Three samples of standard paint construction contract.
Model text of paint construction contract 1
Employer: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, impartiality and honesty and trustworthiness, both parties reached an agreement on the construction cooperation of the construction project and concluded this contract.
A, project overview and contract work content:
1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Second, the contract method and work content:
1. contract mode: adopt the contract mode of contracting for materials, quality, safety and time limit, and be responsible for painting and coating construction of the project until it is delivered.
2. Work content and practice: scrape the inner wall and polish the putty twice, roll the latex paint twice, stick gypsum board and cloth tape, plaster and scrape it, scrape the putty twice and roll the latex paint twice. Exterior wall and flexible exterior wall shall be putty twice, transparent alkali-resistant sealing primer once and exterior wall coating twice.
Three. Contract price and payment method
1, the price of exterior wall coating is per linear meter of 34 yuan, and interior wall coating is per square meter 16 yuan.
If there is ceiling gypsum board per square 20 yuan.
2. During the construction, Dabai paid 30% of the total project cost for the first time, 40% for the second time after scraping, and 30% for the completion acceptance.
IV. Construction Safety, Quality and Progress
During the construction process, Party B must do a good job in safety production and civilized construction in accordance with the Regulations on Safety Production Management and the Operating Rules for Safety Production Construction. The construction contractor shall be responsible for the work-related accidents that occur in violation of the construction operation procedures.
Verb (abbreviation of verb) supplementary clause
Matters not covered in this contract shall be settled by both parties through negotiation, and this contract is made in duplicate. The signature of Party A and Party B takes effect.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model essay on paint construction contract II
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In order to successfully complete the construction task of this project, ensure the high-quality project, create a safe and civilized double-standard chemical field and give full play to the enthusiasm of the construction team, the project department implements the internal contract responsibility system. Upon Party B's request for Party A's consent, Party B will contract the decoration works (painting and white cement decoration works) of this project. In order to clarify the responsibilities of both parties, the following contract is signed through consultation, and both parties must strictly abide by it.
1. Project location and name: Bid 1 of Meilanyuan Community, Danghu Road.
Two. Content and scope of the project: the project (materials shall be borne by Party B).
Three. Settlement method: according to the actual area: white cement ceiling yuan /M2, white cement wall yuan /M2, painted wall yuan /M2, painted wall yuan /M2.
Fourth, the quality requirements:
(1) Party A requires that this project must achieve high quality.
(2) Party B promises to ensure the high-quality project of this project (subject to quality supervision and evaluation) and operate according to the requirements of Party A's quality commitment letter.
5. Time limit: Party B must complete the production schedule plan formulated by Party A on time.
6. Payment method: 50% of the project payment shall be paid monthly according to the project progress, and the full amount shall be paid after the project is completed. The payment of the remaining amount after the completion acceptance must be signed by the countersigner.
Seven. Responsibilities of both parties:
(I) Party A's responsibilities
1. Party A is responsible for technical disclosure, supervision and inspection of Party B's quality, safety and civilized construction, recheck various specifications, sizes and quantities, and put forward rectification opinions.
2. Party A is responsible for conducting safety education and safety knowledge examination for Party B. ..
3. After the materials enter the site, Party B must be responsible for unloading and stacking them neatly.
4. Party A shall be responsible for the temporary accommodation and meals of Party B's personnel (the meals shall be borne by Party B).
5. Party A is responsible for registering the temporary population of Party B's personnel and assisting Party B to handle the necessary documents (the expenses shall be borne by Party B).
6. In case of any of the following circumstances, Party A shall have the right to terminate the contract or withdraw, and Party B shall compensate Party A for the corresponding economic losses.
If the quality fails to meet the quality standards, it will be fined 10% of the project cost;
B. Due to the responsibility of Party B, the construction period is delayed and a fine of RMB/day is imposed;
C. If a major safety accident is caused by Party B's illegal operation, the expenses shall be borne by Party B, and Party B shall be fined RMB;
D. Economic losses caused by accidents and fights due to violation of public security management shall be compensated by Party B, with a fine of 1 1,000 yuan/time.
7. Party A shall provide internal scaffolding and iodine tungsten lamp, and Party B shall be responsible for other tools.
(II) Party B's responsibilities
1. Party B must carry out the construction according to the construction drawing (minutes of joint hearing and change contact list), operate according to the specifications, and actively accept the quality supervision and management of the quality supervision department, the owner, the supervisor and Party A. ..
2. Party B must carefully organize the construction according to the standards of high-quality projects. Before starting construction, Party B must prepare a reasonable construction plan and designate a special person to be responsible for the quality. If quality problems are found, they should be rectified in time.
3. Party B must form a construction team with excellent quality and instill quality awareness into every member of the team. In case of the following quality problems, Party A will impose a fine, which will be deducted from the project payment of the month.
4. Party B must complete the schedule arranged by Party A and shall not delay the construction period. Party B shall provide labor force according to the requirements of Party A, and shall not stop work without reason. Stop work without reason, and fine 500 yuan every time.
5. Party B must strictly implement the safety rules and regulations formulated by Party A, attend the safety education and related meetings organized by Party A, take part in the safety knowledge examination, conduct safety education and safety disclosure to the team members every day, urge the team members to use safety labor protection articles, conduct safety activities once a week, keep a safety diary and resolutely put an end to casualties. In case of industrial accidents due to Party B, all losses and expenses shall be borne by Party B, Party A shall be responsible for Party A's reasons, and other teams and individuals shall bear all expenses.
6. Party B shall actively cooperate with Party A to create a "double-bid" site, reasonably pile up materials, put an end to the phenomenon of "disorder and dirt" on the site, do a good job in cleaning up the leftovers, and shall not scatter them anywhere, clean up the site after work, and shall not refuse to clean up the leftovers for any reason. Party A will be fined 200 yuan/time for urging for many times.
7. The person in charge or contractor of Party B must personally command at the construction site 90% of the time, otherwise the project progress payment will be withheld or stopped.
8. Party B is responsible for the safety management of Party B's personnel at the construction site. No picking fights, fighting, gambling or bringing children and construction-related personnel into the construction site. It is forbidden for men and women to live together in the dormitory. If the above things are found, a fine will be imposed according to the Regulations on Punishment of Dormitory Management, and it will be severely sent to the local public security organ for handling (Party A will not arrange girls' dormitories and couples' rooms).
9. Party B must be familiar with the operation procedures of various machines in this type of work, connect the electricity safely and take protective measures according to the standards. Illegal operation is strictly prohibited. Each machine must be used by a designated person, and fire prevention and extinguishing work must be done well. If illegal operation is found, the fine will be 30- 100 yuan/time.
10, Party B must save raw materials, make full use of floor ash and other raw materials, and shall not waste them. The collected materials and tools shall be properly kept and returned in time, and all lost materials shall be compensated by Party B according to the price.
Eight, reward and punishment standards
1. This contract includes a quality award.
2. The standard of liquidated damages in this contract has been stipulated in the above detailed rules.
Nine. Other explanations
1. All fines will be deducted from Party B's monthly salary. After Party A verbally puts forward the contents of the fine, it will issue a fine, which is valid without the signature of the monitor.
2. For matters not covered in this contract, both parties shall sign a supplementary agreement through consultation.
3. This contract is made in quadruplicate, one for Party A and one for Party B, which shall come into effect after being signed by both parties and become invalid after the project is completed.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model essay on paint construction contract 3
Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), Construction Law of People's Republic of China (PRC), Regulations on Construction Project Management and Regulations on Construction Project Safety Management, both parties reached an agreement on the contracting of paint project of Building A of Yuanmengyuan on the principles of equality, voluntariness, fairness and good faith, and hereby concluded this construction contract.
I. Overview of the Project:
1. Project name: Block A, Dream Garden of Chenzhou Hongye Real Estate.
2. Basement on the second floor,18th floor residence. The total area is about 20 _ 0m2.
2. Mode and scope of contract:
1. Contracting method: contracted projects and materials, contracted duration and contracted quality. Party A provides ordinary cement.
Second, the scope of contracting:
2- 1. Indoor engineering: the porcelain-like paint on the ceiling of the walkway, stair wall, walkway, stairs and elevator hall was successfully polished. Other ceilings should be scraped twice.
2-2, small concrete chisel flat within the scope of the contract. Chisel away iron wires and nails, and brush anti-rust paint on exposed parts of iron pieces. All construction machinery and hand tools. Operating frame to be installed during construction.
2-3, construction electricity and construction lighting. (Party A only provides construction electricity for each floor, and the electricity fee shall be borne by Party A). Party B shall be responsible for other electrical equipment. Labor protection articles within the contracted scope.
2-4. Unloading and storage of materials within the contracted scope.
2-5. Safe and civilized construction within the contracted scope, site cleaning, and protection of finished products and semi-finished products until the project is qualified. 2-6. Warranty for engineering quality defects. After acceptance of warranty period 1 year.
2-7. Party B shall bear all responsibilities and expenses for the safe construction within the contracted scope in case of any safety accident.
2-8. Party B shall be responsible for the construction period, quality and safety of all sub-projects contracted by it. ..
Three: engineering quality, technical requirements and safe and civilized construction.
1. The quality grade of this project is qualified, and the project quality must meet the national acceptance standard. If the project within the contracted scope fails to meet the qualified standards, resulting in the need to repair the quality defects of the project, all responsibilities and expenses shall be borne by Party B. ..
2. If the paint quality of Party B is not up to standard during the construction period, Party A has the right to change the construction team. After the project is completed and accepted, the amount of work completed by Party B shall be settled at 80% of the contract price.
3, technical requirements:
3- 1 outdoor: 888 glue at the bottom of the roof truss, and white waterproof coating on the surface twice. Frame columns and beams require that the angle of yin and yang must be straight and the color cannot be changed. Window top plate, window bottom plate, air-conditioning bottom plate, cornice, canopy and line surface are all white scratch-painted polishing brush wall topcoat.
3-2. Indoor: The walkways, stair walls, walkways, stairs and ceiling of the elevator hall are painted with 888 imitation porcelain twice. All-white reflection is required, the angle of yin and yang is straight, the ceiling is basically smooth and polished, and there is no scratching phenomenon and no obvious convex and concave phenomenon. Scraping double lime powder glue on the ceiling of other rooms can be a part of cement. The colors of each room are the same, and the angles of yin and yang are straight, without scratching, convexity and concavity, and smooth.
3-3 Basement: The walls, columns, beams and ceilings were successfully polished with square enamel. It is required that the angle of Yin and Yang should be straight, without scraping and obvious convex-concave phenomenon, and its origin should be straight.
4. Party B shall provide safety education to the construction personnel entering the site. Importance of implementing safe and civilized production. In case of quality, safety and civilized construction problems, the fines of relevant departments shall be borne by Party B. ..
4. Contract unit price and payment method.
1, contract unit price The following contract unit price includes concrete surface chisel and nail wire chisel.
1- 1, outdoor wall engineering: black waterproof coating for external wall shrinkage joint, including primer, actually at the price of RMB per meter. drip line black waterproof coating includes white waterproof coating for window top and drip line 15cm width, at the price of RMB per meter. ..
1-2, outdoor window bottom plate, air conditioning board, overhangs, awnings, and lines over 15 cm wide shall be painted with waterproof coating according to the actual development area of RMB per square meter.
1-3. The fangci paint of indoor stairwells, walkways, elevator hall walls and ceilings is calculated according to the actual area of RMB per square meter.
1-4. Indoor basement: the fangci paint of walls, columns, beams and ceilings is calculated according to the actual expanded area, and it is RMB per ㎡.
1-5, other indoor ceilings, beams and columns shall be leveled with double lime powder glue, and the actual expanded area shall be calculated as per ㎡ yuan.
2. Payment method: pay% of the progress payment according to the progress of the project, once every 1 month, pay% after the project is accepted, and pay the rest within 1 month after the settlement is approved by the project owner.
Verb (short for verb) duration:
1, the project above plus or minus zero was completed at the end of July 20th. Bao Zheng, the exterior paint, did not assume the responsibility of disassembling the outer frame by mistake.
2. The basement was completed at the end of August 20_.
Obligations and responsibilities of intransitive verbs;
(I) Obligations and responsibilities of Party A:
1, responsible for construction technical disclosure. Responsible for handling temporary residence procedures.
2. Provide accommodation. Domestic water and electricity (provide accommodation lighting once). Painters uniformly open 1 canteen. All the utensils and expenses in the canteen are at their own expense, and only coal and gas are allowed. If electricity is needed to open the canteen, an electric meter must be purchased and installed by Party A's electrician. Connection is not allowed without permission. According to the electricity meter, each kilowatt-hour is 1.2 yuan.
3, timely solve the mistakes in the construction.
4. Check and supervise the project quality and safe and civilized construction.
5. Pay the contract price and settle the salary according to the contract.
(II) Obligations and responsibilities of Party B:
1. Party B must participate in the midway acceptance and completion acceptance of the contracted project.
2. Carry out the construction according to Party A's technical disclosure, design changes and the requirements of the owner and Party A. We must ensure the project quality and construction progress. Adhere to safe production and civilized construction.
3. Obey the command and inspection of the owner and relevant supervision departments, and obey the unified command and deployment of Party A's inspection and construction, so as to achieve civilized construction. Cherish materials and mechanical equipment. The loss and damage of Party A's materials and equipment shall be compensated at the original price.
4. Safety in production: observe the operating rules and do not operate illegally. Construction personnel must wear safety helmets when entering the site, and must wear safety belts when working high above the ground. Slippers, high heels, plastic shoes and barefoot are not allowed, and barefoot work is not allowed. Those who violate the above provisions will be fined 200 yuan every time. The above fine will be deducted from Party B's contract funds. All responsibilities and expenses arising from safety accidents in construction operations shall be borne by Party B. ..
5, law-abiding, do not fight, do not stir up trouble, do not organize or participate in gambling, it is strictly prohibited to go to work after drinking, put an end to all illegal acts. All disputes caused by Party B's personnel shall be borne by Party B, and losses (including three persons) shall be deducted from Party B's contract payment.
6. During the construction period, Party B's construction personnel shall not quarrel with the person in charge of this project and the management personnel of the owner and supervision department under any excuse, and shall not beat the person in charge of the construction site and the management personnel of the owner's supervision department. All losses, responsibilities and expenses caused by similar incidents shall be borne by Party B, and the perpetrators shall be dismissed. If the circumstances are serious, it shall be sent to judicial organs for legal treatment, and all expenses shall be deducted from the contract amount.
7. Save water and electricity, and do not use electrical appliances to boil water, cook and test fire. If it is found that 200 yuan is fined every time, Party B shall be responsible for all the safety accidents caused thereby. It is not allowed to connect the power supply at will, and it must be connected by a professional electrician. Pay attention to the sanitation of the site, and don't urinate anywhere where there is no toilet. Party B shall be responsible for the fines imposed on Party A by the competent authorities and superior departments due to Party B's personnel, and 200 yuan shall be fined every time the site is found, and the site shall be cleaned up.
8. It is forbidden for Party B's construction personnel to steal the property and personal property of the construction site. Once found, it will be sent to the public security department for handling, and the consequences will be at your own risk.
Party A will also impose a fine of 100 times the property value on the thief, and the fine will be deducted from Party B's contract payment.
Seven, the contract and settlement of this project must be paid by the builder of this project.
Eight. Matters not covered in this contract shall be settled by both parties through consultation.
Nine, this contract is made in triplicate, which has the same legal effect after signing.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Three articles related to the standard version of the paint construction contract model;
★ The latest version of 2020 paint construction contract template 3.
★ 3 templates of paint construction contract in 2020.
★ 3 copies of the paint project contract model.
★ 3 The latest paint construction contract.
★ 3 Model paint construction contract
★ 3 copies of the contract model of paint and coating.
★ Model paint contract
★ Paint the construction contract template.
★ Model paint and coating contract
★ 3 standard individual project contract templates
- Previous article:What is the salary of Goldwind Technology?
- Next article:What time does Linyi Xinye open?
- Related articles
- Will Hunan Huasheng Dongting Hemp Industry Co., Ltd. relocate?
- How many garment factories are there in Xinxian County?
- How about Chengdu Pixian Lenovo Electronics Factory?
- How long can traffic violations in Xianyang be investigated?
- How about Suzhou Taicang Yuewang Electronics Factory?
- China Ocean Engineering Research Institute (Qingdao) Welfare Treatment
- What are the specialties of secondary vocational teachers' qualification certificate?
- Hello, is it better to take the banking qualification certificate before or after entering the bank?
- I posted my resume on Lilac Talent Online for a week, but I didn't respond.
- Which one has better development prospects, Anshan Yuhong or Liaoning Hainuo?