Recruitment information of Yuanyanghu Power Plant in Ningxia
Project Name: Yuanyanghu Power Plant (Phase I) Project in Ningxia
Nature of new project
Enterprise-oriented joint-stock system
Ye Hang electric power company
The total investment is 4.649 billion yuan.
The progress stage is the feasibility study approval stage (approval and evaluation).
Examination and approval authority: National Development and Reform Commission
Funds have been put in place and are being implemented.
Construction period 2007 -2009
Ciyaobao Town is located in lingwu city, Ningxia.
Construction content: Two 600 MW supercritical domestic air-cooled turbo-generator sets will be built.
Bidding equipment: (for reference)
Main engine: generator set, fluidized bed boiler and steam turbine.
Materials: four pipe fittings, etc.
Others: air cooling island
Auxiliary machines: water treatment, condensate polishing, primary fan, induced draft fan, various valves, transmitters, industrial TV, electronic belt scale, truck scale, electromagnet, water ring vacuum pump, condensate pump, heating network heater, turbine bypass device, roof ventilation, coal conveying equipment, coal pulverizer, coal feeder, slag removal system, deaerator, air preheater, crusher, pneumatic ash removal system, etc. Iron remover, DCS, water filter, boiler make-up water treatment system, scraper slag catcher, transformer, main transformer, GIS, bucket wheel stacker reclaimer, flue baffle, power cable, cable tray, hydrogen production equipment, soot blower, steam-water sampling device, diesel generator set, etc.
Project introduction
Yuanyanghu Power Plant is a coal-electricity integration project planned by Luneng Group in Ningdong Energy and Chemical Industry Base, Ningxia. It is located about 2.5 kilometers northeast of Ciyaobao Town, lingwu city, under the jurisdiction of Ningxia Hui Autonomous Region, 5.0 kilometers north of National Highway 307, 0.92 kilometers northeast of Ciyaobao Water Supply Station, 34 kilometers west of lingwu city and 64.5 kilometers away from Yinchuan City. The eroded land between desert hills, natural altitude 136544. The planned installed power generation capacity is 2,400 MW, which will be constructed in two phases, with reserved expansion conditions. After the project is completed, it will become an important export power plant of Ningdong Energy and Chemical Industry Base.
This project is the first phase, and it is planned to install two 600 MW supercritical domestic air-cooled steam turbines.
The total investment of the project is 4.649 billion yuan.
Investor profile
Ningxia Luneng Energy Heavy Chemical Industry Co., Ltd. is one of the core industrial subsidiaries of Shandong Luneng Group, registered in Yinchuan City. Mainly engaged in the investment and development of coal, electric power, energy, chemical industry and other industries.
Contact: Zhao Hongxing
Tel: 010-51953876 51953870.
Fax: 010-51953515.
Mobile phone:1326160613
- Related articles
- Admission criteria of Lishi Sports School
- Is there an airport in Zunyi?
- When will the recruitment of Guangxi banks begin in 2022?
- What is the impact of inflation in Europa Prius 3?
- Will you enter the technical post in Wei Chai according to the boundary?
- How many FAW-Volkswagen 4s stores are there in Dalian?
- Is the welfare in Cyrus good?
- Which neighborhood committee does the Daxing campus of Beijing Vocational College of Social Management belong to?
- Is it credible to recruit signing singers in the same city?
- There are several steel mills in Yingkou, Liaoning.