Job Recruitment Website - Recruitment portal - Labor contract for fire protection installation project

Labor contract for fire protection installation project

With the increase of high-rise building projects in recent years, the safety performance of fire-fighting installation projects has increasingly become one of the issues that people pay attention to. So what should we pay attention to when signing a labor contract? The following is a sample of the labor contract that I have compiled for you. Thanks for reading it.

Labor Contract for Fire Protection Installation Project 1

Employer: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B)

Party A will contract the fire fighting project to Party B for construction and installation. According to the Contract Law of People's Republic of China (PRC) and the Regulations on the Contract of Construction and Installation Projects, combined with the specific conditions of civil engineering, following the principles of equality, voluntariness, fairness and honesty, the following contract terms are reached through consultation between both parties.

I. Project name:

Second, the project address:

3. Project content: automatic sprinkler system, fire hydrant system, automatic alarm system and fire fighting linkage, etc. Should be embedded and installed according to the drawings, until the fire control project of this project is completed and accepted.

4. Contracting method: contracting, embedding, installation and debugging, and cooperation with acceptance.

1, this project is based on the construction area 12 yuan/square. If the project is reworked, changed or increased due to the owner's reasons, the expenses incurred by Party B shall be signed and settled by Party A after Party B fills in the project signing and recognition form.

2. This project adopts contract mode. Party B is responsible for the mechanical equipment and tools needed for the construction, and Party A is responsible for the consumables needed for the mechanical equipment. According to the site conditions, Party A will provide 6 sets of scaffolding during installation.

5. Construction period: The construction period of the construction unit shall prevail, and the civil works and decoration works shall be carried out simultaneously.

6. Project quality: Party B shall carry out construction seriously to ensure the project quality. If Party B fails to operate according to the specifications or makes mistakes in operation, the loss of rework expenses shall be borne by Party B. If Party A puts forward rectification opinions due to quality problems during construction and Party B refuses to rectify, Party A has the right to terminate the contract and issue a penalty notice, which will be deducted from the project progress payment.

VII. Supply of Equipment and Materials:

1. When Party B enters the site for construction, Party A is responsible for providing Party B with construction electricity, construction water and vertical transportation of large equipment and materials, and the expenses shall be borne by Party A.. ..

2. Party A is responsible for repairing the grooves and holes needed in the construction, and Party B is responsible for the failure of embedding.

3. If the materials arrive in time, Party B will report one week in advance and Party A will arrive seven days. If there is any delay in work, Party A shall pay Party B the delay fee of 150 yuan per day.

Eight. Party A shall be responsible for the construction quality problems caused by the quality problems of materials provided by Party A..

Nine, project payment:

1. Payment method of project funds: After Party B signs the contract, the personnel will enter the site for construction, and Party A will pay the living expenses in advance one week later. During the embedding period, 70% of the project payment shall be paid according to the reserved image progress quantity (the quantity approved by Party A). During installation, 70% of the monthly project progress payment (the amount approved by Party A) shall be paid. After the project construction is completed, Party A shall pay 90% of the project payment after self-inspection, and 10% of the total labor cost of the remaining project payment shall be paid within two weeks after the completion acceptance, and the remaining 5,000 yuan shall be paid within one week after the project warranty period expires (warranty period 1 year).

2. Party B shall report the progress to Party A before 28th of each month, and Party A shall pay Party B by the payment method negotiated by both parties before 5th of the following month.

X. safe production:

When Party B's personnel enter the site, they shall accept Party A's on-site safety education and safety operation disclosure, and carry out construction in strict accordance with safety operation regulations. It is forbidden to frolic when working high above the ground, go to work after drinking, throw things at high altitude and other illegal situations. Safety accidents within 1 10,000 yuan during the construction process are major safety accidents, which shall be the responsibility of Party B and resolved through consultation with Party A.. ..

XI。 Party A's responsibilities:

Party A is responsible for coordinating the on-site construction site, and Party A is responsible for the required materials and providing warehouse storage tools.

If the drawings provided by Party A are inaccurate, Party A shall be responsible for the expenses of rework, disassembly and working hours.

Party A is responsible for providing a set of standard and effective construction drawings.

Party A is responsible for the coordination of various types of work with Party B, and the expenses incurred shall be borne by Party A. When Party B finds that the drawings are inconsistent with the site, it shall promptly report to Party A and the site management personnel of the construction party for handling.

Twelve. Party B's responsibilities:

Do a good job in this process, the next process and the last process. Do a good job in on-site safety production, civilized construction, care for materials, protect finished products, save materials and make reasonable construction. If Party B damages the finished product, Party B shall be responsible for it. Abide by Party A's relevant rules and regulations and obey orders. Part of the on-site countersignature shall be reported by Party B to Party A, and Party A shall report it to the construction unit after sorting it out. Party B shall carry out engineering construction and commissioning according to the construction drawings confirmed by both parties, and be responsible for the safety and quality of on-site construction. Cooperate with Party A in the acceptance of concealed works, and make acceptance records and completion data. Workers' insurance expenses shall be handled by Party A. ..

13. validity of the contract: it will automatically become invalid after the project is completed and accepted and the project payment is settled. Fourteen Matters not covered in this contract shall be settled by both parties through consultation.

15. This contract is made in duplicate, one for each party, and shall come into effect after being signed by both parties, with the same legal effect.

Party A: Party B:

Entrusted agent:

ID number: ID number:

Tel: Tel:

Date: Date:

Labor Contract II for Fire Protection Installation Project

Party A (labor contractor):

Party B (Labor Contractor):

In the spirit of friendly cooperation and in accordance with the Contract Law and other relevant laws, Party A and Party B sign the following contract on the basis of equality and fairness:

I. Overview of the Project

Project address:

Project name:

Project content:

Second, the contract price

1. Indoor fire hydrant system is only calculated according to the number of boxes, excluding other installation costs such as pipes and fittings. The specific unit price is as follows: box specification: 1600_700_240, unit price: 450 yuan/piece.

2. The indoor automatic sprinkler system is only calculated according to the number of nozzles, excluding other installation costs such as pipes and fittings. The specific unit price is as follows: nozzle type: downward spraying, unit price: 75 yuan/set.

3. The fire alarm system is calculated according to the number of probes, and included in the installation cost of weak electric conduit (3 yuan /m). The specific unit price is as follows: probe unit price: 70 yuan/set.

4. The outdoor fire water supply system is only calculated according to the pipeline length (from the fire pool water supply supervisor to the outdoor municipal water supply pipeline, about120m), excluding other installation costs such as accessories. * * * 3200 yuan, excluding the cost of earthwork excavation.

5. Sporadic expenses such as opening holes in black boxes, blocking holes, and opening holes in walls. The specific unit price is as follows: fee content: opening DN 150 holes, unit price: 45 yuan/piece.

6. Due to the changes in the design, requirements of the owner and the supervisor, Party A shall pay Party B the labor fee according to the fixed labor fee after the final examination of the visa form.

7. The fire pump house includes two main fire pumps, two pressure stabilizing pumps, 1 pneumatic tank and 1 wet alarm valve, totaling 1.5 million yuan.

8. The debugging fee of fire fighting system is only the debugging fee of alarm system, with a subtotal of 3,200 yuan. There is no additional charge for the debugging of fire hydrant and automatic sprinkler system.

Three. terms of payment

1. Within 1 week after Party B enters the site for construction, Party A shall pay Party B a monthly living allowance of 5,000 yuan.

2. After Party B installs the fire sprinkler branch pipe and weak current branch pipe (including threading), Party A shall pay 85% of the project payment to Party B within 1 week; Pay off the balance within one month after the fire department has passed the acceptance.

Four, materials and construction site

1. Party B shall make a list of engineering materials, and Party A shall select brands for Party B to buy, and Party B shall be responsible for the construction, with more refunds and less supplements. Party B's construction tools and pressure testing tools shall be provided by Party B. ..

2. Party B shall provide Party A with a list of materials to be purchased two days in advance, and Party A shall timely purchase materials for the use of the construction team within two days, and both parties shall bear the responsibilities and economic losses of the other party for delaying the construction period.

3. Before Party B enters the site, Party A shall provide the construction surface and residence. If renting a house outside, Party A pays the rent and Party B pays the utilities.

Verb (abbreviation of verb) contract dispute

1. In case of any dispute, Party A and Party B shall settle it through negotiation first.

2. If negotiation fails, a lawsuit can be brought to the court where the dispute is located.

3. This contract is made in duplicate, with each party holding one copy.

Representative of Party A (signature): person in charge of Party B (signature):

Tel: Tel:

Date: Date:

Labor Contract for Fire Protection Installation Project 3

Employer (full name) (hereinafter referred to as Party A)

Contractor (full name) (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement on the construction of this construction project and concluded this contract.

Article 1: Project Overview

Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1, fire hydrant system;

2. Automatic sprinkler system;

3. Automatic alarm system;

4. Ventilation and smoke exhaust system;

5. Cooperate with the manufacturer and Party A for debugging and fire control acceptance of the above system.

The construction scope includes the following items:

1, which is filled through the pipe holes of walls and plates;

2, fire hydrant box hole filling;

3, outdoor trench earthwork excavation backfill;

4, high-altitude scaffolding;

5. Handle the coordination with the owner and other construction units;

6, actively handle the visa in the process of the project;

5. Do a good job of collecting, sorting and arranging fire control completion data. Provide standard layout of fire acceptance information.

Article 2: Term of Contract

March 20 10, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 3: Project Quality

1. Party B must carry out the construction according to the engineering construction drawings, explanatory documents and relevant specifications.

2. In the process of construction, if the quality is unqualified, Party B shall rework it in time, and the expenses shall be borne by Party B. ..

Article 4: Project Price

1, the labor cost of this project is quoted as follows:

① Fire sprinkler pipe

② fire hydrant box.

③ Automatic alarm system

④ Automatic alarm embedding

⑤ Bridge

⑥ Fire water pump room

⑦ Pipeline fabrication and installation

⑧ Ventilation equipment hoisting

Pet-name ruby ventilator installation

Above ①-⑨ Total labor costs are in words:

2. The modification and change in the project shall be subject to the visa confirmed by the supervisor, and the labor cost shall be calculated according to _ _ _ _ _ _ of the visa amount.

3. The advance payment of engineering labor cost is _ _ _% of the total contract price.

Article 5: Method of Payment

1. As this project is under construction, Party A shall pay the advance payment for the project to Party B in one lump sum within _ _ _ _ _ _ _ _ years.

2. According to the progress of the construction site, Party A negotiates with Party B, and Party A pays the project cost to Party B according to the construction progress: RMB _ _ _ _ _ _.

3. After the construction of this project is completed, Party A shall pay 90% of the total labor costs, that is, ¥ _ _ _ _ _ × 90% = ¥ _ _ _ _ _ _ _ (in words: _ _ _ _ _ _), including the progress payment of engineering labor costs received every month before.

5. After the trial operation of the project is completed and passed the acceptance of relevant departments, Party A shall pay _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Article 6: Materials

Party B shall submit the procurement plan of main materials, auxiliary materials, consumables, labor insurance supplies and product information, and ensure the use of products supplied by Party A in principle. When the quotation provided by Party A is higher than the self-purchased price of Party B, the average quotation of Party A and Party B shall be added and subtracted, and the middle value shall be taken as the pricing.

Article 7: Breach of Contract and Liability

After the signing of this contract, neither party shall breach the contract, otherwise the breaching party shall pay the observant party a penalty of 5% of the total contract price, and bear the economic losses and related responsibilities caused to the other party.

Party B's responsibilities:

1. If the quality of the project does not meet the quality requirements specified in the specification, Party B shall be responsible for the free repair and rework, and the expenses shall be borne by Party B;

2, in the process of construction should actively cooperate with decoration and other professional, avoid unnecessary rework; Obey the scheduling and arrangement of the company's on-site management personnel;

3. Party B is responsible for on-site safety education, and Party A is not responsible for any safety accidents.

Party A's responsibilities:

1. Party A shall provide 3 drawings;

2. Party A shall pay the project payment in cash on time;

3. Take measures to make up for or reduce the losses caused by the shutdown or delay of the project and Party A's materials, and adjust and arrange the work of personnel by themselves;

Article 8: Safe Construction

1. Party B must strengthen site management and organize construction in accordance with existing laws and regulations. Party B shall be responsible for the accidents caused by Party B's ineffective measures.

2. Party B shall bear the relevant insurance purchased on site according to the safety requirements.

Article 9: Project Warranty

From the date of acceptance, Party B shall guarantee the whole system for two years, and the warranty fee shall be 5% of the total contract price, in words: _ _ _ _ _ _ _ (in figures: RMB _ _ _ _ _ _ _ _ _), that is, RMB _ _ _ _ _ _ × 5 yuan. The warranty period belongs to Party B's construction quality problems, and Party B shall be present for maintenance within 24 hours, and the expenses shall be borne by Party B. If Party B fails to be present within 24 hours, Party A and a third party shall arrange maintenance, and the expenses incurred shall be borne by Party B. In case of product problems or improper use and man-made damage, all expenses shall be borne by Party A or a third party, and Party B shall be responsible for maintenance, and the expenses shall be settled according to the facts. After the warranty period expires, Party B shall provide lifelong paid maintenance.

Article 10: Other

1. This contract is made in duplicate, each party holds one copy, which has the same legal effect;

2. This contract shall come into effect after the representatives of both parties sign, affix official seals or press fingerprints;

3. Matters not covered in this contract shall be settled by both parties through negotiation in the spirit of friendly understanding. If negotiation fails, both parties agree to apply to the relevant departments for arbitration or litigation;

4. Copies of ID cards or company documents of both parties are attached as attachments.

Party A (signature): Party B (signature)

Handler: Handler:

Year month day:

Relevant clauses of labor contract for fire protection installation project:

★ Template of Labor Contract for Fire Protection Installation Project

★ Model labour contract for fire fighting engineering

★ Model labour contract for fire fighting engineering (2)

Taken the fire installation engineering labor contract template (2)

★ Fire service contract

★ template of fire engineering labor contract

★ 3 pieces of fire engineering labor contract model.

★ Labor Contract for Fire Fighting Engineering

★ Fire Service Contract (2)

★ Three model essays on fire protection installation engineering contract are the latest.