Job Recruitment Website - Zhaopincom - How long is the Taocun Railway Road in Zhaoyuan and how to repair it?

How long is the Taocun Railway Road in Zhaoyuan and how to repair it?

The total length of Zhaoyuan Taocun Railway is about 16.5 km, and the repair time of Zhaoyuan Taocun Railway is unknown. According to the Intention of Government Procurement in April-May, 2022 issued by Yantai Municipal Transportation Bureau, it is clear that the pre-feasibility study of Zhaoyuan-Qixia-Taocun Railway will be started. The procurement requirements are: prepare the pre-feasibility study report of the newly-built Zhaoyuan-Qixia-Taocun Railway, which should meet the requirements of the Measures for Preparing Pre-feasibility Study, Feasibility Study and Design Documents of Railway Construction Projects (TB 10504-20 18) and the relevant design specifications of the State Railway Administration. The total length of Zhaoyuan Taocun Railway is about 16.5 km, which is an important railway line in Zhaoyuan City, Shandong Province. The railway was built in 1976, connecting Taocun Town of Zhaoyuan City with other areas, facilitating the transportation of people and goods. With the passage of time, this railway has been repaired and rebuilt many times to ensure the safety and smoothness of the railway line. These maintenance work mainly includes repairing tracks, replacing tracks, strengthening bridges and maintaining facilities along the line. Through continuous maintenance and improvement, Zhaoyuan Taocun Railway has maintained a good running state and made positive contributions to local economic and traffic development.