Job Recruitment Website - Recruitment portal - Asphalt mixing station for the record Asphalt mixing station for the record.

Asphalt mixing station for the record Asphalt mixing station for the record.

What is the process of opening an account for spot asphalt?

Spot asphalt account opening process:

1. Investors provide the information needed to open an account, and entrust members to open an account for you free of charge.

2. Investors should submit the originals and photocopies of relevant materials to the comprehensive members, take photos on the spot, read and sign the account opening text.

3. Information that investors need to submit when handling account opening procedures. Remarks: Individual investors: scanned ID card and bank card (mainly these two materials).

4. Relevant texts include: customer application form, agreement and risk warning.

5. Comprehensive members shall be numbered in the business system according to the uniform coding rules of the Exchange, and open trading accounts for investors.

6. The Exchange records and reviews customer information.

7. Investors log on to the electronic trading platform of the Exchange and modify the login trading password.

8. Investors sign online contracts through online banking.

Is the procedure of asphalt mixing station difficult?

This is not easy to handle.

You need to apply for an industrial and commercial business license, and you also need to apply for environmental assessment approval. The Environmental Protection Bureau will put on record, provide technical data for the equipment, and get approval. Technical Supervision Bureau passed the inspection, and so did Environmental Protection Bureau and Safety Supervision Bureau.

Asphalt mixing station can also be called asphalt concrete mixing station and asphalt concrete mixing station. Refers to the complete set of equipment used for mass production of asphalt concrete.

What are the procedures for the laboratory of the building quality supervision station?

The first step is to carry out site renovation, equipment purchase, equipment installation, debugging, measurement verification and so on. And make preparations for the establishment and trial operation of the site, equipment, personnel and quality system, and register for industry and commerce and taxation.

Step 2: Apply for laboratory qualification certification (commonly known as CMA measurement certification) from the Certification and Supervision Department of the Technical Supervision Bureau at or above the provincial level, and prepare for on-site review-on-site review-rectification-completion of rectification-and obtain the measurement certificate.

Step 3: Apply to the competent department at or above the provincial level for qualification administrative license or laboratory qualification evaluation (the Ministry of Construction calls it qualification administrative license, and the laboratory qualification of the transportation industry of the Communications Department depends on which industry you belong to)-obtain the qualification certificate through the evaluation of the provincial competent department.

Step 4: If the local prefecture-level city authorities have filing requirements, they must apply to the local authorities for filing, and they can start business only after the filing is approved.