Construction process of hydropower reconstruction 1. The first step of hydropower transformation is hydropower positioning, that is, the position of switch socket and waterway interface in the whole house is determined according to the user's demand, and the plumber should clearly explain the line direction to the user according to the position of switch, socket and faucet.

Moreover, we should pay attention to the principle of "water goes up to the sky and electricity goes down to the ground", that is, the water pipe goes to the ceiling, and the strong and weak electricity goes to the ground as far as possible, and the strong and weak electricity cannot cross and the parallel distance is greater than 30 cm.

2, distribution box, information box installation design should consider the use of convenient, hidden, safe, but also pay attention to the direct connection with foreign trunk lines; Electrical wiring should not be hidden in building load-bearing walls and columns.

3. The electrical circuit design of sockets, switches and lamps should consider the variability of indoor space, prepare for possible different space use conditions, and reduce the obstacles for some users to re-plan and design during use, such as the influence of the movement of desks, decorative cabinets and electrical equipment on electricity and water use. At the same time, it should be noted that the price of new buried wires is different from that of replacement wires.

4, in the case of heavy lamps and lanterns, attention should be paid to the load-bearing components embedded in the ceiling, not directly installed on the wedge, so as not to cause indoor unsafe factors.

5. After positioning the water and electricity, the next step is slotting.

The grooves made by a good grooving master are basically straight lines, and the edges of the grooves are basically hairless.

Note that before slotting, be sure to ask the plumber to mark all the water and electricity trends on the wall, and remember to compare them with the water and electricity diagram to see if they are consistent.

6, waterway reconstruction, pay attention to the surrounding must be clean and tidy.

When signing a waterway reconstruction contract, it is best to indicate the materials used for waterway reconstruction.

In addition, attention should be paid to the size of the sewer pipe in the original room during waterway reconstruction, and the pipe connected with the sewer pipe should preferably match the original sewer pipe.

Hot and cold water pipes should be hot on the left and cold on the right, and the spacing is generally not less than 20cm, depending on the spacing of hot and cold water pipes on the faucet.