Job Recruitment Website - Recruitment portal - Recruitment information of Yuanyanghu Power Plant in Ningxia

Recruitment information of Yuanyanghu Power Plant in Ningxia

Ningxia Yuanyang Lake Power Plant Phase I Project

Project Name: Yuanyanghu Power Plant (Phase I) Project in Ningxia

Nature of new project

Enterprise-oriented joint-stock system

Ye Hang electric power company

The total investment is 4.649 billion yuan.

The progress stage is the feasibility study approval stage (approval and evaluation).

Examination and approval authority: National Development and Reform Commission

Funds have been put in place and are being implemented.

Construction period 2007 -2009

Ciyaobao Town is located in lingwu city, Ningxia.

Construction content: Two 600 MW supercritical domestic air-cooled turbo-generator sets will be built.

Bidding equipment: (for reference)

Main engine: generator set, fluidized bed boiler and steam turbine.

Materials: four pipe fittings, etc.

Others: air cooling island

Auxiliary machines: water treatment, condensate polishing, primary fan, induced draft fan, various valves, transmitters, industrial TV, electronic belt scale, truck scale, electromagnet, water ring vacuum pump, condensate pump, heating network heater, turbine bypass device, roof ventilation, coal conveying equipment, coal pulverizer, coal feeder, slag removal system, deaerator, air preheater, crusher, pneumatic ash removal system, etc. Iron remover, DCS, water filter, boiler make-up water treatment system, scraper slag catcher, transformer, main transformer, GIS, bucket wheel stacker reclaimer, flue baffle, power cable, cable tray, hydrogen production equipment, soot blower, steam-water sampling device, diesel generator set, etc.

Project introduction

Yuanyanghu Power Plant is a coal-electricity integration project planned by Luneng Group in Ningdong Energy and Chemical Industry Base, Ningxia. It is located about 2.5 kilometers northeast of Ciyaobao Town, lingwu city, under the jurisdiction of Ningxia Hui Autonomous Region, 5.0 kilometers north of National Highway 307, 0.92 kilometers northeast of Ciyaobao Water Supply Station, 34 kilometers west of lingwu city and 64.5 kilometers away from Yinchuan City. The eroded land between desert hills, natural altitude 136544. The planned installed power generation capacity is 2,400 MW, which will be constructed in two phases, with reserved expansion conditions. After the project is completed, it will become an important export power plant of Ningdong Energy and Chemical Industry Base.

This project is the first phase, and it is planned to install two 600 MW supercritical domestic air-cooled steam turbines.

The total investment of the project is 4.649 billion yuan.

Investor profile

Ningxia Luneng Energy Heavy Chemical Industry Co., Ltd. is one of the core industrial subsidiaries of Shandong Luneng Group, registered in Yinchuan City. Mainly engaged in the investment and development of coal, electric power, energy, chemical industry and other industries.

Contact: Zhao Hongxing

Tel: 010-51953876 51953870.

Fax: 010-51953515.

Mobile phone:1326160613