Job Recruitment Website - Zhaopincom - When will the admission results of the second batch of State Grid be announced?
When will the admission results of the second batch of State Grid be announced?
June 26, 2023. According to the announcement issued by the State Grid in 2023, the first batch of the National Grid's score lines will be announced on April 20, 2023, and the second batch will be on June 26, 2023. State Grid Corporation of China was established on December 29, 2002. It is a state-authorized investment institution approved by the State Council and a pilot unit of a state-controlled company.
The specific recruitment is:
(1) Advance approval (school recruitment)
From mid-to-late September to mid-December 2021, each power company will announce the recruitment of colleges and universities Graduate campus (on-site) job fair announcements, notices, written examinations, interviews, etc. At the same time, in late September, State Grid will release the examination syllabus and reference question bank on corporate culture and energy strategy.
(2) The first batch (unified recruitment)
From early to mid-December 2021 to mid-to-late January 2022, each power company will release the first batch of job fairs for college graduates Announcements, notices, written tests, interviews, etc. The first batch of 2022 recruitment list will be announced on March 14, 2022.
(3) Second Batch (Unified Recruitment)
From June 24, 2022 to mid-July 2022, each power company will release the second batch of job fair announcements for college graduates, Notification, written examination, interview, transfer, etc. The announcement time for the second batch of recruitment lists in 2022 is: August 5-August 9, 2022.
1. Notification time of online application results
The specific time and form of notification of online application results will be stated in the qualification review announcement. Most provinces notify in two batches. The first The first batch is usually announced at noon on June 25, and the second batch is notified around 20:00 on June 27, so students can focus on these two time points.
Judging from the announcement contents of 27 provinces across the country, the provinces with only one online application notice are: Gansu, Henan, Hunan, Jiangxi, Liaoning, Qinghai, Shanxi, and Tibet. Among them, Henan Province has not clearly announced the notification time, and the results will be sent via text messages and in-site messages.
Finally, everyone needs to pay attention to the fact that after receiving the online application results, you must go to the online application platform for examination confirmation as soon as possible. Failure to confirm will be deemed as giving up the examination qualification. In addition, online application result notifications are mainly based on in-site messages, supplemented by text message notifications, so be sure to check them regularly.
2. Qualification review
In previous years, the qualification review was conducted offline. This year, since students can choose their own test sites, most provinces have adopted a combination of online and offline methods.
The provinces that adopt online qualification review are: Beijing, Hebei, Hunan, Jilin, Northern Hebei, Mengdong, Shandong, and Shanghai.
The online qualification review is mainly for "candidates who applied for company A, received the exam notice and confirmed on the recruitment platform to choose the exam center outside A province to take the exam", mainly using Tencent Conference or DingTalk for review. Some provinces will require candidates to send scanned copies of various materials to designated mailboxes in advance. It is recommended that students prepare several more copies of materials and prepare the equipment and accounts required for connection in advance.
The offline qualification review is mainly aimed at "candidates who apply for company A, receive the exam notice and confirm on the recruitment platform to choose the test center in province A to take the exam." Most provinces will require candidates to be divided into professional categories according to their majors. Go to the designated location for qualification review during the time slot, and some need to reserve a time slot in advance. It is recommended that you act as required according to your own situation and do not arrive early or be late.
I hope the above content will be helpful to you. If you still have any questions, please consult a professional lawyer.
Legal basis:
Article 19 of the "Electric Power Law of the People's Republic of China"
Power enterprises shall strengthen safety production management and adhere to safety regulations. 1. Adhere to the prevention-oriented approach and establish and improve the safety production responsibility system.
Power companies should conduct regular inspections and maintenance of power facilities to ensure their normal operation.
Article 20
Power generation fuel supply enterprises, transportation enterprises and electric power production enterprises shall supply, transport and receive and unload fuel in accordance with relevant provisions of the State Council or contractual agreements.
Article 21
The operation of the power grid shall be subject to unified dispatch and hierarchical management. No unit or individual may illegally interfere with power grid dispatching.
Article 22
The state encourages power production enterprises to operate in parallel with the power grid, and between the power grid and the power grid. If a power production enterprise with independent legal personality requires the power it produces to be connected to the grid for operation, the power grid operating enterprise shall accept it.
Grid-connected operation must comply with national standards or power industry standards.
Both parties to the grid connection shall sign a grid connection agreement to determine the rights and obligations of both parties in accordance with the principles of unified dispatch, hierarchical management, equality, mutual benefit, and consensus through consultation; if the two parties to the grid connection fail to reach an agreement, the power grid connection shall be decided by the provincial or above level The power management department coordinates the decision.
Article 23
Measures for power grid dispatch management shall be formulated by the State Council in accordance with the provisions of this Law.
- Previous article:Huawei ai real-time translation
- Next article:Grade of tax agency
- Related articles
- How about the quality of Jinjiang Sheng Da machinery and Shuitou Lipu machinery? I want to buy an infrared medium cut. Who can provide reference?
- What are the top ten high-paying occupations today?
- Salary of Haiyan nuclear power plant
- Is the salary of Shandong Blue Ocean cord tire high?
- We produce non-woven products (masks, surgical gowns, shoe covers). How much is Alibaba International Station a year? Will it be good after it is done?
- Which is better, Nanning Tian Jian Basketball Club or Nanning Zhonghao Basketball Club?
- Does it mean that wisdom teeth will prevent you from growing taller?
- Five Standard Nanny Contract Templates
- Which school in Chongzhou is better?
- How to write tutor recruitment? thank you