Job Recruitment Website - Recruitment portal - How much is Luoyang home improvement quotation?

How much is Luoyang home improvement quotation?

Luoyang decoration quotation:

A, basic engineering

1 square meter against the wall /30 yuan carries garbage.

2. Square meters of wall masonry/100. Yuan (Baoshijing brand 325 #) cement yellow sand lightweight brick.

3. The dosage of wall cement is m2/15 yuan cement sand. (Shijing 325 # cement yellow sand)

2. Water and electricity installation project

1 waterproof and moistureproof project m2 /40 yuan (environmental protection gaode K 1 1 waterproof mortar)

2. Bathroom caisson m2 /60 yuan (lightweight ceramsite)

3. Install drinking water pipe /50 yuan, including slotted pipe joint, without faucet. (Liansu or PPR environmental protection hot melt pipe)

4. Install sewer pipe /50 yuan Liansu pvc sewer pipe.

5. Circuit installation location/120 yuan, including 2.5mm line of GB conduit bottom box, excluding lamps. (GB double plastic Qingfeng flame retardant copper core wire, flame retardant plastic pipe, Matsumoto panel, concealed.

6. Installation location of air-conditioning socket /240 yuan contains national standard conduit bottom box 4mm wire national standard double plastic Qingfeng flame-retardant copper core wire.

7 Cable installation position /90 yuan including socket. (Ampere cable)

3. Woodworking project

1 wardrobe production square meters /650 yuan (15cm wood core board, 3cm panel, Dulux wood lacquer).

2. The plasterboard is hung with a flat ceiling of square meters/100— 150 yuan light steel keel 9 mm plasterboard cladding. (9% Taishan brand gypsum board)

3 gypsum corner line meter/18 yuan (Guangzhou Suihua gypsum line includes fittings. )

4 Door cover making set 650 yuan (Li Gan brand 15cm wood core board, 3cm panel, Dulux wood lacquer) ordinary spherical lock.

5. Wood corner line meter /40. Yuan 9% plywood 3% craft wood veneer solid wood line wrapping.

6 bathroom kitchen ceiling 90- 1 10 yuan 0.8 aluminum-plastic plate

Four. Mud water engineering

1 ground leveling project m2 /30 yuan. (Shijing 325# cement, yellow sand, artificial. Within 5 cm, more than 5 cm per square meter plus 5 yuan)

2 m2 floor tile paving /38 yuan (pure labor)

3 m2 marble pavement /60 yuan (labor cost)

4 Paving marble square meters /80. Yuan (labor force)

5. Foot line meter/13 yuan (labor cost)

6 threshold marble paving strip /38 yuan (manual)

Stone is not included.

7 window sill paved with marble (20 cm wide flat window). 30 yuan (artificial) contains no stones.

8. Square meters of wall tiles /38 yuan (Shijing 325# cement, yellow sand, artificial) excluding tiles.

Verb (abbreviation for verb) Paint and wall work.

1 grey square meter of wall fan /8. Yuan cleaned the wall twice. (Environmental polymorphic putty powder and labor)

2 square meters wallpaper /25. Yuan Bao approved grey polishing and moistureproof (excluding wallpaper).

3. Wall painting: m2/12- 15 yuan. After the wall is dry, polish it and brush it three times (Dulux or Nippon 5 1 wall).

Shovel wall skin square meters/original surface 6 yuan.