What is the salary of construction workers now?

As far as construction workers are concerned, the difference in wages is actually quite large depending on the type of work. Many workers are choosing to use some reliable methods to find work. They can do this through things like A platform like Yupao.com has many workers waiting for jobs, complete job types, and massive recruitment information. It is undoubtedly very reliable.

Reinforcement Worker: The basement part is paid based on the tonnage of the steel bars, but the boss of the steelworker will do some work for you (about 200 a day). But many people fish in troubled waters. When it comes to the standard level, just like the carpentry, it is all contracted by the brothers' class, and the unit price has been forgotten. Anyway, a master with a flexible mind and hard-working hands and feet can earn 300-400 yuan a day. For new apprentices, they will do some hard work, such as lifting steel bars, loading and unloading steel bars on tower cranes, etc. The price does not exceed 200 a day.

Concrete work: It is a very tiring and hard work. When pouring the foundation, more than 1,000 cubic meters of concrete per raft are poured day and night. In order to make money, the concrete work boss arranged for 5-6 people to work. Some workers were so tired that they fell asleep on the steel mesh. As for wages, the basement part seems to be charged by the hour, about 30 yuan an hour. When it comes to the standard floor, the concrete workers also implement a contracting system. For example, for a standard floor of 130 cubic meters of concrete, 6 people are assigned, and each person pays 180 yuan (some masters' wages are higher), and 8 hours.

Installation type of work: It is easier than the above three types of work, and does not involve much exposure to the sun and staying up late. For some work (around 230 for a master and 120 for an apprentice). There are also contractors for the same standard floor, and the cost of a highly efficient master is 300-400 per day.

Brickworker: Charges are based on the quantity of brickwork. The basement part is about 200 square meters, and the standard floor is 170 square meters. The old master's salary is about 300-400 per day.