Article 1 In order to strengthen the power grid dispatching management and ensure the safe, stable and economic operation of the power grid, according to the China

People's Republic of China (PRC) Electricity Law

"Regulations on Power Grid Dispatching Management" and relevant rules and regulations issued by the State Electricity Regulatory Commission, combined with household appliances in Northeast Power Grid

Physical condition, these regulations are formulated.

deprive

2

Article 2 According to the characteristics of electric power production, the power grid must implement the principle of unified dispatching and hierarchical management. Northeast power grid

Four-level dispatching, namely network dispatching, provincial dispatching, local dispatching and county (district) dispatching. Level 4 scheduling in scheduling business and operation command is on,

Subordinate relationship, network dispatching manages the operation of Northeast Power Grid according to law, exercises the unified dispatching authority of the whole network, and dispatches the power of provinces, prefectures and counties.

(region)

Implementing hierarchical management and dispatching of the power system under its jurisdiction;

Northeast power grid dispatching accepts the command and leadership of national power dispatching.

Tour guide.

sequence

three

Article:

Dispatching and operation rules of northeast power system are the basic rules for operation and accident handling of northeast power system.

must

Strictly enforced. The regulations, instructions and duty regulations issued by various production units shall prevail in case of any conflict with these provisions.

It shall be revised according to this regulation.

sequence

four

Article: On-duty dispatcher of network dispatching is the commander of northeast power system operation and accident handling during duty.

Exercise the command right according to the specified dispatching scope, and when necessary, the network dispatching has the right to issue dispatching command instructions. Provincial adjustment, local adjustment and development

Long-term value of power plant,

The shift supervisors of substations and EHV bureaus accept the dispatching instructions of network dispatching.

Duty to issue instructions

The dispatcher shall be responsible for the correctness of the dispatching instructions issued by him.

sequence

five

Article: Dispatching instructions issued by the dispatcher on duty for power grid dispatching to the personnel on duty at lower levels, power plants and substations.

Ultra-high pressure bureau must be implemented unconditionally;

If the person on duty thinks that the received instruction is incorrect,

Suggestions should be made to the network dispatcher.

I saw it;

If the dispatcher on duty repeats this instruction,

Junior officers must be executed quickly;

If the instruction is carried out, it will endanger people.

When the body and equipment are safe,

On-site personnel on duty shall refuse to carry out it,

And report the reasons for refusing to execute to the dispatcher on duty and Ben.

Directly affiliated unit * * *.

If the lower scheduling,

Power plants,

The personnel on duty in substations and EHV bureaus do not perform or delay the execution without reason.

If the on-duty dispatcher's instructions are adjusted by the network, the on-duty personnel who have not executed the instructions and the * * * who are allowed not to execute the instructions shall be responsible.

sequence

six

Article: Instructions issued by power generation, transmission and power supply units * * * that involve the authority of the on-duty dispatcher of network dispatching must be approved.

Only with the permission of the on-duty dispatcher of network dispatching can it be implemented.

When it happens to people,

An emergency that seriously threatens the safety of equipment,

Are you here?

When network scheduling is carried out with the permission of the on-duty dispatcher, the lower-level dispatcher or the on-site personnel on duty can operate according to the regulations.

, and immediately report to the dispatcher on duty.

sequence

seven

Article 3: All power plants and substations incorporated into the Northeast Power Grid must obey unified dispatching and observe dispatching discipline. power plant

Moreover, the grid-connected operation of substations must meet the grid-connected conditions, and a grid-connected agreement must be signed, which must include a grid-connected dispatching agreement.

Otherwise, it cannot be connected to the grid.

sequence

eight

Article:

No unit or individual may interfere with the personnel on duty in the dispatching system to issue or execute dispatching instructions.

Distribution system

The personnel on duty have the right to refuse all kinds of illegal interference.

sequence

nine

Article: When the power plant or power grid operates abnormally, the long-term value of the power plant, the long-term value of the substation, and the dispatchers at all levels.

The on-duty dispatcher of EHV Bureau and relevant personnel shall immediately report to the on-duty dispatcher of network dispatching.

In order to take timely measures to prevent the accident from expanding.

Measures. If the personnel on duty conceal the truth and fail to report it within the time limit, which will affect or delay the handling of the accident, they shall bear the responsibility.

sequence

10

Article: When there is any violation of dispatching discipline such as refusing to execute dispatching instructions, the superior dispatcher shall organize an investigation.

Depending on the seriousness of the circumstances and consequences, those with serious circumstances will be dealt with according to the electric power method.

"Regulations on the Administration of Power Grid Dispatching" shall be investigated.

Responsibilities of relevant personnel.

sequence

1 1

Article 1: Relevant personnel of power generation, transmission and transformation units in Northeast Power System shall abide by these regulations, and infrastructure and facilities shall be established.

Relevant personnel of design, test and other units should be familiar with and abide by the relevant parts of this regulation.

sequence

12

Article: This regulation does not involve the related operation regulations of networking in Northeast China and North China, but the related operation after networking in Northeast China and North China.

These Provisions shall be implemented in accordance with the corresponding provisions issued by the National Coordination Center.

sequence

13

Article 3: The right to interpret this Regulation belongs to Northeast Company of State Power Corporation.

sequence

14

Article 1: From the date of implementation of this Regulation, the former Northeast Electric Power Administration

1995

year

12

Northeast Ministry of Electric Power was issued in June.

Unified dispatching operation procedures shall be abolished.