Job Recruitment Website - Zhaopincom - Is the wall painting before or after installing the door and the acceptance quality?
Is the wall painting before or after installing the door and the acceptance quality?
It should be the first door and then the wall. The main reasons are as follows: When installing the door, please use a chainsaw or other tools. If you draw, your wall will be dirty. When installing the door, there were many materials such as doors and skirting boards, which were long and hard, and the installer accidentally broke the wall. Although the wall can be replaced before or after installing the door, there is a gap between the primary water supply and the wall.
The line of the door cannot be completely in line with the wall. After closing the door, there will be a gap. If it takes some time to fill these gaps, then the space can be repaired at one time, just like a big space. I can find the teacher many times. After the repair is completed, it must be drawn.
It should be better to install the door first, because cement replacement may be incorrect. Fix the position, then put putty and brush the primer. It is slightly better to separate the wall before or after installing the door, but it is recommended to fix the position from the door frame before removing the door. Put it somewhere else, otherwise it is inevitable that the paint will fall on the door and it will be difficult to clean the back.
Check the decoration quality of the project.
Before entering the house. Observe whether the demolition and rectification works conform to the contract, whether there are potential safety hazards before and after wall painting, whether the wall treatment is clean, and whether the quantity, grade and specification of materials conform to the previous agreement.
2. In the second stage of water loop acceptance, waterway and loop transformation must be separately accepted. If the design is reasonable, the operation is standardized and the transformation of the production line is reconfirmed, consumers should verify whether all the transformed production lines are stable under the operation of professional hydraulic or electrician. Only after the actual size is changed, the putty worker can lift the wall and put putty on it.
3. The scale of woodworking work After the third acceptance of the woodworking base is completed, the roof and plastering line in the room must also be completed before or after the wall painting is completed. The tiles in the kitchen and bathroom are also sticky, and the walls to be painted should be scraped twice. Acceptance of putty is very important at this stage. Consumers should read the drawings carefully to confirm the size of each piece. If any inconsistency is found, the construction team shall be required to correct it immediately.
4. Woodworking quality When all the boards are bonded together with wires, consumers can carry out the fourth stage of acceptance. This period is basically a construction period. At this stage, the inspection should focus on the color and texture of wood products, as well as poor flatness and large area uniformity.
After the carpentry is finished, the oiler can start the priming treatment, and all tiles must be in this stage, whether the wall painting is before or after the door installation, which is the fifth step of the acceptance stage.
5. The final acceptance content after completion is the most complete and detailed. Consumers should check the installation of pedals, sanitary ware and accessories. If the top layer of wood products is in place, if it is on the wall, it will be evenly coated on it, and if the panel wiring is correct, the accessories installed by the electrician will be enough. In addition, consumers should ask the construction equipment to clean the room thoroughly before leaving.
The above is some information about the wall painting in front of or behind the security door and how to check the quality of the house. I hope it helps you. ?
- Previous article:How did you get into Hunan Fuxing Group Co., Ltd.? What's worth sharing?
- Next article:Is it easy to be a home improvement consultant?
- Related articles
- How about Zhongmu Bicycle Battery Factory? What is the salary?
- Can I get my ears pierced in Cangzhou Tian Tong Shopping Center?
- Interview time of civil servants in Yulin city
- Recruitment information of Yuan Xinfang Peanut Professional Cooperative in Shanghang County, what about Yuan Xinfang Peanut Professional Cooperative in Shanghang County?
- What factories are there in Yongchuan Phoenix Lake Industrial Park?
- How about Huaxi biological skin care products?
- List of leading chip concept stocks in 2022
- How to create a resume on the computer?
- Ningxia Hyatt Business Conference and Exhibition Co., Ltd. Recruitment information, what about Ningxia Hyatt Business Conference and Exhibition Co., Ltd.
- Is Yantai Oriental Electronics easy to enter?