Job Recruitment Website - Recruitment portal - Is the four-story villa installed outdoors? 100 galvanized steel pipe rainwater, what is the labor cost per meter? Ask the great god for an answer

Is the four-story villa installed outdoors? 100 galvanized steel pipe rainwater, what is the labor cost per meter? Ask the great god for an answer

This price depends on the specific construction difficulty: if aerial work is needed, whether it needs to be fixed by electric hammer drilling. Also consider the total number of tubes that need to be replaced. If only one pipe needs to be replaced, and it is four meters long, it is 60 yuan per meter 15 yuan. However, it is very likely that the master charges according to the project or time, and now the labor cost of decoration workers is generally rising. One day's labor cost is 200-300 yuan. It's just that he goes out once. If it's not difficult for you, it will be done in an hour, and the master will count as half a day. That is 100- 150 yuan. If the quantity is large, according to the construction difficulty, the price is per meter 15-20 yuan.