Job Recruitment Website - Zhaopincom - Is Gaotouyao Coal Mine easy to enter?

Is Gaotouyao Coal Mine easy to enter?

Easy access.

Gaotouyao Coal Mine is a large-scale modern mine built by Huaneng North Company. Construction started in 2008 and it was put into operation in March 20 14. The designed production capacity of the mine is 8 million tons/year, and now the approved production capacity is100000 tons/year, and the supporting coal preparation plant is 8 million tons/year. The mine field covers an area of 99.5km2, with proven reserves of 654.38+0 billion tons, recoverable reserves of 632 million tons and mine service life of 60.9 years. The mine belongs to low gas mine and adopts inclined shaft development method. The four shafts are inclined shaft, main shaft and auxiliary shaft, in which the belt conveyor is used to transport coal. When using the trackless rubber-tyred vehicle to transport people and materials, two air shafts are vertical shafts, which are dedicated to mine air return. There are five layers of coal that can be mined in the mine, which are mined in two horizontal planes.

The specific requirements for recruiting underground coal mine production equipment operation, equipment maintenance and production auxiliary posts are as follows.

1, whose major is mining engineering (coal mining technology), machinery manufacturing and its automation, electrical engineering and its automation, etc.

2. Education requirements: Full-time college degree or above (20 19-202 1 graduation).