Job Recruitment Website - Zhaopincom - How much does the 1432 cylindrical grinder of Beijing Machine Tool Plant weigh?
How much does the 1432 cylindrical grinder of Beijing Machine Tool Plant weigh?
Brief introduction of Beijing machine tool plant
The predecessor of Beiping No.1 Machine Tool Plant was Beiping Machinery General Factory, which was mainly formed by the First to Eighth Machinery Repair Institutes of the former National Government in Beiping after the liberation of Beiping.
19 1 1 3 years, Feng, a national capitalist in Beijing and China, founded Yongzeng Iron Works. When the factory first opened, it did whatever it got. Later, it produced winches, pumps, diesel engines, human headstock and human axles.
Thirty-one years after 1942, almost all guns and shells were produced. After Japan surrendered, it changed to the No.5 Factory of Tianjin No.1 Machinery Factory of China Textile Corporation to manufacture textile machinery.
1948 in 1937, it was changed to the eighth machine shop, which specialized in repairing and manufacturing firearms. On the eve of liberation, the factory had about 400 employees and about 60 sets of equipment.
- Related articles
- How can I operate well after joining the takeaway platform?
- Does Qingxi Mingmen Factory need a physical examination?
- 20 19 Henan state grid, can I take the civil engineering exam?
- Linqu No.1 Middle School is better or Weifang No.1 Middle School is better?
- What does a credit information company do?
- Which is better for employment, Java or python?
- Are the teachers of Shunde Desheng School in Foshan tired?
- What are the requirements for Shenyang Sany Heavy Equipment Recruitment?
- Ranking of ultra-low nitrogen gas-fired vacuum hot water boilers
- Will you set up in different counties?