Tianjin all-inclusive decoration company telephone

All-inclusive decoration company Tel: 0 10-65726677.

The telephone number of the all-inclusive integrated home experience hall (Beijing East Fifth Ring Store) is 0 10-65726677.

All-inclusive decoration includes measurement room design, wall demolition, water and electricity warm laying, bricklayer, carpenter, oilman, partition, kitchen and bathroom ceiling, wall and floor tile laying and post-decoration works.

The most important thing in the preliminary decoration work is to measure the design of the house. Many people don't pay much attention. They think it is wrong to be optimistic while loading. If you don't plan well in the early stage, you will wait for frequent rework and budget increase in the later stage, but if the early stage design is completed, you only need to go to the site to see the key links in the later stage.

It is also important to tear down the wall and lay water, electricity and heating, because other parts can be adjusted according to local changes in the later stage, but once these two parts are changed, it is basically equivalent to starting over.

Among them, wall demolition and construction are two main parts. First, be careful not to move the shear wall or load-bearing wall when dismantling. Second, try to divide the wall into two days, otherwise the cement will dry and it will be prone to skew. The water and electricity heating part mainly focuses on how many square lines are needed, the distance between hot and cold water pipes and the position of socket switch.

There are many matters needing attention in bricklayer, carpenter and oiler. For example, the direction of waterway and electric pipe depends on whether it is flat, whether the electric pipe of kitchen and bathroom is on the top surface, whether it is fixed with pipe clips as required, whether the color separation of electric pipe and wire is correct, and whether the hot and cold nozzles of waterway are flush. After the completion of the hydropower project, bricklayers and oil workers formally entered the site.

The bricklayer's technology mainly checks the hollowing rate of ceramic tiles, the smoothness of paving, the height difference of joints, and whether the slope of the area with drainage requirements is qualified. Oil workers mainly look at the flatness of the wall, whether there are trachoma, depression, uniform grinding and so on.

When installing the kitchen ceiling, we should pay attention to the correctness of the order. Generally, the hose of the range hood should be fixed with the flue first, and then the position of the range hood should be determined. Like kitchen lamps, you need to prepare them first, and then install them after the ceiling installation is completed.

After the mid-term acceptance, the construction of wall latex paint will begin. Mid-term acceptance is a very important decoration node. All-inclusive construction has established a strict quality inspection system, and strictly inspected 12 categories and 126 detail control points.

The first is the installation of main materials such as cabinets, sanitary wares and switch panels, and the last is the installation of wooden floors, wooden doors and cabinets. The installation sequence of cabinets is generally: ground cabinets-hanging cabinets-countertops-door panels-decorative components-partitions-hardware handles.

For this product assembled on site, the skill of the installer is very important. Whether each board can be aligned and punched accurately requires extreme care.