Job Recruitment Website - Zhaopincom - Is there a medium-and long-term high-speed rail plan in Dazhou?

Is there a medium-and long-term high-speed rail plan in Dazhou?

Yes, the railway from Bazhong to Dazhou.

Bazhong-Dazhou Railway is a national first-class railway and one of the key projects in the 11th Five-Year Plan of Sichuan Province. Railway is an important channel connecting Dazhou and Bazhong.

After the completion of the Bazhong-Dazhou Railway, it will be connected with the Guangba Railway to form the Guangda Railway. Guangda Railway will cross the whole territory of Bazhong, connect Xiangyu Railway, Dawan Railway and baoji-chengdu railway at the same time, and be integrated into the national railway network, becoming the main artery of economic and social development in Bazhong.

Bazhong-Dazhou Railway starts from Bazhong Station, the terminal station of Guangba Railway in the north, crosses the Zhouhe River in the southeast, passes through Hanshui Town of Bazhong City and Shiqiao Town of Dazhou City to Longhui Township and Dushi Town, and is connected with Xiangyu Railway in different directions. It is connected to Chongqing end of Qinjiaba Station in the north and Chongqing end of Dushi Station in the south, with a total length of 124 km, 75 large, medium and small bridges and bridges1. The original planned construction period was 3 years, which was later extended to 20 15.