Job Recruitment Website - Social security inquiry - How to transfer social security from Nanjing to Shanghai

How to transfer social security from Nanjing to Shanghai

Legal analysis:

1. Offices: Xuzhou Railway Office, Hefei Railway Office, Nanjing Railway Office and Hangzhou Railway Office.

2. Transport depots: Xuzhou Depot, Huaibei Depot, Hefei Depot, Xinchang Depot, Wuhu Depot, Jiaxing Depot, Jinhua Depot and Ningbo Depot.

3. Directly affiliated stations: Xuzhou Station, Xuzhou North Station, Bengbu Station, Hefei Station, Huainan West Station, Fuyang North Station, Nanjing Station, nanjing east railway station, Wuhu East Station, Zhenjiang Station, changzhou railway station, Shanghai Station, Wuxi Station, Suzhou Station, Nanxiang Station, Hangzhou Station and Qiaosi Station.

4. Freight Centers: Xuzhou Freight Center, Hefei Freight Center, Huainan Freight Center, Bengbu Freight Center, Wuhu Freight Center, Nanjing Freight Center, Shanghai Freight Center, Hangzhou Freight Center and Jinhua Freight Center.

5. Locomotive Depot: Xuzhou Locomotive Depot, Hefei Locomotive Depot, Nanjing East Locomotive Depot, Shanghai Locomotive Depot, Shanghai Locomotive Depot and Hangzhou Locomotive Depot.

6. Power supply section: Xuzhou power supply section, Hefei power supply section, Nanjing power supply section and Hangzhou power supply section.

7. Depot: Hefei Depot, Nanjing EMU Depot, Nanjing East Depot, Shanghai EMU Depot, Shanghai Depot and Hangzhou North Depot.

8. Passenger Transport Section: Hefei Passenger Transport Section, Nanjing Passenger Transport Section, Shanghai Passenger Transport Section and Hangzhou Passenger Transport Section.

9. Works Section: Xuzhou Works Section, Bengbu Works Section, Hefei Works Section, Fuyang Works Section, Xinchang Works Section, Wuhu Works Section, Nanjing Bridge Works Section, Shanghai Works Section, Shanghai Overhaul Works Section, Hangzhou Works Section and Ningbo Works Section.

10, telecom segments: Xuzhou telecom segment, Hefei telecom segment, Nanjing telecom segment, Shanghai telecom segment and Hangzhou telecom segment.

1 1. Communication segment: Shanghai communication segment.

12. Maintenance and overhaul section: Shanghai Daji Operation and Maintenance Section and Shanghai High-speed Railway Maintenance Section.

13, building sections: Xuzhou building section, Hefei building section, Nanjing building section, Shanghai building section and Hangzhou building section.

14. Vocational training bases: Xuzhou Vocational Training Base, Bengbu Vocational Training Base, Nanjing Vocational Training Base, Shanghai Vocational Training Base and Hangzhou Vocational Training Base.

15, Health Supervision Institute/CDC: Shanghai Railway Health Supervision Institute, Bengbu CDC, Nanjing CDC, Shanghai CDC and Hangzhou CDC.

16, engineering headquarters: Xuzhou hub headquarters, Hefei hub headquarters, Nanjing hub headquarters, Shanghai hub headquarters and Hangzhou hub headquarters.

Legal basis:

Decision on several issues concerning the reform of capital construction management system

From1October, 65438+65438 0985+ 1, infrastructure departments were established in Bengbu, Nanjing, Shanghai, Hangzhou and Fuzhou railway sub-bureaus, and infrastructure departments were still established in yingtan and Nanchang railway sub-bureaus, all of which are functional departments of railway sub-bureaus. Shanghai Railway Bureau Engineering Company, Nanchang Engineering Office and Fuzhou Railway Engineering Headquarters were renamed Shanghai Railway Engineering Corporation, Nanchang Railway Engineering Corporation and Fuzhou Railway Engineering Corporation, all of which were directly led by the Railway Bureau. Nanchang Survey and Design Institute and Fuzhou Survey and Design Institute, which belonged to the former Nanchang Engineering Office and Fuzhou Railway Engineering Command, were renamed as Nanchang Survey and Design Institute and Fuzhou Survey and Design Institute of Shanghai Railway Bureau, and were directly led by the Railway Bureau. The railway administration abolished the collective enterprise management office and set up a diversified management office.

1986 the infrastructure committee of the railway bureau was established and the Ministry of Infrastructure was abolished. Nanchang and yingtan Railway Sub-bureaus were established. In June 65438+in the same year 10, yingtan branch was cancelled and merged into Nanchang branch. 5438+065438+ 10 Implement the spirit of the East China Railway Construction Conference chaired by Vice Premier Wan Li of the State Council, strengthen the work of the Railway Bureau Foundation Construction Committee, and set up an office, technical department, comprehensive construction department and planned economy department.

1987, focusing on the adjustment of educational and health institutions. The Education and Health Committee was established, and the Education Department and the Health and Environmental Protection Department were abolished. Education and Health Committee is the centralized management department of education and health work of Shanghai Railway Bureau, with dual functions and powers. Cancel the real estate construction department and inspection room, and change the multi-economic department into the multi-economic department.

1In July, 988, the Economic Development Corporation of Shanghai Railway Bureau was established. It is an economic entity with legal personality, in charge of overall diversified operations and collective economic work, and has dual functions and powers. To lead the diversified enterprises of China Railway Foreign Service Company, such as Shanghai Branch, Tourism Corporation, Art Advertising Company and Comprehensive Service Company, provide business guidance to the diversified operations and collective economic work of the Railway Bureau, and be responsible for organization, coordination, supervision and inspection.

1989 according to the enterprise law and the implementation opinions on the reform of the political work system of the railway bureau, the political department of the railway bureau was abolished, and the propaganda department of the political department, the veterans department and the railway newspaper were placed under the administrative establishment, and then under the leadership of the party Committee of the railway bureau. The cadre department of the Party Committee of the Railway Bureau was renamed as the cadre department, and the cadre department of the Railway Bureau was renamed as the personnel department. There are two brands in one institution, the Party Committee and the leaders of the Railway Bureau.

1August, 990, in accordance with the central government's policy of rectifying and deepening reform and the principle of streamlining, unification and efficiency, the railway administration set up 27 departments, offices and sections, including office of chief engineer, enterprise management office, foreign affairs office, science and technology commission and safety supervision commission. Transportation, freight transport, passenger transport, maintenance, vehicles, public works, electric power, material management, planning and statistics, finance, labor wages, personnel, supervision, auditing, housing construction and living quarters, People's Armed Forces Department (combat readiness office), directly under the authority Public Security Department, Capital Construction Committee, Education and Health Committee, Economic Development Corporation (diversified business office) and collective economic management office. The railway administration has six sub-bureaus in Bengbu, Nanjing, Shanghai, Hangzhou, Nanchang and Fuzhou, three engineering corporations in Shanghai, Nanchang and Fuzhou, and the industrial company of the railway administration, with a large unit of *** 10. Jurisdiction business line 5561.8km.