Whole process of climbing frame construction

The whole process of climbing frame construction:

1. Installation platform-place the base, install the guide rail and assemble the horizontal truss assembly.

2. Connect the crossbeam to the guide rail with bolts, fix the column of the main frame to the crossbeam, and fix the inclined column to the column and crossbeam.

3. After installing the guide device attached to the wall, unload the frame body to the guide seat, connect the elevated body with the structure, set up scaffolding, lay the intermediate layer or temporary scaffolding, pull the temporary frame body with the building structure, and hang the external dense mesh safety net.

4. After installing the third beam, install the lifting seat and the upper wall-attached guide seat.

5. Connect the vertical pole of the main frame, erect the frame body to the design height, and lay the top scaffold board and skirting board.

6, laying the underlying safety net and scaffolding, making flap.

7. The upper frame body is effectively connected with the structure (the connection spacing is not more than 6m).

8. Hang the external dense mesh safety net on the top of the shelf.

9. Insert the anti-falling boom into the base anti-falling device and install the lifting wire rope.

10, placing electric control cabinet, distributing cables, installing electric hoist, wiring and debugging electrical system.

1 1. The electric hoist is pretensioned and accepted, and the frame body is dismantled and pulled together with the upper part of the structure, so as to lift one layer synchronously.

12. After all installation, enter the hoisting cycle.

Refer to the above content: Baidu Encyclopedia-Multi-functional Climbing Frame Construction Method