Memorabilia of the Development of Qinshui Lan Yan Coalbed Methane Co., Ltd. of Jinmei Group

By the end of 2006, Blue Flame CBM Company had drilled 450 wells, operated 46 CBM wells/KLOC-0, and produced 500,000 cubic meters of gas per day.

On June 28th, 2006,165438+1October 28th, with the joint efforts of cadres and workers of coalbed methane company for more than 50 days, Sihe compression station, the largest coalbed methane compression station in China, was built, with a daily compression capacity of 250,000 cubic meters/day, and the highest can reach 270,000 cubic meters/day. So far, the CBM production capacity of Qinshui Blue Flame CBM Company has reached more than 300,000 cubic meters/day.

On September 8, 2006, The Politburo Standing Committee (PSC) of the Communist Party of China and Zeng Qinghong, Vice President of the State, inspected the CBM filling station of Jincheng Coal Industry Group, and fully affirmed the achievements made by the Group in the development and utilization of CBM.

From June 26th to June 22nd, 2006, the national on-site meeting on coal mine gas control and utilization was held in Jincheng. Hua Jianmin, State Councilor and Secretary-General of the State Council, Zhang, Director of the National Development and Reform Commission, and Li, Director of the State Administration of Work Safety, led the tour to Qinshui Coalbed Methane Co., Ltd. to inspect the gas control and utilization of Jinmei Group.

In April, 2006, Jinmei Group signed a contract with the "four academies" to open the Industry-University-Research base of coalbed methane development project, which was held in Jinmei Group.

By the end of 2005, Qinshui Blue Flame Coalbed Methane Co., Ltd. had drilled 175 wells, put into production 100 wells, and produced daily gas160,000 cubic meters.

On June165438+1October 19, 2005, CCTV's "Focus Interview" program reported the development and utilization of coalbed methane in Jincheng Coal Industry Group, which aroused strong repercussions from all walks of life.

From June 5th to1October 7th, 2005, the ground gas drainage project in Chengzhuang was officially started. Since then, Qinshui Blue Flame CBM has successively established Panyi Work Area, Pan Er Work Area, Chengzhuang Work Area, Hudi Work Area and Zheng Zhuang Work Area.

In June, 2005, 5438+ 10, panzhuang coalbed methane compression station was rebuilt and expanded for the first time and the second time, which made the daily compression capacity reach160,000 cubic meters/day, ensured the gas supply for nearly 1000,000 people in the world, and also provided nearly 1000 for Jincheng City and surrounding cities such as Zhengzhou and Taiyuan.

In June 2004, the construction of 100 coalbed methane wells in Sihe mining area started.

In June, 2004, SH-3 CBM well produced gas by self-injection after several days of fracturing, which is very rare in CBM field.

From September 2003 to the end of 2004, 30 CBM wells were constructed in panzhuang.

At the end of 2003, the newly established Qinshui Lanyan Coal Bed Methane Co., Ltd. built a coal bed methane compression station with a daily compression capacity of 20,000 cubic meters on the basis of repairing seven coal bed methane test wells of the former Jindan Company, and began to test gas supply to more than 0/00 households in Gushuyuan Mine.

On August 16, 2003, Qinshui Blue Flame Coalbed Methane Co., Ltd. was established. CBM Company undertakes the extraction and utilization of surface CBM in Jincheng Coal Industry Group.