Brief introduction of Huaneng Baiyanghe Power Plant

Huaneng Baiyanghe Power Plant is located in Boshan District, Zibo City, Shandong Province, with a total installed capacity of 890MW (2 × 145MW+ 2 × 300MW). Built in March of 1966, the original 50MW unit has three sets. It was completed and put into operation in 1969, 65438+February, 1970, 65438+ 10, 197 1 65438+ 10. It is the first fully open-air high-temperature and high-pressure thermal power plant in China.