Job Recruitment Website - Recruitment portal - Simple glass installation project contract

Simple glass installation project contract

As time goes by, contracts appear more and more times, which is both a guarantee and a constraint for both parties. Then do you know the format of the contract? The following is a simple version of the contract template for glass installation project that I collected and sorted out. Welcome to share.

Party A's simple glass installation project contract 1:

Party B:

According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, Party A and Party B, through friendly negotiation, have reached the following terms on matters related to the construction of this project, which are expected to be observed by * * *.

I. Project name:

Project location:

Scope of work: glass installation, aluminum plate installation, steel frame design change quantities, exposed concrete columns, Liang Yinfen acrylic polyurethane anticorrosive topcoat (subject to the actual design change notice).

Second, the contract period:

Commencement and completion dates: according to Party A's schedule;

Third, the quality standard:

Engineering quality standard: qualified

Four. Contract price:

1, the purchase price of glass is RMB/㎡, and the cost of single claw material, double claw material and four claw material of glass claw parts is RMB/set;

2. The purchase price of aluminum composite plate is RMB/㎡ (Huatian brand is 4mm thick

3. The installation cost of glass is RMB/㎡, and the installation cost of aluminum plate is RMB/㎡;

4. The cost of glass structural adhesive is RMB/piece, and the installation cost of aluminum plate and steel skeleton is RMB/㎡.

5, aluminum fastener material cost yuan/㎡;

6. Repaint the paint, remove the glass, and transport the steel to the roof for settlement on an hourly working day.

Verb (abbreviation for verb) Settlement and payment methods:

The warranty period of intransitive verb engineering quality: according to the relevant provisions of the state.

Seven, safety in production:

1. In the construction process, we must strictly abide by the Law on Work Safety, Regulations on Work Safety in Construction Projects, Construction Safety Inspection Standards and various safety regulations related to work safety, and sign a responsibility letter for work safety with Party B. ..

2. Party B shall ensure civilized construction on site according to the requirements of the Owner and Party A. ..

Eight. Party B promises to Party A to carry out the construction and completion in accordance with the contract, and undertake the responsibility of project quality warranty within the quality warranty period.

Nine. Entry into force of the contract:

1. Time of contract conclusion:

2. This contract shall come into effect after being signed and sealed by both parties, and shall automatically become invalid after the price is fully settled. If there are any outstanding matters, both parties shall settle them through consultation.

Party A (signature or seal): Party B (signature or seal):

Year, month, sun, moon, sun.

Second Owner of Simple Glass Installation Project Contract (Party A): Tao Hong Anxian Branch.

Contractor (Party B): xx Glass

Since Party A needs to buy Party B's glass in the renovation project of Huaping Restaurant storefront, according to the provisions of relevant laws and regulations, Party A and Party B have reached the following terms through consultation on the basis of equality and voluntariness, and shall abide by them jointly.

I. Overview of the Project:

1, project name: original dining room glass installation project.

2. Contract content: The gatepost is made of 8mm black painted integral glass, and the facade needs to be sprayed with words. Cost 120 yuan/m2; The door head is made of 5mm black stained glass, and the cost is 100 yuan/m2; Printing on the tea mirror in the middle of the indoor cylinder, cost: 1 10 yuan/square meter; Indoor decorative cabinet partition 10 mm glass edging installation, cost: 80 yuan/m2; The part that needs to be printed on stained glass shall be appropriately subsidized per square meter.

3. Supply and transportation mode: Party B shall undertake transportation and installation, and Party A shall accept the finished products at the construction site, and the paid-in party shall settle the accounts.

4. The materials must meet the national qualified standards, and the glass must be sealed before spraying special glass paint. The joints should be tight, the glue should be neat and round, the glass must be sealed before painting, and the installation must be safe and firm. If the glass installation is not firm, Party B shall bear all safety responsibilities.

5, time limit for a project, completed within 7 days after signing the contract.

Two. Work of Party A:

1. What is the site representative appointed by Party A to be responsible for the acceptance of the goods?

2. Pay as agreed.

Three. Work of Party B:

1. Party B Tang is the representative of Party B and is responsible for all matters of this project.

2. Party B is responsible for safety.

Four. Price and settlement agreement:

Payment method: Party A shall pay Party B an advance payment of 65,438+0,000 yuan before June 9, 2010, and pay it to 95% of the total cost within one week after the completion acceptance, and the remaining 5% shall be used as the quality guarantee, which will be paid three months later.

Verb (abbreviation of verb) agreement on liability for breach of contract:

If either party breaches the contract, the breaching party shall compensate the observant party for twice the direct loss. Matters not covered in this contract shall be settled by both parties through friendly negotiation. If negotiation fails, either party may bring a lawsuit to Anxian People's Court according to law.

This contract is made in duplicate, with each party holding one copy. It shall come into effect from the date of signing and terminate when the performance is completed.

Party A (signature): Party B (signature):

Entrusted agent:

Address: Address:

ID number: ID number:

Tel: Tel:

Date:

Contract III of Party A's Simple Glass Installation Project:

ID number:

Hereinafter referred to as Party A.

Party B:

ID number:

Hereinafter referred to as Party B.

Theme:

Through consultation between both parties, it is agreed that Party A will contract the installation project of glass railings in Xuanhan Yilian Trade City to Party B. In order to clarify the responsibilities and obligations of both parties, the following contract terms are hereby signed for both parties to abide by.

I. Project Content and Contract Scope:

The first phase of Yilian Trade City, the number of railings is about1000 m; The contract work does not include materials (Party B is responsible for small auxiliary materials).

Second, the quality requirements:

Party B must carry out the construction in strict accordance with Party A's requirements, with full welds, smooth solder joints and qualified quality; During the working period, Party B's personnel must abide by the construction operation rules and obey the reasonable command and arrangement of Party A. ..

Third, the time limit for a project requirements:

Party B must obey the progress of Party A's whole project, cooperate unconditionally, and complete all the quantities on time.

Four, the unit price and quantity calculation method:

40 yuan/m of balcony railing is calculated as qualified railing extension meter.

Verb (abbreviation for verb) Terms of payment:

When Party B's personnel enter the site, Party A shall pay RMB () for purchasing screws, welding wires, gas and living security during the construction;

The intermediate payment shall be measured on a monthly basis, and 60% of the total price shall be paid according to the completed qualified quantities, that is, 40×60%= 24 yuan per meter;

Pay 90% of the contract price (i.e. 36 yuan per meter) after the glass installation is completed;

After completion, RMB () will be deducted, and the rest will be completed within one week. The warranty payment shall be paid within ten days after the expiration of the warranty period, and the warranty period shall be months.

The responsibility of intransitive verb Party A:

1. Party A shall provide water source, power supply (each building has a special power switch box), railing posts, face pipes and glass for Party B's continuous construction.

2. After the completion of the project, Party B shall promptly notify Party A for acceptance, and Party A shall conduct acceptance within days after receiving the acceptance requirements. If Party A refuses to accept the project, it will be deemed as qualified.

3. In case of any dispute between the two parties on whether the quality acceptance is qualified, both parties shall entrust a third-party intermediary agency for acceptance to determine whether the project is qualified.

4. Party A shall make safety technical disclosure to Party B before construction, and supervise Party B to carry out the construction according to the requirements of construction specifications.

5. Party A shall formulate safety technical protection measures according to the engineering characteristics and relevant regulations. If Party A stops work, Party A shall pay Party B the loss of work stoppage at RMB/day.

6. Provide vertical transportation facilities or derrick.

Seven. Party B's responsibilities:

1, Party B is responsible for labor protection articles such as safety helmet, gloves, work shoes, screws, welding wires, gas, glass glue, power tools (including wires within 50m) and hand tools used in the construction.

2. Party B shall arrange workers according to Party A's overall progress and obey Party A's reasonable process crossover arrangement.

3. Party B shall carry out the construction in strict accordance with the relevant construction technical operation specifications, individual operation specifications and requirements, and on-site safety technical disclosure. If the installation quality is unqualified, Party B shall be responsible for rework.

4. If Party B's construction and production personnel do not observe labor discipline or operate illegally, all responsibilities and expenses arising therefrom shall be borne by Party B. ..

Eight. Liability for breach of contract:

If either party breaches the contract, it shall compensate the other party for the corresponding losses and pay a penalty of 5,000 yuan.

Nine. Matters not covered in this contract shall be settled by both parties through consultation; This contract is made in duplicate, one for each party. It will take effect after being signed by both parties, and will automatically become invalid after the balance is settled.

Party A (signature):

Contact telephone number:

Party B (signature):

Contact telephone number:

Contract signing time: