. According to the needs of economic and social development, Line 7 has been added to the new round of rail transit network revision.

1 Line 1 was completed and opened to traffic on 20 14, Line 2 was put into trial operation at the end of 20 15, and Line 2 was put into trial operation in the first half of 20 1 6, forming a cross-shaped rail transit skeleton with a total mileage of 7 1 km.

Line 2 Phase II, Line 3, Line 4 and Line 5 have been included in the second round of construction and are expected to be completed and opened to traffic in 2020. In addition, the second phase of Line 5, Line 6 and the planned new Line 7 are expected to be completed and opened to traffic in 2025.

According to the passenger flow forecast results, after the basic rail transit network in Ningbo is formed in 2020, the number of bus trips in the urban area will reach 5.6 million, accounting for 34.4% of the total urban travel modes;

Considering the volume of urban rail transit, the number of bus trips reached 6 1.7 million, the proportion of rail trips to public transport was 38. 1%, the rail transfer coefficient was 1.40, the average distance was 1.7km, and the passenger intensity was 1.2 million.

Baidu Encyclopedia-Ningbo Rail Transit