general rule
In order to seriously implement the national mandatory industry standard construction, the Construction Safety Inspection Department announced "(JGJ59-99), in order to improve the management level of safe production and civilized construction on the construction site, prevent accidents, standardize and institutionalize the safety work, and implement the" Construction Safety Inspection Standard "(JGJ59-99) (this opinion is formulated in accordance with the relevant national laws, regulations and rules, combined with the actual construction projects in this province).
2. Implementation Opinions shall be used together with construction safety inspection standards. The administrative departments at all levels in the province shall inspect and assess the construction safety of construction enterprises, and must implement the joint implementation opinions.
3. According to the requirements of "Building Construction Safety Inspection Standard", all localities should actively promote the use of qualified dense mesh safety net, three-phase five-wire system and steel frame, pick frame and steel pipe fastener, and eliminate bamboo scaffolding, toe frame and steel pipe fastener pick frame. In particular, major urban road projects, piece-by-piece development projects and street residential quarters, covering an area of about/kloc-0.000 million square meters, should take practical measures and take the lead in implementation. The TIC-tac-toe frame of steel pipe fastener, the pick-up frame of steel pipe fastener, the bamboo external scaffold or the external frame did not show his qualification of dense mesh safety net. SinceNo. 65438+ 10 in 2000, it is not allowed to declare provincial civilized standard chemical sites in new construction sites.
4, the implementation of the existing national laws, regulations, standards and regulations, and the implementation of the existing provisions of the state.
5. This opinion is reflected by the Provincial Construction Department, and the construction industry is responsible for the interpretation.
6. The implementation date of this implementation opinion.
safety management
(A) the responsibility system for production safety
1, enterprises and project departments must establish and improve the responsibility system for production safety at all levels, functional departments and all personnel, and bind them up and hang them on the wall, including the responsibility system for production safety of the project management department.
2. The general subcontracting enterprise and the project department shall sign the responsibility book of safety production targets. The project contract must have clear production safety objectives, and the responsibility book for production safety objectives must have clear indicators, production safety objectives and safety assurance measures, and the responsibilities and reward and punishment measures of the same company.
3, complete the work of production safety in the construction site, a binder of various technical operations.
There are more than 50 workers on the construction site, so you must set up full-time security personnel. ? The building area is 65438+1 00000 square meters, and a large website with 50000 square meters needs 2-3 full-time security personnel, who are responsible for the safety production management according to the professional setting 1 full-time security personnel and1safety management team.
5, the establishment of all levels, departments, all kinds of personnel safety production responsibility system, the evaluation of enterprises and projects have a written record. The responsibility system for enterprise departments, personnel and project managers, the safety management of safety production departments, other managers and team leaders of enterprises, and the responsibility system for safety production of the project department shall be assessed once every six months and once every quarter.
(2) Management objectives
1, the construction site must implement the safety production management objectives, safety management objectives should be formulated before the project starts, including casualty indicators, safety standards and civilized construction objectives, and safety measures should be taken.
2. When the project manager and team of the Ministry of Industry and Information Technology are building, the team and employees must sign a safety target responsibility letter to form a construction safety management target responsibility letter, which is decomposed step by step according to their respective responsibilities. The safety objectives and responsibilities of project development are recorded, and the finance department is responsible for monthly assessment.
3. The safety target responsibility letters signed by the project departments at all levels should specify the responsibility content between indicators, safety measures and assessment rewards and punishments.
(3) Construction organization design
The construction enterprise (project) that is preparing the construction organization design (construction scheme) must prepare more comprehensive, specific and targeted safeguard measures according to the construction technology and methods of the project.
2, powerful engineering projects, such as piling, foundation pit support, earthwork excavation, template removal, lifting support, scaffolding, temporary buildings, electricity, material hoist, tower crane, external elevator, etc. must prepare special safety construction organization design.
3, safety precautions and special safety construction organization design content should be targeted, according to the actual project, can effectively guide the construction.
4, the construction organization design and special safety construction organization design must be approved by professional and technical personnel, enterprise technical director, after signing to build official seal.
5. Organize the construction according to the construction organization design, and strictly supervise the implementation of safety measures. Changes to the procedures in the construction process must be approved by the original examination and approval personnel, and a written procedure shall be formed.
(d) Division (sub-division) engineering safety technical test
1, establish technical test of safety system. Safety technology test must be accompanied by construction tasks. Engineering safety and technical inspection of all kinds of branches (subsidiaries). Journalists with fixed workplaces and non-fixed workplaces and types of work can inspect the projects of all branches (subsidiaries) on a regular basis. The team of the new method must carry out safety technical inspection before taking up their posts.
2, safety technical disclosure should include workplace safety facilities, safety regulations, safety precautions, not only to achieve the goal, but also to be simple and clear.
3. Safety technical disclosure must be in written form, and both parties shall perform the signing formalities.
(5) Safety inspection
The enterprise and the project department must establish a regular safety inspection system, and define the inspection, time, content, rectification methods and punishment measures, especially the methods and means of safe and dangerous operations of key components to be dismantled. The inspected company shall not be less than once a month, and a team project shall be at least once every two weeks and at least once a week.
2. All kinds of safety inspections (including inspections) have been done, recorded and timed every time, and corrective measures have been taken for hidden dangers of accidents, which are recorded for review. The inspection department of rectification report must be arranged to rectify the receipt.
3. The rectification of major accidents must be completed on schedule and reported to the company and relevant departments.
(6) Safety education
Establish safety training and education systems and documents for enterprises and construction sites, and define education posts, education contents and education contents.
2. Establish the on-site employee safety education card. The new method workers of the company (15 class hours), the project department (15 class hours) and the "three-level" safety education team (20 class hours) entered the operation post after passing the examination.
3, must carry out specific and targeted safety education.
4. Enterprise security personnel who are waiting for posts or changing jobs must receive no less than 20 hours of safety training, and educate the new types of work safety in this industry.
5. Enterprise employees receive safety training. The annual training time of the legal representative and project manager is not less than 30 hours, the complete training time of safety management personnel and special operations personnel is not less than 40 hours, and the training time is not less than 20 hours, which is organized by the registered enterprise or the local project construction administrative department; Other management personnel should have no less than 20 class hours. 12 enterprises can organize training by themselves, and 34 enterprises should entrust training.
6, full-time security personnel must hold relevant certificates, the enterprise annual training and assessment, the operation shall not be unqualified.
(7) Safety activities before shift
1, a shift safety system team should be set up at the construction site.
2. The team should conduct a one-month one-level three-post (post reporter, post education checkpoint) and class laid-off inspection, and make safety opinions.
3. The shift activities, inspection and evaluation activities should be recorded and evaluated.
Special work certificate
1 The construction site must be equipped with special operators and small and medium-sized machine operators, and a roster of special operators and small and medium-sized machine operators must be established.
2. Special operations personnel must go through the training and assessment of relevant departments, and review the business license as required, and shall not be postponed.
3. Small and medium-sized machine operators must be trained, 12 organized by themselves, commissioned by 34 enterprises, and certified by construction administrative departments at all levels.
4, special operations personnel, change the work unit must go through the transfer procedures, and conclude a labor contract with the employer.
(9) Handling accidents
1, implement the system of reporting industrial accidents on a regular basis and record them on the construction site. File-building accident did not cause any casualties, so the notes required in the Monthly Casualty Report were filled in, and the approval seal of the company's safety management department was stamped on the casualty report.
2. Casualty traffic accidents must be reported in accordance with the regulations, and the principle of "four misses" (the cause of the accident is unclear, the person responsible for the accident and the masses are not educated, and the preventive measures are not implemented) should be dealt with seriously.
(10) Safety signs
The construction site should have safety signs and layout.
2. Safety signs should be hung on the map, which is the main construction site, and safety signs should be hung on the operating points, dangerous areas and main access points.
3. Construction machinery and equipment shall be equipped with safety program cards and randomly suspended.
4. All kinds of safety signs should meet the requirements of national safety signs (GB2894-82), and be beautifully made and unified.
Civilization construction
(1) Field enclosure
1, the construction site must implement closed construction enclosure and set it continuously near the construction site. The requirements for enclosure materials are firm, stable, uniform, neat and beautiful, and hard materials should be used. Such as bricks or hollow bricks or colored steel plates, shall not be colored cloth or bamboo pieces. Bricks and hollow bricks are used as enclosure materials to beautify the walls.
2. The fence height of main roads in urban areas and other venues involving urban festivals shall not be less than 2.5m, and the fence height of other venues shall not be less than1.8m.
(2) Closed management
The entrance of the management center must be closed at the construction site, a preventive system should be established, and the registration system for foreign investors should be strictly implemented. The guard duty room should be located at one side of the door.
2. For the visual recognition of door enterprises, the door should be made of rigid materials, and strive to be beautiful and generous, which can lock fragile and fragile materials such as bamboo ballet.
3. Workers entering the construction site must wear work permits. construction site
(3), the construction site should actively promote the hard floor construction work, the main road ground in the living area must have a certain thickness of concrete hardening, and other road ground should also be hardened.
2. The road on the construction site shall be smooth, clean and dust-free.
3, the construction site drainage system, drainage unblocked, no water.
4. Non-mud, sewage and wastewater flow out or block sewers and drains.
5. Set up appropriate places in the smoking business area on the construction site, and prohibit smoking at will.
6, actively beautify the construction site environment, according to different seasons, green layout, correct behavior.
Stacking of materials
1, materials, spare parts, materials and the general plan of the construction site shall be stacked reasonably.
2, building materials, structures, equipment and tools and other materials must be safely stacked (stored) neatly, not super high. When stacking materials, unified signs and signs should be hung, indicating the names of varieties, specifications and quantities.
3. Establish a material receiving and dispatching management system, keep warehouses, tools and materials neatly stacked, classify inflammable and explosive materials and set up a person in charge to ensure safety.
4. Create a site cleaning system serving the people. After the work is completed, the materials and site shall be cleaned, and the vehicles entering and leaving the country shall take measures to prevent the mud from being brought out. Construction waste should be removed in time, and temporary storage places should be neatly stacked and listed. No construction machinery and equipment, should be timely appearance.
(5) On-site accommodation
The construction site needs to be built on the basis of the staff dormitory. Dormitories should be centralized and unified, and kitchens and business areas are strictly prohibited.
2. The construction site, office area and living area in the operation area must be different. The narrow space cannot be divided, and there are reliable fence nursing measures.
3, the dormitory should be warm, refreshing, prevent gas poisoning, prevent mosquito bites.
4. All parties should ensure the structural safety and the main facilities are in good condition. It is forbidden to build steel pipes, bamboo and bamboo dormitories in simple sheds, and the height of activity rooms should not exceed two floors.
5. The dormitory director's health management system and dormitory table are posted on the wall. The dormitory should have uniform beds and lockers, and the room should be ventilated. Clean household items should be neatly stacked, and labor tools are prohibited.
6, dormitory (including duty room), do not use gas stoves, kerosene stoves, rice cookers, water heaters, rice cookers, cookers and other household appliances.
7. dormitory week
- Related articles
- Shanghai bailang network technology co., ltd. recruitment information, how about Shanghai bailang network technology co., ltd.
- What time does Zhanjiang kindergarten open
- What is the address of Taizhou International Jinling Hotel?
- 20 18 Announcement of Teacher Recruitment in Shangsi County, Fangchenggang City, Guangxi
- Is there no electrician on duty in the property at night?
- What's the telephone number of pomegranate real estate group co., ltd?
- What is the written test content of institutions directly under Foshan City in Guangdong Province in 2020?
- In Sarazzi, Inner Mongolia, which department should report the arrears of wages for migrant workers and refuse to open funds for half a year, not because the unit has no money, but because it maliciou
- How about Shenzhen Guanghai Human Resources Co., Ltd.?
- Zhejiang Tongji Vocational College of Science and Technology announced the open recruitment of 26 people in the second half of 2022 (the first batch)