Job Recruitment Website - Zhaopincom - Responsibilities of highway surveyors

Responsibilities of highway surveyors

Responsibilities of highway surveyors 1 1. Study hard on technical knowledge and be familiar with various measurement techniques, rules and regulations, standards and regulations.

Two, do a good job in the area in charge of measurement standards and civilized safety management, measures and information is complete.

Third, do a good job in all kinds of survey closure, elevation, coordinates, positioning, setting-out, angle, original data of traverse, data recording, statistics of survey results, drawing of survey map, etc. , and meet the construction requirements.

Four, do clear technical requirements, testing procedures, main problems, quality requirements, strengthen the quality management of measuring unreeling work, and implement the measurement review system.

5. Do a good job in sorting out survey results, drawing survey maps, collecting, sorting, submitting and keeping data. All data must be accurate, true and reliable.

Six, do a good job in the calibration of measuring instruments and equipment, as well as the maintenance, repair and storage of measuring instruments and equipment, tools and other equipment, to ensure accuracy and maintain a good state of use.

Seven, responsible for guiding the measurement technology work of subcontractors, and solving difficult measuring points and turning points.

Eight, complete other work assigned by the project manager.

Responsibilities of highway surveyors 2 1. Cooperate closely with the construction, adhere to the work style of seeking truth from facts and being serious and responsible, obey the work arrangement, and complete the construction survey and setting-out task on time.

2, familiar with the construction drawings, according to the requirements of the relevant specifications and standards, the preparation of measurement scheme, ready to measure the required tools form.

3. When measuring, carefully install the adjustment instrument, make accurate readings, keep the records clean and tidy, and use the legal measurement unit.

4. Understand the design intent before measurement, and study and check the drawings; Understand the construction deployment, and make the survey and setting-out plan.

5. In conjunction with the construction unit, the survey control points of red line piles shall be calibrated on site.

6. Verification and calibration of measuring instruments.

7, familiar with the performance of the measuring instruments used, manage the weekly inspection of measuring instruments on time.

8. Work closely with the design and construction, make full preparations in advance, and formulate a feasible survey and setting-out scheme synchronized with the construction.

9. Pay-off and inspection shall be done in all stages and main parts of the whole construction process, and the audit of measuring and setting-off scheme and the guidance and inspection of measuring and setting-off work shall be strengthened to avoid rework.

10, take the initiative in line inspection. Line inspection should start with the review of survey and setting-out plan, and put forward preventive requirements for survey and setting-out work before construction in each major stage, so as to truly nip in the bud.

1 1, accurately set the elevation.

12, responsible for vertical observation and settlement observation, and record the observation results (data and curve chart).

13, responsible for timely sorting out and improving the measurement data such as baseline review and measurement records.

14, assist the construction foreman to do a good job of surveying technology review.

Responsibilities of highway surveyors. Directly obey the command of the survey team leader, conscientiously implement the work arrangement and plan, obey the specific post arrangement, be familiar with the rules and regulations formulated by the survey team and the engineering department, and conscientiously implement them.

2, familiar with the tender documents, design drawings and data and other commonly used engineering data, can draw simple related samples and construction auxiliary drawings, fill in the original data of engineering survey, and record the measurement content, time, service process and disclosure personnel for later investigation.

3, in strict accordance with the preparation of the survey monitoring work overall plan and the construction of each division of the special plan to implement the survey work content, there are changes in the plan must report to the survey team leader, shall not change the work content and methods.

4, in the construction control survey work, find out the survey line and each traverse point in advance, and be familiar with the position of the control sign, protect the survey sign. In field work, it is required to use all kinds of measuring instruments accurately, quickly and correctly, and record the original measurement data in detail.

5. In the construction monitoring, be familiar with the location and frequency of monitoring points, install monitoring points according to the requirements of the scheme, carry out monitoring work in strict accordance with the monitoring frequency, and fill in the monitoring report and monitoring chart carefully. Protect the monitoring signs, check them regularly, report the damage in time, and supplement and maintain them according to the situation.

6, to do a good job of construction lofting, carefully consult the drawings before lofting, comprehensive calculation results, requires to master the commonly used simple coordinates and elevation calculation, skilled use of the calculation program in the engineering calculator, you can supplement the simple lofting point position at the scene.

7, the industry requirements can be familiar with all kinds of construction lofting data classification and filing, accurate custody of all kinds of new documents and information. Can use computer EXCEL, WORD, CAD and other commonly used software for data editing and construction drawing.

8, seriously implement the system of using measuring instruments, fill in the accounting of measuring instruments, maintain the instruments regularly, prevent the instruments from being damaged, and conduct self-inspection on the instruments used regularly, and keep the self-inspection records properly.

9, with other measurement team members, often exchange learning, cultivate tacit understanding, unified command password, speed up the work efficiency.

10, complete the measurement task assigned by the leader temporarily in time.

The duties of highway surveyors. Carry out the survey work in strict accordance with the detailed rules for the implementation of the survey work, check carefully and diligently, prevent survey accidents and ensure the survey accuracy.

Second, seriously implement the precautions for the use of measuring instruments, establish accounting for measuring instruments, strengthen the maintenance, use and self-inspection of instruments, prevent the damage of instruments, conduct self-inspection on the instruments used regularly, and properly keep self-inspection records.

Three, responsible for the formulation of the project measurement scheme and the implementation of measurement and measurement management measures.

Four, responsible for the handover pile survey before construction, the formation of measurement results, the layout of control network during construction, construction lofting, disclosure of measurement technical data, etc. , to ensure the normal construction of the project.

Five, responsible for the through measurement, completion handover measurement, etc. Correct the survey deviation in construction and participate in the analysis of survey accidents.

Six, responsible for sorting out the original measurement records, compiling the information in the industry, saving the measurement records, and performing the procedures of signing and changing hands for review.

Seven, complete other tasks not listed in the survey.

Responsibilities of highway surveyors 5 1. The surveyor is led by the technical person in charge of the project and works under the guidance of the superior business department. They should study hard, be familiar with construction drawings, and enhance their ability of reading, examining and drawing.

2. Be responsible for the layout of building control piles and leveling points, and master the ability of different engineering types, different construction methods and different measurement and setting-out requirements.

3. Be responsible for the control line measurement and elevation transmission, supervision and inspection, and the calculation and inspection ability of various geometric shapes, data and points in the construction process.

4. Understand the error theory, be able to take measures against the causes of errors, and have the ability to observe various data.

5, according to different site conditions, comprehensive analysis of the ability to deal with problems.

6. Please collect and keep all the measuring instruments, understand the structure and principle of the instruments, master the ability of using, calibrating and maintaining the instruments, and ensure that the instruments are in good working condition.

7, understand the type of work safety, technical operation procedures, construction acceptance and quality evaluation standards, fill in the preview report, declaration form and take cover engineering data printing, storage.

8, responsible for measuring unreeling and implementation plan.

9, at any time to report to the technical director measuring unreeling and inspection problems, do a good job.

Highway surveyor 6 responsibilities 1, independently complete indoor and outdoor work of traverse points and site construction lofting work.

2, responsible for the engineering survey of the construction project, to do a good job of measurement disclosure and project measurement review and acceptance.

3, make all kinds of measurement records, to ensure the accuracy of the construction pay-off and measurement requirements.

4. Complete the compilation of the data in the measurement page and save the measurement records.

6. Be responsible for project completion survey and compilation of completion data, including as-built drawings.

7. Responsible for the custody, inspection and annual inspection of measuring instruments.

8, complete other work assigned by the leadership.

Responsibilities of highway surveyors 7 1. Go deep into the construction site, read the drawings, arrange the construction, assist the project manager to collect, keep and archive the engineering data, and be responsible for the progress and quality of the on-site construction.

2. Collect project completion data, settlement data and all documents formed in the construction process, be responsible for the visa and settlement of engineering data, have independent and skilled working ability, and experienced people are preferred.

3. Strong sense of responsibility, hard work, good team spirit and communication skills.

4. Have a deep understanding of the quality, safety and civilized construction management of building construction, and have good adaptability and communication skills on the construction site.

5. Familiar with building construction specifications, construction procedures and technical requirements, familiar with construction drawings and materials, accurately calculate quantities, understand construction and acceptance specifications, and arrange and implement civilized construction sites according to the construction site layout.

6. During the whole construction process, take full responsibility for the construction period, quality, safety, cost and civilized construction.

7, in the process of construction, responsible for the progress of the project, coordination team members, materials, machinery and equipment in and out, use.

8, comprehensive ability is strong, have a sense of responsibility, dare and good at managing the construction team, can live on the site for a long time.

Responsibilities of highway surveyors 8 1. Surveyors are directly responsible for engineering construction survey.

2. Strictly implement various construction specifications, quality inspection and evaluation standards issued by the state, as well as the corresponding program documents and work instructions of ISO9000.

3. Before measurement, be sure to be familiar with the construction drawings carefully, make clear the measurement requirements of each part, and calibrate the measuring instruments. Only when the measuring instruments meet the requirements can you measure.

4. Accurately measure the plane control network and elevation control network of the facility workers, and encrypt the control points to meet the construction requirements.

5. Strictly carry out the technical disclosure of construction survey, carefully carry out the construction survey and retest of each process, restore the damaged piles in time, and ensure the construction progress and measurement quality.

6, carefully keep the measuring instruments, and regularly check and submit the measuring instruments to ensure the accuracy of the instruments.

Responsibilities of highway surveyors 9 1. Using all kinds of measuring instruments and software, calculating and drawing by professional measuring software;

2. Conduct outdoor surveying and mapping according to the outdoor operation process;

3. Use professional knowledge to conduct land survey;

4. Drawings with surveying and mapping data;

5. According to the requirements of the project, be responsible for field surveying and mapping of the survey area;

6, responsible for surveying and mapping results ` sorting, quality inspection.

Responsibilities of highway surveyor: 10 1. Under the guidance of the person in charge of measurement, be responsible for the measurement of this bid;

2. Take part in the handover pile of this bid section, and carry out retest, data calculation and sorting in time;

3. Participate in the selection and layout of the control network in this bid section, carry out layout, and calculate and sort out the data in the industry;

4. Route selection and positioning of temporary facilities;

5, responsible for the bid temporary leveling points for measurement;

6. Be responsible for the positioning of all kinds of control buildings in this bid;

7. Be responsible for the setting of control points in the hole of this bid section and the inspection of construction survey in the hole;

8. Provide necessary measurement data for design changes;

9. Prepare and submit all kinds of measurement data and reports to the owner in time;

10, do a good job of deformation observation of each building;

1 1, responsible for the completion survey and compilation of completion data of this bid section;

12, earnestly study business knowledge, master advanced working methods, and improve work efficiency and quality;

13, actively cooperate with relevant departments in the work to ensure the smooth progress and successful completion of the project;

14. Complete other tasks assigned by the leaders.

Responsibilities of highway surveyors 1 1 1. Conscientiously implement the national surveying and mapping industry regulations, rules and regulations on the management of various projects.

Second, strictly abide by the rules and regulations stipulated by the project department.

III. Participate in measurement activities and technical exchange activities organized by the Project Department.

Four, take good care of measuring instruments, do a good job of instrument maintenance, regular inspection and calibration, to ensure that the instrument is accurate and in good condition, to ensure normal work.

Five, to undertake all kinds of survey control points and signs delivered by the project department, and do a good job of protection.

Six, earnestly do a good job in the field of measuring unreeling, strictly implement the system of self-inspection. After the completion of self-inspection, report to the supervisor in time as required, and be responsible for completing the measurement handover of adjacent processes.

Seven, conscientiously do a good job in the industry survey data, and according to the progress of the survey data, complete the compilation of completion survey data.

Responsibilities of highway surveyors 12 1. The surveyor is led by the technical person in charge of the project and works under the guidance of the superior business department. They should study hard and be familiar with the construction drawings in order to improve their awareness, review and drawing potential.

2. Be responsible for the layout of building control piles and leveling points, and master the potential requirements of different engineering types, different construction methods and different measuring and setting-out.

3, responsible for the control line measurement and elevation transmission in the process of construction, supervision and inspection, for all kinds of geometry, data and point calculation and check the potential.

4. Understand the error theory, take measures against the causes of errors, and the potential of various observation data.

5, according to different site conditions, comprehensive analysis of the potential to deal with the problem.

6. Please collect and keep all measuring instruments, understand the structure and principle of instruments, grasp the potential of instrument use, calibration and maintenance, and ensure that the instruments are in good working condition.

7, understand the type of work safety, technical operation procedures, construction acceptance and quality evaluation standards, fill in the preview report, declaration form and take cover engineering data printing, storage.

8, responsible for measuring unreeling and implementation plan.

9, at any time to report to the technical director measuring unreeling status and inspection problems, do a good job.

Job responsibilities of highway surveyor 13 1, under 35 years old, college degree or above, major in surveying;

2. At least 3 years relevant working experience (overseas working experience is preferred);

3, familiar with the basic theory and principle of engineering survey, familiar with the theory, operation and storage of total station, gps instruments and other measuring equipment, can be independently responsible for related measurement work;

4. Be able to establish gps traverse network independently and be familiar with the conversion between gps and total station. Familiar with the conversion between Gaussian system and utm system

5. Skillful use of office and cad software, able to independently sort out and improve the survey data in the industry;

Responsibilities of highway surveyors 14 1. The surveyor is led by the technical person in charge of the project and works under the guidance of the superior business department. They should study hard, be familiar with construction drawings, and enhance their ability of reading, examining and drawing.

2. Be responsible for the layout of building control piles and leveling points, and master different engineering types, different construction methods and different requirements for measuring and setting out.

3, responsible for the control line measurement and elevation transmission in the process of construction, supervision and inspection, calculation and inspection of various geometric shapes, data and points.

4. Understand the error theory, be able to take measures against the causes of errors, and the ability to observe various data.

5, according to different scenarios, comprehensive analysis of the ability to deal with problems.

6. Please collect and keep all measuring instruments, understand the structure and principle of the instruments, master the skills of instrument use, calibration and maintenance, and ensure that the instruments are in good working condition.

7, understand the type of work safety, technical operation procedures, construction acceptance and quality evaluation standards, fill in the preview report, declaration form and take cover engineering data printing, storage.

8, responsible for measuring unreeling and implementation plan.

9, at any time to report to the technical director measuring unreeling site and check the problem, do a good job.

Responsibilities of highway surveyor: 15 1. Conscientiously implement the national and ministerial survey specifications, and be responsible for the construction survey control and daily survey work of this project.

2. The measured data and original records shall be authentic, clear and accurate, so as to provide accurate data for construction.

3, can independently or jointly complete the engineering control network survey work, adhere to the survey retest system. All levels of control measurement must be carried out in strict accordance with the relevant specifications, and the measurement and calculation results are put forward.

4, according to the situation of the construction site, to the material department supply purchasing plan of measuring instruments.

5. The measured data and original records shall be bound into a book in time, numbered and filed.

6, earnestly do a good job in the maintenance and custody of measuring instruments, regular calibration, to ensure the accuracy of measuring instruments.

7, adhere to the system of self-inspection and mutual inspection of measurement work, put an end to the occurrence of major quality accidents.

8. Regularly check and maintain the position of control piles to prevent damage and movement.

9. Check and control piles (points) during construction. If any abnormality is found, it shall be retested and corrected in time. Before pouring concrete, provide axis inspection points and elevation control points, and make measurement data in time.

Job Responsibilities of Highway Surveyor 16 I. Job Description

The responsibility of this position is to assist the survey engineer to carry out and complete all the work in engineering survey, and deal with the affairs related to survey in detail.

Second, the position

(1) Assist the survey engineer in carrying out field survey instruments, straightedge, operation and indoor calculation.

⑵ Assist the measurement engineer in daily maintenance, calibration, repair and storage of measuring instruments.

⑶ Assist the survey engineer in sorting, keeping and filing the survey original data.

(4) Participate in the joint review of drawings and elevations of various subdivisional works, and make necessary analysis on the problems.

5] Assist the survey engineer in the comprehensive survey of this project.

Three. Functions and powers

(1) has the right to inspect and spot check the site construction and lofting of the construction squadron.

(2) Have the right to suggest purchasing measuring instruments and measuring schemes.

Four. accountability

(1) Be directly responsible for not obeying the work arrangement of the survey engineer or not strictly implementing the work arrangement, which will affect the project quality and progress.

(2) Take direct responsibility for the custody or loss of the original measurement data.

(3) Take direct responsibility for the damage or loss of measuring instruments caused by improper operation and storage.

(4) The delay in checking the lofting of each construction squadron will directly affect the construction progress.

Responsibilities of Highway Surveyor 17 Responsibilities:

1, according to the engineering construction drawing, technical requirements, project progress, project budget, procedures, quality requirements and safety standards to organize on-site measurement;

2, responsible for surveying and mapping project results of self-examination and preliminary examination;

3, responsible for the use, maintenance, technical testing and daily cleaning of surveying and mapping instruments;

4, responsible for the confidentiality of surveying and mapping files, manage the surveying and mapping data of this unit.

Job responsibilities:

1, bachelor degree or above, major in engineering survey or other related fields;

At least 2.2 years working experience as a surveyor, having done large-scale projects such as gardens and municipal administration, and having professional qualification certificate as a surveyor;

3, familiar with the basic theory and principle of engineering survey, familiar with the basic operation of total station and gps instrument;

4. Have a hard-working spirit, practical and capable, strong learning ability, high sense of responsibility and good teamwork ability;

5, can adapt to the field.

Responsibilities of Highway Surveyor 18 Responsibilities:

1, using various measuring instruments and software, and calculating and drawing by professional measuring software;

2. Conduct outdoor surveying and mapping according to the outdoor operation process;

3, the use of professional knowledge for engineering construction survey and other engineering survey, in strict accordance with the detailed rules for the implementation of the survey work, to avoid measurement accidents, to ensure the accuracy of the survey;

4. Analyze the measurement data, evaluate the measurement results, and prepare the analysis report;

5. Be responsible for the technical supervision and management of the surveying specialty of the engineering construction unit;

6. Responsible for the weekly inspection and maintenance of measuring instruments, equipment and facilities.

Qualifications:

1, major in engineering survey or civil engineering;

More than 2.3 years working experience in field survey, and those with surveying and mapping qualification certificate are preferred;

3. Proficient in surveying and mapping engineering;

4, familiar with the use of theodolite, total station, level and other related measuring instruments, skilled use of South cass, autocad.

5. Familiar with engineering survey and construction business processes, with strong engineering survey skills;

6. Being in good health, able to adapt to working abroad for a long time, and hard-working;

7. Good communication and coordination skills, honest and steady, and strong sense of responsibility.