Job Recruitment Website - Zhaopincom - Operating procedure of plate bending machine
Operating procedure of plate bending machine
2, the operator must be familiar with the structure, performance and usage of the plate bending machine, with the consent of the responsible management personnel, before operation.
3, carefully check whether the safety device is in good condition before starting.
4, when running, it is forbidden to put hands and feet on the roller and transmission parts and workpieces.
5. After the work is interrupted, the clutch should be placed in neutral.
6, many people work together must have a specialist command.
7, it is forbidden to overload work.
8. The tilt reset of the upper roller lifting and overturning bearing and the balance of the upper roller should be carried out after the main drive stops.
9. It is forbidden to pile up workpieces and sundries in the workplace to keep the machine tool and the site clean.
10, after the operation, cut off the power supply and lock the power box. 1, according to the provisions of the machine lubrication diagram, according to the requirements of oil cup lubrication and manual lubrication.
2. Roll the plate according to the parameters specified by the plate bending machine, with a thickness of 20mm and a maximum length of 2500mm, and the yield limit of the rolled plate is less than 250Mpa.
3. After turning on the power supply, move the lower roller up and down and the upper roller up and down, and check whether there is any abnormal jamming in each movement.
4. Strictly follow the plate rolling process and operation method, and pay great attention to the safe operation of the equipment when the upper roller is lifted to the limit position.
5. When the main drive stops, the upper roller can be lifted, and the tilting reset of the tilting bearing and the tilting of the upper roller can be carried out.
6, in the process of operation, if found to have irregular noise, impact and other abnormal phenomena, should immediately stop for inspection.
7, in the operation of the personnel should coordinate with each other, listen to the command of the head of the plate rolling, no password, it is forbidden to start the machine.
8. Pay great attention to the hand being pressed by the steel plate, and roll it in with the steel plate when rolling the plate.
9. Be careful not to collide with the machine when lifting the steel plate or steel drum with the crane.
After the plate rolling, clean up the finished materials, maintain the equipment and turn off the power in time.
Matters needing attention
1. Clean the parts of the plate bending machine, especially the joints;
2. When assembling the plate bending machine, the principle of from inside to outside, first down and then up should be followed;
3. When assembling, priority should be given to assembly with the same fixture or assembly in the same direction;
4. During the assembly process, transfer shall be carried out in strict accordance with the design drawings, and the dimensions and specifications shall be strictly controlled.
- Previous article:What about Xiangyang aibeijia cake co., ltd?
- Next article:What about Dalian Days Jewelry Co., Ltd.?
- Related articles
- Grading standard of seven auxiliary police officers in Chongqing
- 202 1 Interview Time of Recruitment Street and Rural Career Preparation Examination in Shuangcheng District of Harbin
- Excuse me, which one is good for orthodontics in Wuxi? What corrective methods are better?
- Introduction of Yichang Qiancheng Logistics Co., Ltd.?
- If you want to be an English teacher in a primary school, what should a teacher take for the exam?
- Is Dongying Xinfa Pharmaceutical Factory good?
- Is there a training class for scaffolders in Korla?
- Shijiazhuang Housing and Construction Bureau: Accelerating the Work of Assembled Buildings
- What are the casting methods of steel ingots (casting process of smelting steel ingots)
- That factory in Xinghe county, Wulanchabu city is going to recruit people.