Job Recruitment Website - Recruitment portal - Where is Nanchang East Station?

Where is Nanchang East Station?

Nanchang East Station is located in Luojia Town, Qingshan Lake District, Nanchang City, Jiangxi Province, China.

2065438+On February 29th, 2007, 65438+2007, the National Development and Reform Commission of People's Republic of China (PRC) approved the feasibility study report of building a new Nanchang-Huangshan railway through Jingdezhen, making it clear that Hangzhou-Changzhou high-speed railway will be introduced into Nanchang hub and Nanchang East Station will be set up.

On April 9, 2020, the architectural design of Nanchang East Station was confirmed. On March 2, 20021year, Nanchang East Station started construction; At the end of 202 1, the foundation pit of the tunnel under Nanchang East Station was excavated. On April 10, 2023, the overall sliding project of the roof steel structure of Nanchang East Station was completed.

Nanchang East Station is located near Datang Lake Village, Luojia Town, Qingshan Lake District, Nanchang City, 3 kilometers away from Changnan Avenue and 4 kilometers away from Changdong Avenue. The station is basically parallel to Tianxiang Avenue and located 750 meters east of Tianxiang Avenue.

general layout

Nanchang East Station is an elevated overpass+side station building, which adopts the passenger flow line of "getting on and off, entering the station at the waist". The layout of Nanchang East Station is designed according to "one axis, two centers, multiple corridors and multiple areas". The station is arranged in the north-south direction, and the station building crosses it in the east-west direction. On the east side of the station is the railway production and living room, and on the west side is the urban living room and the business in the station. Offices and hotel rooms are arranged on the north and south sides through the integrated design of station and city.

By the end of 65438+February, 2022, the scale of Nanchang East Station was 8 lines 16, including 4 main lines, which were integrated into arrival and departure lines 1 1. The station is equipped with 1 basic platform, 6 island intermediate platforms and 1 side platforms. Stations are set in different directions, and Hangzhou-Changzhou high-speed railway is outsourced to Beijing-Hong Kong high-speed railway to introduce a comprehensive parking lot. The 1 vertical folding line is introduced and set at the northern end of the station, and the running line of the motor train is led to Nanchang East Motor Train Station at the southern end.

The above contents refer to Baidu Encyclopedia-Nanchang East Station.