The project started in April 1957, and the 1 unit generated electricity in April 1960. The total installed capacity of the power station is 662.5 MW, the guaranteed output is 178 MW, and the average annual power generation for many years is18.6 billion kWh. The power station is mainly responsible for peak regulation, frequency modulation and emergency standby of East China Power Grid, and has comprehensive benefits such as flood control, irrigation, shipping and aquaculture.
Extended data:
Xin 'anjiang Dam Hub consists of dam, overflow powerhouse, switch station and flood discharge structure. The dam is a concrete gravity dam with wide joints. The dam body is divided into 26 dam sections with a length of 466.5 meters. No.0 to No.3 and No.24 to No.25 dam sections are solid gravity dams, and only one side of No.4 and No.23 dam sections has wide joints. Dam crest elevation 1 15m, maximum dam height 105m, maximum bottom width 93.664m, dam crest width of water retaining section 8.5m, dam crest width of overflow section 38.7m ... dam concrete 654.38+03,800 m3.
- Previous article:How does Changle Shi Sheng Thermal Power Company go to work?
- Next article:Questions about Yum! Reserve Manager! Brand group
- Related articles
- Xing'an League Zalaite Banner's Notice on the Return of Returning Hometown Students from Relevant Colleges and Universities in Hohhot City
- The latest news of 2020 Taian Expressway road closure
- Samsung TV after-sales maintenance telephone
- Shanghai Xin Ying Liquor Co., Ltd. Recruitment information, how about Shanghai Xin Ying Liquor Co., Ltd.
- Postdoctoral treatment in Zhongnan Hospital of Wuhan University
- Did Suichang Tom Garden close down?
- Are the outpatient nurses in Puyang Oilfield Hospital regular employees?
- How about Qingyuan Postal Service?
- Where can I buy Kung Fu Pear Laiyang Pure Pear Paste? I heard that this thing is very effective in treating cough.
- The day I became a Shahe person in Shude experiment.