Job Recruitment Website - Recruitment portal - The second batch of applicants for State Grid in 2023
The second batch of applicants for State Grid in 2023
The second batch of applications for State Grid's recruitment in 2023 will be closed soon (online registration time is 3.3 1-4. 13), and Jiu Shijun has compiled the latest applications in various provinces. The data in the table is calculated according to11April 12:00. The latest data shows that in 2023, the number of applicants for the second batch of State Grid recruitment has exceeded 340,000.
Up to now, the number of applicants has exceeded 340,000! Henan has the largest number of applicants, with more than 3w applicants. In addition to Henan, Shandong, Shaanxi, Xinjiang and Zhejiang also have more than 2 weeks of applicants, and Jiangsu has nearly 20,000 applicants.
There are also Anhui, Hebei, Hubei, Hunan, Jiangxi, Mengdong, Shanxi, Sichuan, Tianjin, Chongqing and other provinces 10. The number of applicants exceeds1w. The provincial company with the least number of applicants is Heilongjiang Electric Power, and the current number of applicants is 346 1.
Up to now, the number of applicants has exceeded 340,000! Henan has the largest number of applicants, with more than 3w applicants. In addition to Henan, Shandong, Shaanxi, Xinjiang and Zhejiang also have more than 2 weeks of applicants, and Jiangsu has nearly 20,000 applicants.
There are also Anhui, Hebei, Hubei, Hunan, Jiangxi, Mengdong, Shanxi, Sichuan, Tianjin, Chongqing and other provinces 10. The number of applicants exceeds1w. The provincial company with the least number of applicants is Heilongjiang Electric Power, and the current number of applicants is 346 1.
Power grid business
Power grid is an efficient energy transmission channel and optimal allocation platform. It is a key link in the sustainable development of energy and electric power, and plays an important role in the modern energy supply system, which is related to national energy security. Since 20 10, the scale of national power grid has nearly doubled, which has ensured the demand for energy and electricity for economic and social development.
In 20 17, the electricity consumption of the whole society in the company's operating area was 5.0 trillion kwh, with a maximum power load of 830 million kilowatts and an installed capacity of1380,000 kilowatts. By the end of 20 17, the length of transmission lines at10 (66) kV and above was 987,000 kilometers, and the transformation capacity was 4.33 billion volt-amperes.
- Related articles
- Is the auxiliary police of Nanning Airport Public Security Bureau hard?
- How many kilometers is it from Nanchong to Yingshan?
- Working hours of household registration office in Huaxian New Area
- How to modify the photo size of special post registration
- State Grid Fraction Line 2024
- How about Jiaozuo Central Branch of Happiness Life Insurance Co., Ltd.?
- Urban water supply and drainage steel pipe leaks due to corrosion perforation, and the general emergency repair method is ().
- Qinshui Century Changxin Industry and Trade Co., Ltd. Recruitment information, how about Qinshui Century Changxin Industry and Trade Co., Ltd.
- Xingtai civil servant interview training class which is better?
- How about Zhuhai Gong Chuang Interactive Media Co., Ltd.?