Job Recruitment Website - Recruitment portal - What is a building gusset?
What is a building gusset?
Welding connection mainly uses embedded parts for welding. Before welding, a trial welding should be carried out, and welding can only be carried out after the test is qualified. Because the galvanized protective film of the corner plate is damaged by welding, it is appropriate to produce a gap between the corner plate and the embedded parts, so rust prevention and sealing of the gap should be carried out after welding.
The expansion bolt connection meets the design requirements because of the physical pull-out test on site first; When drilling, the drilling rig should be kept horizontal and vertical, and the dust and sand in the hole should be blown out by wind; The inner expansion liner and the inner expansion pin must be fully expanded; After the bolt is screwed in, try to resist the internal expansion pin. If there is any gap, fill it with glue. Bolts, fixed angle steel, flat pads and spring washers must be flattened, so that the angle steel is close to the structural layer, and the screws are fixed with resin glue to prevent loosening; When the connector is connected with the fixed angle steel, it must be tightened after adjustment, and the nut is fixed with resin glue to prevent loosening; Check and accept the construction of internal expansion pin, conduct spot checks and tests at any time, and make hidden records.
Quality control of stone flat-fell seam construction
According to the treatment method of stone flat-fell seam, one is that the plates are naturally connected without leaving seams. The disadvantage of this method is that it is easy to limit the thermal expansion and cold contraction of plates due to temperature difference, so it is not suitable for extensive use in external walls; Second, take off the seam, the plate gap is generally 6~ 10mm, which is generally evenly filled with foam rubber strip and sealed with weather-resistant silicone adhesive.
The caulking agent has a warranty and various indicators; Before caulking, the stone should be treated according to the joint, and the dirt and dust on the wall should be blown off with an air compressor; Fill the inner side of the plate with foam plastic strips, and the depth of pressing should be uniform according to the depth of joint filling, and the number of pressed joints should not be too loose, so as to control the depth of joint filling; When caulking, be sure to stick tape paper at the joint to prevent the joint from polluting the stone surface; When caulking, the caulking agent must be continuous, dense and full. It is forbidden to cut corners and fill them in according to regulations to prevent water seepage. Should be specially equipped with quality personnel for joint inspection, and make hidden records.
- Previous article:How about Guo Ming Jingwei (Tianjin) Business Consulting Co., Ltd.
- Next article:Is there a long-day factory nearby?
- Related articles
- What are the advantages of Ce Shen data?
- How about Shenzhen Qian Hai Airport cross-border electronic commerce Technology Co., Ltd.
- Why do Internet cafes recruit webmasters every day?
- What company is Heng Chang?
- Where is the largest Maitreya Buddha in China?
- Wuhu city has several districts and counties under its jurisdiction.
- How does Fangshan Personnel Testing Center cancel its account?
- Which pharmaceutical companies in Nantong are better?
- 20 15 Jiangsu Nanjing teacher recruitment, "Nanjing student, not 2 1 1, not a teacher, has obtained the teacher qualification certificate", can I apply for it?
- 2022 Neijiang City institutions written test results query