Job Recruitment Website - Recruitment portal - What language does nuclear power need?
What language does nuclear power need?
Campus recruitment information of Jiangsu Nuclear Power Co., Ltd. (as of: 2008. 12. 10)
Release date of Polaris Electric Power Talent Network: 2008-12-1/kloc-0: 27: 38 (read 229 1 time)
Keywords: electric power campus recruitment, nuclear power recruitment, latest electric power recruitment
Jiangsu Nuclear Power Co., Ltd. was established in19971Feb. 8 18, and was established by CNNC Nuclear Power Co., Ltd., China Power Investment Nuclear Power Co., Ltd. and Jiangsu Guo Xin Asset Management Group Co., Ltd. at the ratio of 50%, 30% and 20% respectively. The company operates according to the modern enterprise system. As the project owner, he is responsible for the construction management and commercial operation of Tianwan Nuclear Power Station after its completion.
Tianwan Nuclear Power Station is located in Tianwan, Lianyun District, Lianyungang City, Jiangsu Province. The plant plans to build an 8 million kilowatt PWR nuclear power unit. The construction of two Russian AES-9 1 PWR nuclear power units with a single unit capacity of10.06 million kilowatts in the first phase of the project is a high-tech cooperation between China and Russia in the field of nuclear energy under the impetus of deepening political mutual trust, developing economic and trade and strengthening international strategic cooperation, and it is the largest technical and economic cooperation project between China and Russia so far. The design life of the unit is 40 years, the annual average load rate is not less than 80%, and the annual power generation is 65.438+0.4 billion kWh. AES-9 1 PWR nuclear power unit is an improved design made by Russia on the basis of summarizing the design, construction and operation experience of 20 million kW VVER unit. In order to improve the safety of the unit, a series of important measures have been taken, including four channels of safety system, core melt catcher, all-digital instrument and control system, and double containment of reactor building. Its safety design is superior to that of most PWR nuclear power plants currently operating in the world, and it has reached the international level of the third generation nuclear power plants in some aspects.
The first phase of Tianwan Nuclear Power Station started construction on 1999 1 20 October, and units12 were put into commercial operation on May 7 and August 6, 2007 respectively. 1 2 units have maintained continuous, safe and reliable power operation since they were put into commercial operation. No reactor shutdown or accident occurred, radiation protection measures were effective, individual and collective doses were effectively controlled, the discharge of three wastes was far below the national control standard, and the performance index of the unit was excellent, which created good operating performance and social benefits.
On March 24th, 2006, the executive meeting of the State Council reviewed and approved in principle the Medium-and Long-Term Development Plan of Nuclear Power (2005-2020), and the development policy of nuclear power was adjusted from "moderate development" to "active promotion". By 2020, China's total installed power capacity will reach 900 million ~ 654.38+0 billion kilowatts, and the installed nuclear power capacity will reach 40 million kilowatts. By then, nuclear power will account for about 4% of the country's total installed capacity and 6% of the country's total power generation. According to this plan, in the next 15 years, China will add more than 30 million kilowatts of nuclear power installed capacity and build more than 30 new nuclear power plants, that is, two nuclear power units will be built and put into operation every year on average.
According to the national nuclear power development plan, combined with the company's development strategic objectives and the local development plans of Jiangsu Province and Lianyungang City, while ensuring the safe and reliable operation of two units in the first phase of the project, the company comprehensively carried out the preliminary preparation and project planning for the Tianwan nuclear power plant expansion project (Units 3 and 4) and the third and fourth phases of the project (Units 5-8), and achieved phased results.
China's nuclear power industry is facing unprecedented development opportunities, and Jiangsu's nuclear power has embarked on the fast track of sustainable development. Tianwan team sincerely expects young and passionate you to join us, * * * practice your career ideals and work together to create a bright future for Jiangsu nuclear power.
Recruitment position and requirements:
4-8 nuclear power plant operation site operators: undergraduate, male, majoring in nuclear engineering and nuclear technology or thermal energy engineering, foreign language level above 425, English and Russian are not limited, healthy and willing to work shifts.
Jiangsu Nuclear Power Co., Ltd. Recruitment Plan
(Southeast University)
Recruitment position:
Technical Support Office-Vibration Monitoring Engineer: 1, bachelor or master, majoring in engineering mechanics.
Procurement Supervision Office-Project Procurement Management Engineer: 65,438+0, bachelor degree, majoring in thermal energy and power engineering, with CET-6 requirement of 425 or above.
Information Center-Application System Development Engineer: 1, undergraduate, majoring in computer science and technology.
Requirements:
Serious and rigorous, strong execution, team spirit.
More than 425 points in CET-4
There are no make-up exam subjects for professional basic courses during college.
Treatment:
Undergraduate internship lasts for one year, during which the monthly salary is 3000-3500 yuan (excluding social security accumulation fund). Sign a five-year labor contract one year later, with a monthly salary of 4,000-4,500 yuan (excluding social security accumulation fund). Working for three years, the annual salary is more than 654.38+10,000 yuan.
Recruitment arrangement:
Interested students please send their resumes to :hr@jnpc.com.cn. Deadline: June 5438+February 2008 10. The company will go to Nanjing for an interview in the near future, and the specific time will be notified by phone.
Requirements:
1. Please unify the email title: application ×××× (position name)
For example, apply for vibration monitoring engineer.
2. Please provide relevant certificates, transcripts and school recommendation forms in your resume (all copies), and attach a photo of your life if it is convenient.
- Previous article:Is Qingdao Shuangxing Tire Industry Co., Ltd. a state-owned enterprise?
- Next article:How to sign up for Siping Health School
- Related articles
- Teacher access and ability standards?
- What about Ruifu Technology (Zhuhai) Co., Ltd.?
- How many people will be recruited by Lhasa Water Conservancy Project Construction Management Center and institutions in 2023?
- How long does it take from Quanzhou to Langfang Jingdong Express?
- Rizhao 20 12 job fair
- What are the requirements for working in Japan?
- How about Le Anzhu (Shenzhen) Home Furnishing Co., Ltd.?
- Why do some shops want to recruit students to work?
- Introduction of Hechuan Railway Station Construction Project?
- Download the recruitment position table of Qiannan Prefecture in Guizhou in 2020.