Job Recruitment Website - Recruitment portal - Hou Ma went to Beijing to inquire about the train timetable.

Hou Ma went to Beijing to inquire about the train timetable.

The timetable for the high-speed train from Houma to Beijing is as follows:

1, G622: Beijing Houmaxi to Fengtai, 08:35- 14:06, taking 5 hours 3 1 minute.

2.K604: Houmaxi to Fengtai, Beijing, 13:43-05: 10, 15 hours and 27 minutes.

3.G626: Houmaxi to Fengtai, Beijing, 14:48-20:06, 5 hours 18 minutes.

4.K6 10: From Houmaxi to Fengtai, Beijing, the time is 16:22-05: 10 and the time is 12 hours and 48 minutes.

Houmaxi Railway Station, located in houma city, Linfen City, Shanxi Province, China, is the secondary station under the jurisdiction of China Railway Taiyuan Bureau Group Co., Ltd. (formerly taiyuan railway administration) and the intermediate station of Daxi High-speed Railway. It has two platforms and four lanes, including two main lines and two reserved lanes.

Daxi Passenger Dedicated Line passes through houma city Ma Shang Office and Gaocun Township, and sets up a station in Gaocun Township, houma city. The total construction area is 4743㎡ (the station building area is 4000㎡, others are 743㎡).

Houma West Station Expansion and Reconstruction Project

This project is a necessary supporting project for the reconstruction, connection and reconstruction of existing station buildings. The renovation and renovation area of the existing station building is 692㎡, and the new station building is located on the landlord side of the existing station building, with a total construction area of 12645.438+06 ㎡. Among them, the newly-built station building is 909 1.36m2, the newly-built weather corridor outside the station building is 1 157.3m2, the underground corridor is 1590.33m2, the entrance corridor is 683.74m2, and the entrance awning is122.43m2.

The expansion project of Houma West Station of Daxi High-speed Railway is implemented in two phases. The first stage is the transition project of station housing reform and expansion. After it is put into use, the second phase square and its surrounding traffic and supporting facilities will be built. In order to further improve the service function of Houma West Railway Station and facilitate passengers to travel conveniently, comfortably and efficiently, China Railway Design Group Co., Ltd. has carefully studied, comprehensively analyzed and scientifically designed it, and plans to adjust the functional layout of the station building and increase the travel service area by 257㎡.