Wall construction contract agreement
Employer: Guanshuige Complete Primary School (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
According to the relevant provisions of the Contract Law of People's Republic of China (PRC), Party A entrusts Party B to build a small section of fence on the south and east sides of the school through negotiation between Party A and Party B and in combination with the specific conditions of this project. This contract is signed by * * *, and both parties shall abide by it:
I. Overview of the Project
1, project name: school fence;
2. Project location: south side and east side of Guanshuige Complete Primary School.
Second, the contract content and materials
1. Project content: the length of the fence is about 60m (the cement concrete foundation is 0.3m thick, 0.4m wide and 2.4m high, and an upright post is set every 4m, and the maximum sand ash is 0. 1 m with glass inserted).
2. Material selection: cement, gravel, lime sand and brick;
3. Contract form: hourly workers do not include materials (basic part of hourly workers: 80 yuan does not include daily meals; Manual removal of fences is another discussion).
Third, the construction cycle
Through consultation between both parties, the commencement and completion dates of this project are as follows:
1. Commencement date: 20110 June15;
2. Completion date: 20 1 1 year 65438+February 30th;
3. If the comprehensive building is under construction and cannot be constructed, the date can be extended, but it will end before the winter vacation.
Fourth, the quality and safety requirements
During the construction process, Party B must obey the unified command and dispatch of engineers and technicians, organize the construction scientifically, reasonably and orderly, strictly abide by the construction operation specifications and quality requirements, and formulate practical and effective safety construction measures to achieve safe production and civilized construction. Party A is not responsible for the quality and safety problems caused by Party B's construction, and has the right to instruct Party B to correct them.
Verb (abbreviation of verb) contract price and payment method
1. The labor price of the fence contracted in this contract is 80 yuan per day (excluding food and accommodation), and the tentative total length is 60m. Based on the actual amount.
2. Payment method: Party A and Party B agree that Party A shall be responsible for providing all materials and labor remuneration such as cement lime-sand bricks required for the project. After Party B completes the project, Party A will make a one-time payment after 10 days of acceptance (Party A is responsible for issuing tax bills and paying taxes).
Other unfinished matters of intransitive verbs shall be settled by both parties through consultation.
Seven. This contract is made in duplicate, one for each party.
Eight, this contract shall come into force as of the date of signature, and shall be automatically abolished after the completion of the project settlement. This contract is protected by law. If this contract conflicts with relevant national laws or is considered illegal and unreasonable by higher authorities, this contract will automatically become invalid. If it is caused by Party A, Party A shall be responsible; if it is caused by Party B, Party B shall be responsible.
Party A (signature): present:
Party B (signature):
date month year
Settlement list of wall reconstruction project
The school fence was completed on February 20th, 201kloc-0/65438 (since the school and the school purchased building materials, Party B undertook the construction, and the settlement is as follows:
I. Material: 1 1580 yuan
1, machine red brick 100 barrel: 5800 yuan.
2. Brick freight (Wang Gao-Guanshuige): 1300 yuan (per barrel 13 yuan)
3. Frozen bottom sand 1 1: 880 yuan.
4. 2 wall sand vehicles: 700 yuan.
5.5 tons of cement: 1750 yuan.
6. Gravel 6: 360 yuan.
7. A pack of lime 106: 424 yuan.
8. Wire and horse nails/nails/templates/barrels, etc. : 366 yuan.
Two. Labor cost: 9200 yuan
1, South Foundation: 800 yuan
2. Building a wall in the south: 3,200 yuan.
3. East foundation and wall construction: 4,000 yuan.
4. Demolition of East Old Wall (including transportation, demolition and washing): 1200 yuan (discussed separately, without tax bill).
Three. Tax paid: 896.39 yuan.
1, material tax: 337.28 yuan.
2. Labor tax: 559.438+0438+0 yuan.
Four. Total project price and quantity
The above three expenses total RMB twenty-one thousand six hundred and seventy-six yuan and thirty-nine cents (¥2 1 676.39 yuan).
Signature of liquidator:
Principal: Vice Principal: General Affairs Director: Supervisor: Accountant: Cashier:
Representative of Party B:
Teacher representative:
20 16 12 3 1
Temporary fence construction contract II
Employer: Jiangxi Xinwanyi Real Estate Co., Ltd. (hereinafter referred to as Party A) Contractor: Jiangxi Zhongtai Construction Engineering Co., Ltd. (hereinafter referred to as Party B) Through friendly negotiation between Party A and Party B, Party A entrusts Party B with the construction of temporary fence project of Fuxing Home. In order to clarify the rights and obligations of both parties in the construction process, this contract is signed through consultation:
I. Scope and content of the project:
1. Party B undertakes the construction enclosure project of Fuxing Jiayuan plot located in the north of Minhe Road and west of Jiahe Road in Jinxian County;
2. See the construction drawing provided by Party B for the specific method of fence;
3. Due to the geological reasons of this plot, Party B must treat the foundation of the fence to ensure the safe construction and use of the fence;
4. Construction requirements of brick fence: take the reference point specified by Party A as the reference point, C 15 concrete cushion, 300 wide? C20 reinforced concrete ground beam, with a height of 300 and a wall height of 240mm. The wall height is 500mm, and the wall column height is 2200mm. Every 4 100mm is a span wall, and the walls and columns are covered with cement mortar.
Second, the project quality:
1. Party B shall construct according to the drawings, with beautiful appearance and project quality meeting the acceptance standard;
2. Party B shall not enter the site for construction until the main materials required for the project are confirmed by Party A;
3. The wall construction contracted by Party B must ensure that the wall does not collapse and crack during the normal use of Party A. ..
Third, the time limit for a project:
In strict accordance with the arrangement of site management personnel, cooperate with the construction period to plan materials and tools, prepare sufficient materials and tools, and organize technical force to ensure that the construction period required by the owner, supervisor and general contracting contract is completed on time, with good quality and safety. This project will enter the site on 20 15 16 10 and be completed before February 5, 20 15.
Fourth, the project price and payment:
1, project price:
Answer: The unit price of the' brick fence' contracted in this contract is 300 yuan/m (this price does not include the pile price, which is calculated separately), and the tentative total length is120m, subject to the actual amount; The project cost is about 36,000 yuan;
B: The wrought iron railing on the brick fence contracted in this contract (height 1.7M), unit price 200 yuan /m, tentative total length 120 m, and the project price is about 24,000 yuan;
C: The unit price of the temporary fence with color steel baffle (height 2M) contracted in this contract is 120 yuan /m, the tentative total length is 100 m, and the project cost is about 12000 yuan.
The above price includes all engineering-related expenses, such as labor, materials and machinery, excluding tax.
2. Payment of project funds: 95% of the total amount shall be paid within 10 days after the project is completed and accepted by Party A (settled according to the actual engineering quantity).
The remaining 5% shall be paid without interest within 15 days after the expiration of the one-year warranty period.
Four, finished products and semi-finished products protection:
1. Party B is responsible for the supervision of the completed subdivisional work;
2. Party B shall be responsible for the maintenance and repair of damaged finished products and semi-finished products, and its economic losses shall be borne by itself. If Party B damages other subdivisional works during the construction, it shall pay compensation according to the price;
3. If Party B's finished products and semi-finished products are damaged due to Party A or other reasons (not due to Party B), Party A shall be responsible for handling; If Party A needs Party B to deal with it, Party A shall sign the required expenses (materials, working hours and other corresponding measures) to Party B according to the damage degree, and Party B can carry out maintenance treatment.
Verb (abbreviation of verb) Party A's responsibilities, rights and obligations.
1. Party A shall provide the construction conditions as stipulated in the contract and pay the project payment in time;
2. Party A is responsible for supervising Party B's project quality, progress, safety and construction period. , and put forward the right to rectification;
3. Make overall arrangements for each process to solve the problem of land acquisition;
4. Party A shall solve technical problems such as drawing errors and changes for Party B and apply for visas.
Duties, Rights and Obligations of Party B
1. In order to strengthen site management, the person in charge of construction shall keep in touch with Party A at the site at any time;
2. Party B shall strengthen the safety and civilized construction education for its construction personnel, consciously abide by the relevant regulations of the local government, consciously abide by Party A's regulations on on-site safety and civilized construction, put an end to safety accidents, public security and criminal cases, and maintain the image of on-site civilized construction;
3. When Party A fails to make payment within the time stipulated in this contract, Party B has the right to refuse the construction;
4. Party B shall organize the construction in strict accordance with the safety production management regulations. In case of illegal construction, Party B shall bear all the responsibilities.
Seven. This contract shall come into effect after being signed and sealed by both parties. Neither party shall violate the contract. In case of breach of contract, the breaching party shall pay 30% of the total contract amount to the other party as liquidated damages.
Eight. Matters not covered in this contract shall be settled by both parties through consultation. Disputes arising from the execution of this contract shall be settled through negotiation in time. If no agreement can be reached through coordination or mediation, a lawsuit can be brought to Jinxian County People's Court.
Nine. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively. It will take effect after being signed and sealed by both parties, and it has legal effect at the same time.
X this contract shall come into force as of the date of signature, and shall be automatically abolished after the warranty period of the project ends.
Attachment: Copy of Party B's personnel ID card.
Party A: Party B:
Company address: Company address:
Tel: Tel:
Date: Date:
Security protocol 3
Party A:
Party B:
Party A contracted the fence project to Party B. In order to avoid the occurrence of safety accidents in the work process and clarify their respective responsibilities, Party A and Party B reached the following agreement through consultation:
1, Party B's workers must accept the safety education organized by Party B's company, abide by the safety system and obey the safety management when entering the construction site.
Management, should be carried out in strict accordance with the safety operation norms stipulated by the state. Party B shall not start work without safety education for workers. Party B's workers must register and provide a safety responsibility letter signed by the workers themselves to confirm Party B's disclosure. 2、
3、
4. Party B shall carry out safety operation in strict accordance with Party A's safety technical disclosure. Use it correctly? Sambo? Is that correct? Limbs? Homework. If Party B violates the safety operation regulations during the construction, it will be punished according to the safety management regulations of both parties.
Where a safety accident is caused by Party B's responsibility, Party B shall bear corresponding responsibilities within the scope of responsibility.
5、
6、
7, strictly abide by the rules and regulations of the site, must abide by the law, obey the arrangement and command of site management personnel. Adhere to civilized construction and clear the site after work. The above agreement is made in duplicate, and both parties are expected to abide by it. This agreement shall come into effect after being signed by the responsible persons of both parties, and shall be formulated by itself after settlement.
Waste.
On-site representative of Party A: On-site representative of Party B:
date month year
Construction site safety management system
A, all personnel entering the construction site must wear safety helmet, license, standardize the use of seat belts, once found not wearing safety helmet, license and seat belt will be punished as follows:
1, managers or team leaders who don't wear safety helmets will be fined 50 yuan/time.
2. 20 yuan/person will be fined if the worker fails to wear a safety helmet.
3. Those who fail to wear the work permit will be fined from 5 yuan to 20 yuan.
4, limb, aerial work personnel did not wear a seat belt in 200 yuan/fine.
Second, it is forbidden for construction personnel (managers, team leaders and workers) to go to work after drinking. Once found, he was ordered to stop working that day and fined from 50 yuan to 500 yuan.
Three, it is forbidden to throw, throw items, tools, appliances, etc. Offenders will be fined 200 yuan/time to 500 yuan/time.
Four, it is strictly prohibited to urinate anywhere in the construction site, and offenders will be fined 200 yuan/times to 500 yuan/times. At the same time, all the urine on the construction site must be removed until the second offender is found.
Five, it is forbidden to wear hard shoes and slippers to enter the construction site.
Six, it is forbidden to children, has nothing to do with the construction personnel to enter the construction site.
Seven, it is strictly prohibited to pull wires without permission, and it is strictly forbidden to use electric furnaces, ovens, water heaters, etc. In the dormitory. Offenders will be fined 50 yuan to 1000 yuan/time.
Eight, it is forbidden for outsiders to spend the night.
Nine, matters not covered in the construction, should immediately organize management personnel, team leader * * * to cooperate with the consultation, if any party does not cooperate with 500 yuan/times to 1000 yuan/times.
Ten, the above violators, all by the team leader compensation. If it is not paid, the next step of construction shall not be carried out.
On-site representative of Party A: On-site representative of Party B:
Year, month, sun, moon, sun.
Management system of each monitor, team leader and foreman
A, each team leader must be on duty at the scene all day.
Second, obey the arrangement of the site management personnel.
Third, take full responsibility within the scope of work.
Four, each team leader must be familiar with the construction drawing, technical specifications and quality requirements.
Five, organize workers to carry out pre-shift quality and safety education, and submit it to the office in writing.
Six, regularly organize workers to learn safety regulations.
On-site representative of Party A: On-site representative of Party B:
Year, month, sun, moon, sun.
- Related articles
- How long has Shengtuo Wanda Tire Factory registered?
- How to recommend the new products of Jianwei furniture.
- 20 14 where can I find the examination information of primary and secondary school teachers in Guilin?
- Shangshui Clever Wife Project Recruitment
- Can I get a refund if I pay tuition in Uni-door National School? How come?
- How about Weihai Branch of Beijing Zhongnong Xinda Information Technology Co., Ltd.?
- Brief introduction of Guangdong Hardware City
- How do game developing countries hire gorillas, bears and robots? 10 years no see. Give some advice.
- Does Luoyang 6 12 study all recruitment training departments?
- How to submit your resume is the most effective.